USDA_CS.pdf
PDF 2 MB Posted
- Attached to
- HVAC Replacement Federal contract opportunity
- Solicitation number
- 12405B22Q0216
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| USDA_M4.3.pdf | ||
| USDA_M6.1.pdf | ||
| USDA_E4.3.pdf | ||
| Updated SOW Bld3-Rm3 HVAC Replacement _Florence SC.docx | DOCX document | |
| Service Clauses.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF AGRICULTURE
AGRICULTURAL RESEARCH SERVICE
FACILITIES ENGINEERING SECTION
SOUTH ATLANTIC AREA
RENOVATE BUILDINGS No. 1, No. 2, No. 3
FLORENCE, SOUTH CAROLINA w cc I- i:5 ...J ~ :::) 0 r-- 0 F [;; - ~~ cc re X
9: 55 ...... 1-.l"l z
I I I
I I I
~ I I I
:::, 0 ~ LL O ·<0 ______ ....,.
(/) 0.. 0 0 . ,,., 10..:
I- <( -z O (!)
Z O ''"'" - 0 -------------------------~----------------------------~-----------------~--------------------w t;zw w g (!)
_________ D_RA_W_IN_G_L_IS_T _____ --+-________ P_R_O_J_E_C_T_I_NT_E_N_T _______ ----+ ____ L_O_C_A_T_I_O_N_M_A_P ____ -+--____ V_IC_I_N_IT_Y_M_A_P _________ ~ ~ ~g cs G-0.1 D-4.1 A-4.1
M-4.1 M-4.2 M-4.3 M-6.1
E-0.1 E-4.1 E-4.2 E-4.3
P-0.1 P-4.2
COVER SHEET
GENERAL NOTES AND SYMBOLS
ENLARGED DEMOLITION PLANS
ENLARGED NEW CONSTRUCTION PLANS
ENLARGED MECHANICAL PLANS
ENLARGED MECHANICAL PLANS
ENLARGED MECHANICAL PLANS
MECHANICAL SCHEDULES AND DIAGRAMS
ELECTRICAL NOTES AND SYMBOLS
ENLARGED ELECTRICAL PLANS
ENLARGED ELECTRICAL PLANS
ENLARGED ELECTRICAL PLANS
PLUMBING NOTES AND SYMBOLS
ENLARGED PLUMBING PLANS
BUILDING 2, ROOM 3
THIS PROJECT WILL INSTALL A NEW 100% OUTSIDE AIR HVAC
SYSTEM AND VARIABLE RA TE EXHAUST SYSTEM, ADD
INSULATION TO THE UNDERSIDE OF THE ROOF DECK AND
ABOVE THE CEILING GRID, INSTALL A NEW CEILING GRID
SYSTEM AND LIGHTING, AND SEAL ALL PENETRATIONS
THROUGH THE ROOM ENVELOPE.
BUILDING 1, LAB 1
THIS PROJECT WILL INSTALL NEW LOWER AND UPPER
CABINETS, NEW COUNTERTOPS AND SINKS, NEW PLUMBING,
NEW FLOOR TILE, INSTALL A NEW CEILING GRID SYSTEM AND
LIGHTING, ADD INSULATION ABOVE THE CEILING GRID AND
REPAINT THE LAB.
BUILDING 3, ROOM 3
THIS PROJECT WILL INSTALL A NEW 100% OUTSIDE AIR HVAC
SYSTEM AND VARIABLE RA TE EXHAUST SYSTEM, ADD
INSULATION TO THE UNDERSIDE OF THE ROOF DECK AND
ABOVE THE CEILING GRID, INSTALL A NEW CEILING GRID
SYSTEM AND LIGHTING, AND SEAL ALL PENETRATIONS
THROUGH THE ROOM ENVELOPE.
BUILDING 1, MEN'S RESTROOM
THIS PROJECT WILL RENOVATE THE MEN'S RESTROOM AND
WILL INSTALL A NEW EXHAUST SYSTEM, INSTALL A NEW
CEILING GRID SYSTEM AND LIGHTING, ADD INSULATION
ABOVE THE CEILING GRID, INSTALL NEW WALLS, INSTALL
NEW FLOOR TILES, INSTALL NEW PLUMBING FIXTURES AND
INSTALL NEW TOILET COMPARTMENTS AND PARTITIONS.
Copyright : These Drawings are the property of Poole Engineering Inc., and reuse on any other project without written permission will result in legal action.
I BLDG 3
~-J l __
~ Lr--, C
1 r BL□G"zl
BLDG 1
f I -cc cc L,J :r:
w "~ <C L,J ~ a. ~ .J w ~8 L,J
C (/) ~
■ !:!::! O')
Cl) ~
0::::
u w 0::::
0::::
LL
T""" z 0 - ~ Cl) > 1-o 0 zW w..., a: i
■ C.
0 en -:iE
IJ)
u
~ I i 0 I !i1 0 11 o.. o I o
Kevin.Magee Highlight
File details come from the government source that posted it. Updated .