Amended Attach3 Schedule of Items Offer Sheet.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Cordova Elevator Modernization Federal contract opportunity
Solicitation number
1240BF22R0001
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Cordova Elevator Modernization, newest first.
File Type Posted
Amended 1240BF22R0001 RFP Cordova Elevator Modernization.pdf PDF
Amendment 1 RFP Cordova Elevator Modernization.pdf PDF
Attachment 4 Fire Alarm Panel.JPG JPG image
Attachment 5 Fire Alarm 2.JPG JPG image
Attachment 6 Ceiling.JPG JPG image
QA for CRD Elevator Modernization.pdf PDF
1240BF22R0001 RFP Cordova Elevator Modernization.pdf PDF
Attach1 SOO Cordova Elevator Modernization.pdf PDF
Attach3 Schedule of Items Offer Sheet.xlsx XLSX spreadsheet
Attach2 WD 2015 5687 R17 03.15.2022 Kodiak etc.pdf PDF
Appendix1 Photos.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SUMMARY SHEET

ONLY FILL OUT THE YELLOW HIGHLIGHTED CELLS THROUGHOUT THIS BID SHEET
Submit the actual spreadsheet in Excel format

Cordova Elevator Modernization

1240BF22R0001
Company Name:
Point of Contact (POC):
CAGE Code:
UEI Number:Please try to start using UEI
DUNS Number:< --- this number is going away
Address:
Phone:
E-mail:
Item NumberDescriptionQuantityUnit of IssueUnit PriceTotal
0001Furnish and Install: Door sensing mechanism/protection device1EA$0.00
0002Furnish and Install: Car operating panel1EA$0.00
0003Furnish and Install: Hall station replacements for three floors3EA$0.00
0004Furnish and Install: Door operator1EA$0.00
0005Furnish and Install: Solid state starter1EA$0.00
0006Furnish and Install: Hydraulic power unit (pump, motor, and valve)1EA$0.00
0007Furnish and Install: Control of access to each floor, and the ability to connect a card access station, either inside the car, or in the hallways.3EA$0.00
Option Item
0008Furnish and install return to ground function in the case of a power outage1LS$0.00
Provide a proposed Period of Performance Fill in: _________ to ________.
Grand Total:$0.00
52.212-1 Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items , or alternative commercial products or commercial services for satisfying the requirements of this solicitation. Each offer submitted will be evaluated separately.

Option Items that are not listed above, but of value to Government, shall be listed as Option items in Proposed Schedule of items, if applicable. Evaluation of options will not obligate the Government to exercise the option(s).

Sheet1

BASE YEAR
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0002Category I Administrative Buildings
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year)
QTYUNITUNIT PRICETOTAL COST
0002AACategory I Administrative Buildings Rest Room Cleans2,620,889sq. ft$ 0.0408$ 106,932.25*55,026x47.63= 2,620,888.58 SF (11month period)55026.0041990342522,861,352.22
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.0520.00
Period of Performance: 11 months (Base Year)0520.00
QTYUNITUNIT PRICETOTAL COSTERROR:#VALUE!52ERROR:#VALUE!
0002ABCategory I Administrative Buildings Hard Floor Cleans6,586,752sq. ft$ 0.0231$ 152,153.97*94,515x47.63= 4,501,749.45 SF138289.986773042527,191,079.31
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.0520.00
Period of Performance: 11 months (Base Year)0520.00
QTYUNITUNIT PRICETOTAL COSTERROR:#VALUE!52ERROR:#VALUE!
0002ACCategory I Administrative Buildings Carpet Floor Cleans1,204,420sq. ft$ 0.0192$ 23,124.87*19,831x47.63= 944,550.53 SF25287.0098677304521,314,924.51
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.$ 282,211.100520.00
Period of Performance: 11 months (Base Year)0520.00
0520.00
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST520.00
0003Category II Child Development Facilities520.00
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.52
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0003AACategory II Child Development Facilities Hard Floor Cleans11,485,212sq. ft$ 0.0252$ 289,427.35*390,060x238.15weeks = 9,302,139 SFTOTAL: 11,485,212.42 SF
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.*7,639x285.78 weeks = 2,183,073 SF
Period of Performance: 11 months (Base Year)
QTYUNITUNIT PRICETOTAL COST
0003ABCategory II Child Development Facilities Carpet Floor Cleans685,729sq. ft$ 0.0194$ 13,303.14*1113x238.15 weeks = 265,060.95 SFTOTAL: 685,729.11
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.*1472x285.78 weeks = 420,668.16 SF
Period of Performance: 11 months (Base Year)$ 302,730.50
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0004Category III Physical Fitness Centers
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0004AACategory III Physical Fitness Centers Hard Floor Cleans3,010,146sq. ft$ 0.0344$ 103,549.02Bldg 3452(6W) 1,330,305.90 SF1W*Hockey 1,323x17.32 = 22,914.36 SF1,330,305.90
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.Bldg 3709 (7W) 1,416,325.68 SF6W*Hockey 1,323x30.31= 240,600.00 SF1,416,325.68
Period of Performance: 11 months (Base Year).22,914.36
QTYUNITUNIT PRICETOTAL COST240,600.00
0004ABCategory III Continuous Cleaning Physical Fitness Center Bldg 370911monthly$ 4,322.26$ 47,544.86Total Hours 1,657.05Provide locker room cleaning from 13:00-15:30 daily 1Male/1Female 2-1/2 hours each.3,010,145.94
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year).
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0005Special /Emergency/Bio-Hazard Cleans
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0005AASpecial Cleaning40,538per sq. ft$ 0.28$ 11,472.25
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Special Cleaning CLIN represents 20% of the total square footage for the contract.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0005ABEmergency Cleaning22,296per sq. ft$ 0.38$ 8,405.59
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Emergency Cleaning CLIN represents 11% of the total square footage for the contract.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0005ACBio-Hazard Cleaning10,134per sq. ft$ 1.13$ 11,471.69
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Special Cleaning CLIN represents 5% of the total square footage for the contract.
Period of Performance: 11 months (Base Year).
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0006CONTRACT MANPOWER REPORTING1EA$ 100.0000$ 100.0000
Contractor Manpower Reporting Costs: 1 May 2016 to 30 March 2017. The Contractor Manpower Reporting requirement is associated with the Office of the Assistant Secretary of the Army (Manpower and Reserve Affairs) requirement to obtain better visibility of the Contractor service workforce.
The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown.
BASE YEAR TOTAL COST:$ 767,485.01