About this file
This document outlines a federal stewardship contract opportunity for fuels management and road maintenance services. The Mount Hood National Forest is seeking quotes for the Oak Grove Stewardship IRSC to address danger trees along roads damaged in the Riverside Fire. Work includes cutting hazard trees near roads, slash treatment, erosion control, road maintenance and reconstruction, and optional removal of decked logs. The contract location is in Oregon along portions of National Forest System roads 57, 5710, and 46. All work must be completed by October 31, 2023. A pre-solicitation site visit will be held on November 30, 2022 at the junction of roads 460 and 57. Quotes are due on or around January 25, 2023 and award will use best value with a firm fixed price commercial services contract resulting. The agency is the USDA Forest Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 3. Appendix B Product Removal Specs Oak Grove IRSC DRAFT.pdf | ||
| 5. Contract Area Map Oak Grove IRSC DRAFT.pdf | ||
| 1. Solicitation Oak Grove IRSC DRAFT.pdf | ||
| 2. Appendix A Oak Grove IRSC DRAFT.pdf | ||
| 4a.Appendix D Road Specs Oak Grove IRSC DRAFT.pdf | ||
| 4b. Appendix D Road Supplemental Specs Oak Grove IRSC DRAFT.pdf | ||
| OakGrovePreSolicitationSiteVisitAttendees.pdf | ||
| OakGrovePreSolicitationSiteVisitQuestionsList.pdf | ||
| DRAFT Oak Grove Stewardship IRSC Presolicitation Map.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Oak Grove Fire Recovery Stewardship IRSC - DRAFT Mt. Hood National Forest Page 1 of 15 Clackamas River Ranger District
APPENDIX C
C5.31# – ROAD MAINTENANCE REQUIREMENTS. (9/04) Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
PRE HAUL
ROAD TERMINI MILES ROAD MAINTENACE T-SPECIFICATIONS
FROM TO T-811a T-831 T-834 T-838 T-839 T-842 T-854
5700000 (Paved) 0.00 3.28 3.28 C
5710000 (Gravel) 0.00 2.33 2.33 C
4600000 (Paved) 0.00 11.83 11.83 C
DURING HAUL
FROM TO T-811a T-831 T-834 T-838 T-839 T-842 T-854
5700000 (Paved) 0.00 3.28 C
5710000 (Gravel) 0.00 2.33 C
4600000 (Paved) 0.00 11.83
POST HAUL
FROM TO T-811a T-831 T-834 T-838 T-839 T-842 T-854
5700000 (Paved) 0.00 3.28 C
5710000 (Gravel) 0.00 2.33 C C
4600000 (Paved) 0.00 11.83
Notes:
C = Contractor Performance Item See Mt. Hood National Forest Road Rules Policy dated 1-01-1992.
Description of work required by the above listed T-specs is shown in the following ROAD MAINTENANCE REQUIREMENTS SPECIFICATION table
Page 2 of 15 Clackamas River Ranger District
ROAD MAINTENANCE REQUIREMENTS SPECIFICATION TABLE PURSUANT TO
C5.31# - ROAD MAINTENANCE REQUIREMENTS (9/04)
1 2 3 4 5 6 7 8 9 Special Dust Post
Road No. Project Travel Way Brush Abatement Seasonal Haul and Specifi- X And Applic Mainte- Snow
Termini cation Width Slope Comp Log Out *Surfacing** Product Rate Width nance Removal Block Treat 5700000
(PAVED)
0.00-3.28
T838, T842 EX AI N/a 8’ L, 8’ R N/a N/a N/a N/a N/a N/a N/a N/a
5710000
(GRAVEL)
0.00-2.33
T811a, T838, T842 EX AI B 4’ L, 4’ R N/a N/a N/a N/a N/a N/a N/a N/a
4600000 (Paved)
0.00-11.83
T842 EX AI B 8’ L,
8’ R N/a N/a N/a N/a N/a N/a N/a N/a
Notes: Forest Service approved erosion control devices will be required during road maintenance activities (including Blading, Shaping, Ditch Cleaning, and Slide and Slough Removal) and Landing Construction.
