SOW_fire suppression repair.pdf
PDF 487 KB Posted
- Attached to
- Fire Suppression System Repair Federal contract opportunity
- Solicitation number
- 12405B25Q0105
About this file
This Statement of Work (SOW) details an emergency fire suppression system repair for the Dale Bumper National Rice Research Center (DBNRRC) in Stuttgart, Arkansas. The project requires a contractor to comprehensively repair and inspect the facility's fire suppression system, including replacing the Altitude valve, inspecting the 80,000-gallon water holding tank, replacing sensors, switches, and float systems, replacing access panel gaskets, pressurizing the system for leak detection, and ensuring all system components are properly monitored by the fire panel.
The project has a strict 90-day completion timeline from the notice to proceed, with work hours restricted to Monday through Friday, 7 A.M. to 4 P.M., excluding government holidays. Contractors are encouraged to conduct a site visit with a government representative to confirm project specifics before submitting a quote. The contractor will be responsible for providing all parts, labor, equipment, software, program adjustments, and personal protective equipment necessary to fully restore the fire suppression system to operational status.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SCA Wage Determinations_12405B25Q0105.pdf | ||
| Combined synopsis solicitation_fire suppression repair updated.pdf | ||
| Solicitation clauses and provisions_fire repair updated.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Emergency Fire Suppression System Repair
Dale Bumper National Rice Research Center
(DBNRRC)
2890 Highway 130 E Stuttgart, AR 72160
1.0 Introduction
This is an emergency repair on the fire suppression system at the Dale Bumpers National Rice Research Center (DBNRRC) 2890 AR – 130 East, Stuttgart Arkansas 72160. This project will consist of replacing the Altitude Valve, inspecting the 80,000-gallon water holding tank, replacing the inspection access gaskets, pressurizing the fire suppression system to determine if system has any water leaks, replacing all sensors and floats on the water holding tank and ensuring all pumps, water pressure drops, valves and switches in the system are monitored by the fire panel inside the building.
Summary of services:
Contractor will be responsible for all parts and labor to get the fire system fully operational.
The contractor shall include all services and field labor, equipment and software to make program adjustments, necessary to perform the service contract and personal protective equipment necessary to perform the work.
2.0 Project Objectives
The project consists of the following elements:
1. Replace the Altitude valve.
2. Replace all sensors and switches.
3. Inspect the 80,000-gallon water holding tank for leaks and condition.
4. Replace the access panel gaskets on the water holding tank.
5. Pressurize the system for leak detection.
6. Replace the float system on the water holding tank.
7. Ensure all pumps, water pressure drops, pumps, valves and switches in the system are monitored by the fire panel inside the building.
8. Ensure all tamper switches are operable and communicating with the fire panel.
3.0 Site Visit
Contractors are encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a quote is submitted. The site visit shall be for the purpose of observing first-hand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where Contract Documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable.
4.0 Project Schedule:
The completion of this project shall not exceed 90 days from date of notice to proceed. A request for time extension must be submitted to the Contracting Specialist in writing.
Each request must include specific and detailed reasons in support of the schedule alteration.
Work Hours:
Contractor work hours shall be Monday through Friday, seven (7) A.M. to four (4) P.M.
with the exception of Government holidays. Any changes to work schedule shall be submitted to Contacting Officer for written approval prior to schedule change.