Attachment I - SOW Switchgear and Panel Replacement Shelling Plant - Updated 09-01-2021.pdf

PDF 2 MB Posted

Attached to
Switchgear and Panel Replacement at Shelling Plant - Dawson, GA Federal contract opportunity
Solicitation number
12405B21Q0099
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

United States Department of Agriculture

Agricultural Research Service

STATEMENT OF WORK

Switchgear Replacement

Shelling Plant

National Peanut Research Laboratory

1011 FORRESTER DR, S.E.

DAWSON, GA 39842

Asset IDs 660400B002

Prepared by: Tochie Ezento

Date: 8/31/2021

2 | P a g e

1.0 CONTRACT PROJECT:

Project Title: Switchgear Replacement

Project Location: National Peanut Research Laboratory 1011 Forrester Dr., S.E.

Dawson, GA 39842

2.0 PROJECT CONTACT PERSONS:

Name and Address Contact Information:

Contracting Officer

(CO)

Nicholas D. Langley 2775 F&B Road College Station, TX 77845

Nicholas.Langley@usda.gov

Engineering Project Manager (EPM)

Tochie U. Ezento 141 Experiment Station Rd Stoneville, MS 38776

Office: 832-866-1194 tochie.ezento@usda.gov

Location Monitor

(LM)

Hector Rodriguez 1011 Forrester Dr., SE

Office: 229-995-7418 hector.rodriguez@usda.gov

Research Lead

Marshall Lamb 1011 Forrester Dr., SE

229-995-7417 marshall.lamb@usda.gov

Safety, Health, & Environmental Management Branch (SHEMB) Representative

David Daniels 950 College Station Rd Athens, GA 30605

Office: (706) 248-8194 david.daniels@usda.gov

3.0 SCOPE OF SERVICES:

The Contractor shall provide all professional services necessary for the accomplishment of the contract project and such required services shall be in accordance with requirements as described herein.

a. The Contractor shall provide services for the following tasks marked by an “X”:

[X] Provide a quote to complete the project as per project requirements.

[X] Provide and install all material and or equipment to complete scope of work as required by the project.

mailto:tochie.ezento@usda.gov mailto:david.daniels@usda.gov

3 | P a g e

4.0 PROJECT DESCRIPTION AND REQUIREMENTS:

This project involves the removal and replacement of one switchgear, and associated equipment with a new switchgear with a 36-inch enclose that meets all current codes.

This switchgear will be installed in the shelling plant. The switchgear at the shelling plant currently has three (3) sections.

The contractor shall provide a switchgear unit that is 200KAIC or better in a 36-inch enclosure. The switchgear specifications should be verified to ensure that at a minimum, all features and operating parameters available in the existing switchgear is also available in the new equipment.

The location does not want to substitute equipment such as a panel board or switch board installed even if it meets the design parameters specified in this statement of work. Only a switchgear will be accepted. A switchgear is required to facilitate for future expansions and ease of maintenance during the entire lifecycle of the equipment.

It is recommended that contractors do a site visit prior to quoting to be fully familiar with site conditions where the work will be performed and get a clear understanding of the project scope. Contractors should field verify location of all existing devices, inlet cables, underground utility lines, manholes and transformers. Equipment pictures are shown in appendix A. Provide all labor, equipment, materials, tools, lifting equipment, temporary generator if required, electrical cables, conduits, switches, bus ways, breakers, and circuit breaker.

The new switchgear shall meet the latest NEMA STD SG-5, ANSI STD C 37.20.1, and UL STD 5058. circuit protection must meet ANSI 37-13, NEMA SG-3 and UL 1066.

All electrical power outages shall be scheduled in advance and coordinated with USDA location monitor. Contractor shall ensure compliance with OSHA safety requirements during construction.

PROJECT SCHEDULE: The timeframe for this project shall not exceed 150 calendar days after Notice to Proceed (NTP) has been issued. Lead time for procurement of equipment and materials has been factored in this duration.

5.0 PRE-CONSTRUCTION

a. Pre-Construction Submittals

Prior to Construction the following submittals must be submitted to the Contracting Officer (CO) for approval:

4 | P a g e

1. Work hours (include, daily start, stop time and scheduled workdays)

2. High level Schedule.

3. Construction work presented in a cost break-out format resembling a Schedule of Values will be submitted. Written work outline will be submitted.

4. Accident Prevention Plan (APP)

5. The construction contractor (CC) shall provide to the CO a list of contract personnel of the general and subcontractors, who will be emergency contacts, including address, and telephone numbers for use in an emergency. As changes occur and additional information becomes available, the CC shall update the list.

6. Contractor must always have a superintendent on the job when working on this project certified per Contractor’s APP. It is acceptable to utilize any subcontractor’s superintendent if certified and included in APP.