These devices may include but are not limited to check dams, silt fencing, straw bales, wattles, staked bio bags, etc.
Surfacing – Roads & Landings that require spot rocking shall be approved by the Contracting Officer.
Surfacing – Aggregate to be obtained from Agency approved commercial source that is reasonably free of seeds and organic materials from noxious weeds and invasive species of concern and shall be placed as staked in the field by the Contracting Officer through the contract administration team.
* Denotes blockage location and type to be flagged by Forest Service at time of placement.
ROAD MAINTENANCE REQUIREMENTS SPECIFICATION CODES TABLE PURSUANT TO C5.31# -
ROAD MAINTENANCE REQUIREMENTS (9/04)
Column No. Heading Entry Explanation
Any Blank Except as otherwise described, no entry indicates Contractor is not authorized or required to perform the work item(s).
Any RC This work requirement applies only when haul of Contract related construction materials occurs.
2 Special Project Specification
Number Entry indicates Special Project Specification which applies.
3 Travel Way EX Contractor shall maintain the traveled way to the width existing upon entry, or at the completion of Specified Road work.
Numbers Contractor shall maintain the traveled way to the standard width indicated by the entry, plus curve widening, in accordance with Section T-811. If required, the road template shall be shaped to this width and to the designated cross slope before haul and during recurring maintenance.
IS, C, OS, F, or
AI
Cross slopes are designated as:
IS (Inslope), C (Crown), OS (Outslope), F (Flat), AI (As Is).
A or B If compaction is required.
4 Brush and
Log Out Numeric & R and or L
Contractor shall remove brush for specified width on either or both the right (R) side or left (L) side of road.
Page 3 of 15 Clackamas River Ranger District
As Staked (AS) Limits of brushing are as staked or marked in the field.
OPT Contractor may use hand or mechanical means of brushing.
H Only hand brushing may be used.
5 Surfacing Aggregate Grading
Contractor shall place surfacing on roads listed according to the grading indicated.
D Contractor is to make deposits for listed road maintenance, including surface rock replacement.
6 Dust Abatement OPT Product selection is Contractor's choice from those listed in Section T- 812.
Product Abbr. Unless otherwise agreed, Contractor is restricted to product listed corresponding to the abbreviation shown in Section T-812; (i.e., LigS = Lignon Sulfonate) Application rates are estimated amounts.
EX Contractor shall abate dust on the existing width.
Numbers Contractor shall abate dust to the width indicated by entry.
7 Seasonal Maintenance
W Waterbars and/or crossditching shall be required prior to expected seasonal precipitation.
B Entrance barriers shall be installed by Contractor prior to nonuse periods.
8 Snow Removal TS Snowplowing authorized for Contractor's Operations without recreation access being provided per Section T-803 requirements.
JU Snowplowing authorized, but must provide for recreation joint use per
Section T-803 requirements.
Blank Snowplowing is not authorized. Forest Service may authorize plowing by permit when not in conflict with other uses.
9 Post Haul P P denotes that work is Contractor's Responsibility to perform.
ROAD MAINTENANCE T-SPECIFICATIONS
Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
SPEC.# DESCRIPTION
T-803 Snow Removal T-811 Blading T-831 Ditch Maintenance T-832 Remove And Endhaul Materials T-834 Drainage Structure Maintenance T-838 Maintenance for High Clearance Vehicle Use T-839 Maintenance for Project Use T-842 Cutting Roadway Vegetation T-854 Treatment and Disposal of Danger Trees T-891 Water Supply and Watering
T-803 - SNOW REMOVAL (05/07)
803.01 Description
This Section provides for removal of snow from roads to facilitate logging operations and safe use.
Page 4 of 15 Clackamas River Ranger District
803.02 Maintenance Requirements
(1) Erect signs required by the Sign Plan in the SUPPLEMENTAL SPECIFICATIONS.
(2) Perform work in a manner to preserve and protect roads and appurtenances, and prevent erosion damage to roads, streams, and other Forest values.
(3) Do not undercut banks. Do not blade gravel or other surfacing material off the road.
(4) Keep roadbed drainage ditches, drain dips, and culverts functional when needed during perations and upon completion of operations.
(5) Control snow removal to identify the usable traveled way having roadbed support. Reshape over-width plowing as necessary to define the usable width.
(6) Space, construct, and maintain drainage holes in the dike of snow or berm caused by snow removal operations. Place drain holes to obtain surface drainage without discharging on erodible fills.
(7) Close roads to wheeled vehicles at times and in the manner specified in K-F.1.2# or the Road Rules document.
(8) Upon seasonal completion of Contractor's Operations, effectively block the road by a snow barricade, unless otherwise approved by the Contracting Officer.
(9) Remove snow for either public access or project use as established in the SUPPLEMENTAL SPECIFICATIONS and meet the following requirements:
(a) Removal for Public Access (Method JU) - Remove snow from all of the traveled way, including turnouts, for safe and efficient use for both timber transportation and the public. Remove intruding windfalls, debris, or slough and slide material for the full width of the traveled way and deposit out of drainage’s at locations designated by the Contracting Officer.
(b) Removal for Project Use (Method TS) - Remove snow from all or part of the traveled way, including sufficient turnouts for safe and efficient use for timber transportation and to protect the road. Remove intruding windfalls, debris or slough and slide material and dispose of only as necessary to provide passage for timber transportation. Removed materials may be deposited off the traveled way or outside the traveled way at locations designated by the Contracting Officer.
(10) When directed by the Contracting Officer, replace in kind, within sixty (60) days after the start of Normal Operating Season, any surfacing material which has been bladed off the road, unless otherwise agreed. Contracting Officer will notify Contractor in writing as to the cubic yard equivalent of bladed off material by the start of the normal operating season.
803.03 Equipment
Contractor may use any type of equipment to remove snow, providing:
a. Type or use of equipment is not restricted in K-F.1.2# or Road Rules document.
b. Equipment is of the size and type commonly used to remove snow and will not cause damage to the road.
c. The use of plows or dozers to remove snow requires written approval by the Contracting
Page 5 of 15 Clackamas River Ranger District
Officer. Equip plows or dozers with shoes or runners to keep the dozer blade a minimum of 2 inches above the road surface unless otherwise approved by the Contractor Officer.
803.04 Ice Control
Ice control may be performed by Contractor when approved by the Contracting Officer in writing. Such approval will include ice control materials, application rates, and any specific requirements of use.
T-811 - BLADING (06/2020)
811.01 Description
This work consists of surface blading the traveled way to a condition that facilitates traffic and provides proper drainage. Blading includes shaping the crown or slope of travel way, berms, and drainage dips in accordance with this specification. Compaction is required when shown on C(T)5.31#
811.02 Maintenance Requirements
1. Timing - Perform surface blading during the contract period as often as needed to provide conditions stated for the maintenance level of the road.
2. General
a. Blade and shape the existing traveled way and shoulders, including turnouts, to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface, unless otherwise shown in C(T)5.31#, to at least ½ inch per 1 foot of width, but not more than ¾ inch per 1 foot of width. Thoroughly loosen surfacing material to no less than 2 inches depth or the depth of potholes or corrugations. Scarification to facilitate cutting to the full depth of potholes or corrugations may be elected but will be considered incidental to blading. Do not scarify to a depth that will cause contamination of the surfacing.
b. Apply water during blading when sufficient moisture is not present to prevent segregation.
Supply, haul, and apply water in accordance with Section T-891.
c. Shape existing native rock or aggregate surfaced drainage dips to divert surface runoff to existing outlet devices, ditches, or discharge locations.
d. Establish a blading pattern which provides a uniform driving surface, retains the surfacing on the roadbed, and provides a thorough mixing of the materials within the completed surface width. Upon final blading, no disturbed rock shall protrude more than 2 inches above the adjacent surface unless otherwise provided in the contract. Remove material not meeting this dimension and place outside the roadbed; do not to obstruct drainage ways or structures. This material may be scattered off the roadbed if there is free drainage.
e. Where DESIGNATED ON THE GROUND, included in C(T)5.31#, SHOWN ON THE DRAWINGS, or as ordered by the Contracting Officer, invasive species of concern prevention practices shall be followed as listed below.