6.0 GENERAL REQUIREMENTS:

6.1 Demolition:

a. Contractor shall coordinate demolition of existing installation with location monitor.

b. All disturbances of existing systems shall be thoroughly coordinated with the location monitor to prevent disconnecting equipment that might jeopardize on-going research.

c. Contractor shall legally dispose of all equipment/materials that will not be retained.

d. Contractor shall divert project waste to recycle where practical. The Contractor shall track and document the amount of waste diverted to recycle. The Contractor shall submit diversion documentation as part of closeout. If no waste is diverted to recycle, the Contractor shall submit a letter stating this and why diversion was not practical.

6.2 Submittals (Digital Only, No Hard Copies):

Provide manufacturer’s descriptive literature/shop drawings for all materials and equipment to the EPM/CO for review. The descriptive literature shall be annotated/ highlighted to show its conformance with contract requirements. Contractor is responsible for any costs incurred for equipment ordered without prior approval.

Required submittals:

a. Switchgears and associated equipment, drawings, operating manual, etc.

6.3 Protection of Work and Property/Safety Requirements:

5 | P a g e

a. The Contractor shall protect the work site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the Contractor’s expense, to pre-damaged condition to the satisfaction of the EPM and Location monitor.

b. Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities.

c. The Contractor shall provide all safety equipment/devices, MSDS, personal protective equipment and clothing as required for its employees. Copies of all MSDS shall be provided to the EPM and Location monitor.

d. The Contractor as well as the on-site supervisor will have completed no less than 30 hours of OSHA approved safety training. All other Contractor employees will have no less than 10 hours of OSHA approved safety training

6.4 Temporary Facilities:

a. Temporary utilities (electricity) may be furnished to the Contractor by the Government, if so requested. The Contractor shall maintain and protect all such utilities during construction and shall repair or replace any items damaged through its own negligence.

b. Should the Contractor require any power or utility shutdowns during construction, the Contractor shall obtain the appropriate notification lead time from location monitor prior to the need date.

6.5 Materials and Equipment:

a. The material and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment and shall be the manufacturer’s latest standard design.

b. All materials and equipment to be incorporated in the work shall be handled and stored by the manufacturer, fabricator, suppliers, and Contractor before, during and after shipment in a manner to prevent warping, twisting, breaking, chipping, rusting and any injury, theft or damage of any kind to the materials and equipment. All materials and equipment furnished by the Contractor shall be subjected to inspection and approval by the CO/EPM/Location.

6.6 Cleanup:

6 | P a g e

The construction site shall always be kept clean and free of debris. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused materials, trash, and debris resulting from the work to the satisfaction of the Location monitor.

6.7 Equipment Warranty:

a. Extended Equipment/Product Warranties: Obtain and furnish to the Contracting Officer all written warranties for equipment/products that have extended warranties (warranty periods exceeding the standard one-year warranty) furnished under the contract. The warranty period shall begin on the same date as project acceptance and shall continue for the full/product warranty period. The warranties shall be fully executed and delivered to the Contracting Officer prior to final acceptance of the project completion.

6.8 Final Payment/Contract Closeout: Deliverables before FINAL PAYMENT

• One (1) year warranty on work.

• Contractor payroll

• Final invoice

• Installation and operating manuals for switchgear and associated equipment

• Startup Report

Operations and Maintenance Manuals (O&M): The Contractor shall provide three

(2) complete sets of O&M manuals including a recommended spare parts list identifying components adequate for competitive supply procurement for operation and maintenance of the system. The O&M Manuals shall include maintenance and inspection for all equipment. A three-ring binder containing all the O&M and electronic files shall be provided within the binder.

Operations and Maintenance Training: The Contractor shall provide on-site O&M training for the location which will consist of two (1) formal on-site training session to include but not limited to system operation, corrective and preventive maintenance, and inspections.

The contractor will coordinate with the EPM/Location the scheduling of any training classes in advance. The EPM/Location may require the classes to be provided on non-consecutive days at the convenience of the USDA Staff.

ACCEPTANCE

For the purposes of warranty and payment for the work performed at a location, 7 | P a g e government “Acceptance” will be provided by the USDA upon the completion of all the following:

a. The Contractor has demonstrated/ verified that the implemented function as intended at commissioning. All punch list items identified during the commissioning have been resolved.

b. The Contractor has provided O&M manuals

Appendices

Appendix A – Existing Switchgear and ESD switch Pictures

Appendix B – Proposed Switchgear Bill of Materials

8 | P a g e

Appendix A – Existing Switchgear Pictures

Switchgear Access Doors

9 | P a g e

Switchgear and enclosure

10 | P a g e

Shelling Plant Switchgear and HMI

11 | P a g e

480/277 Volt section

Secondary side nameplate

12 | P a g e

Emergency shutdown switch

13 | P a g e

Back of the main switchgear

14 | P a g e

Overhead cables entering the enclosure

Primary Side nameplate

15 | P a g e

Underground cables entering the enclosure

Main entrance cables

16 | P a g e

Transformer nameplate and HMI

17 | P a g e

Appendix B – Proposed Switchgear Specifications and Original Installation Drawings

18 | P a g e

19 | P a g e

20 | P a g e

21 | P a g e

Riser Diagram

22 | P a g e

Floor Plan of the Shelling Plant (Switchgear is locate in the electrical room)