Invasive Species of Concern Prevention Practices
As specified by the Forest Service.
Page 6 of 15 Clackamas River Ranger District
3. Routine Blading
a. Conform to the dimensions SHOWN ON THE DRAWINGS or designated in the SUPPLEMENTAL SPECIFICATIONS upon completion of blading.
b. Shape roadbed width in excess of the dimensions shown only as needed to provide drainage away from the traveled way. Do not remove established grasses and other vegetation from the excess width except as incidental to providing drainage or unless otherwise provided in the contract.
4. Compaction
Roads requiring compaction will be included in the C(T)5.31#. Unless Compaction Method B is designated in the C(T)5.31#, all traveled ways requiring compaction may be compacted by Method
A. Compaction shall commence immediately following blading.
Compaction Method A: Breaking track over full width of traveled way while operating equipment.
Compaction Method B: 7-10 ton pneumatic, steel, or equivalent vibratory roller, operated to cover the full width two (2) times.
5. Undercutting
Undercutting roadway back slope is not permitted.
6. Intersections
At intersections, blade the roadbeds of side roads which are not closed or restricted from vehicular use to ensure smooth transitions.
a. Signing, cross ditching in the road surface (traveled way), earth berms, or other devices placed to discourage or eliminate use by passenger cars, are field evidence of road closure or restriction.
Roads listed for work under Sections T-835, T-836, T-838, or T-839 are considered restricted.
b. Side roads listed for work under this Section are not restricted.
7. Cleaning of Structures
Do not allow materials resulting from work under this Section to remain on or in structures, such as bridges, culverts, cattle guards, or drainage dips.
8. Berms
Maintain existing berms to the condition of adjacent segments. Do not create new berms.
9. Smooth Blading
Smooth blading may be used as an interim measure to remove loose surfacing material from the wheel paths. Store removed materials in a recoverable windrow until blade processing as described in this section is feasible. Watering will not be required for smooth blading. Accomplish smooth blading without distorting the existing cross-slope or crown of the traveled way.
Move and store loose surfacing materials on the high side of super-elevated curves and sections
Page 7 of 15 Clackamas River Ranger District with uniform inslope or outslope. In crowned sections, store the material on either or both sides as elected. Windrow and place stored materials to provide not less than 12 feet of smooth traveled way on one-lane segments, or 20 feet of smooth traveled way on two-lane segments, or segments with turnouts. Place holes through windrows for drainage every 500 feet or less to provide drainage.
T-831 - DITCH MAINTENANCE (06/2020)
831.01 Description
This Section provides for routine maintenance of various types of ditches to provide drainage which is unobstructed, as shown on C(T) 5.31# or as Designated on the ground by the Contracting Officer.
831.02 Maintenance Requirements
1. Maintain ditches by removing rock, soil, wood, and other materials. Maintained ditches shall function to meet the intent of the original design.
2. Undercutting backslopes during ditch maintenance operations is not permitted.
3. Suitable material up to 4 inches in greatest dimension removed from the ditches may be blended into existing native road surface and shoulder or placed in designated berm.
4. Do not blend material from ditch cleaning operations into aggregate surfaced roads. Do not blade material across aggregate or bituminous surfaced roads, unless approved in writing by the Contracting Officer.
5. Remove excess materials temporarily stored on the ditch slope or edge of the shoulder daily. Haul excess material to designated waste area under Section T-832.
6. Remove limbs and wood chunks in excess of 12 inches in length or 3 inches in diameter from ditches and place outside the roadway.
7. Clean paved surfaces of all materials resulting from ditch maintenance work.
8. Shape lead-off ditches to drain away from the traveled way.
9. Invasive species of concern prevention practices shall be followed as listed below, and where:
a. Designated on the Ground by the Contracting Officer,
b. Included in C(T)5.31#,
c. Shown on the Drawings, or
d. As ordered by the Contracting officer.
T-832 - REMOVE AND ENDHAUL MATERIALS (06/2020)
Page 8 of 15 Clackamas River Ranger District
832.01 Description
Work consists of loading, hauling, and placing of slide, slough, or excess materials such as rock, soil, vegetation, and other materials to designated disposal sites.
832.02 Maintenance Requirements
1. Remove, end haul, and dispose of excess materials generated by work under other Sections of this contract.
2. Remove the slide and slough materials to a height of approximately 6 feet vertically above the road surface, upslope from the roadbed, and not more than 3 feet vertically below the road surface down slope from the roadbed. Dispose of material at designated sites as shown on the SALE/CONTRACT AREA MAP, identified in SUPPLEMENTAL SPECIFICATIONS, or as ordered by the Contracting Officer.
3. Reshape the slope which generated the slide material as nearly as practical to its original condition by equipment operating from road surface. Reshaping of roadside ditches in slide area shall be in accordance with Section T-831.
4. When approved by the Contracting Officer, fill slumps by compacting selected materials into roadway depressions. Compaction is by Placement Method 2.
5. Place all materials in disposal sites as specified in the SUPPLEMENTAL SPECIFICATIONS, as shown on the SALE/CONTRACT AREA MAP, or as ordered by the Contracting Officer.
a. Placement Method 1 - Side Casting and End Dumping: Material may be placed by side casting and end dumping. Where materials include large rocks, provide a solid fill by working smaller pieces and fines into voids. Shape the finished surfaces to drain.
b. Placement Method 2 - Layer Placement: Step or roughen surfaces on which materials are to be placed prior to placing any material. Place materials in approximately horizontal layers no more than 12 inches thick. Compact each layer by operating hauling and spreading equipment over the full width of each layer.
6. Repair any damage to existing aggregate or pavement surfaces.
T-834 - DRAINAGE STRUCTURE MAINTENANCE (06/2020)
834.01 Description
This work consists of cleaning and reconditioning culverts and other drainage structures.
834.02 Maintenance Requirements
1. Clean drainage structures, inlet structures, culverts, catch basins, and outlet channels specified in the SUPPLEMENTAL SPECIFICATIONS. Clean catch basins by removing the material within the area
SHOWN ON THE DRAWINGS.
2. Clean the transition from the ditch line to the catch basin 10 feet or more from the catch basin. Clean outlet channels and lead-off ditches 6 feet or more. Remove and place debris and vegetation to not enter the channel or ditch, or obstruct traffic or haul debris and vegetation to a designated disposal area in accordance with Section T-832 when shown on the SALE/CONTRACT ARE MAP, when specified in the SUPPLEMENTAL SPECIFICATIONS, or as ordered by the Contracting Officer, Page 9 of 15 Clackamas River Ranger District
3. Hydraulic flushing of drainage structures is not allowed unless provided for in the SUPPLEMENTAL
SPECIFICATIONS.
4. Cleaning and reconditioning are limited to the first 3 feet of inlet and outlet, determined along the top of the structure. Recondition culvert inlet and outlet by field methods such as jacking out or cutting away damaged metal which obstructs flow. Treat cut edges with a zinc rich coating, in accordance with AASHTO M 36M and ASTM A 849.
5. Where DESIGNATED ON THE GROUND, included in C(T)5.31#, shown on the SALE/CONTRACT AREA MAP, or as ordered by the Contracting Officer, invasive species of concern prevention practices shall be followed as listed below.
T-838 - MAINTENANCE FOR HIGH CLEARANCE VEHICLE USE (06/2020)
838.01 Description
This work consists of making limited use roads passable for project use by Purchaser/Contractor and providing drainage from the traveled way and roadbed.
838.02 Maintenance Requirements
1. Traveled Way
Purchaser/Contractor may smooth or fill existing cross ditches and water bars and, as approved by the Forest Service, modify existing road junctions to enable vehicle access. Prior to beginning haul and resumption of haul after an extended stoppage:
a. Remove rocks, standing or down trees, and other debris from the 12-foot traveled way. No object extending over 4 inches above the road surface shall remain within the 12 feet usable traveled way.
Center the usable width on the roadbed or position away from the fill slope.
b. Place all removed materials away from drainages.
c. During use, maintain drainage structures including dips, ditches and culverts in a usable condition.
d. Clean and recondition drainage facilities in accordance with Section T-831 and T-834.
The Purchaser/Contractor may perform the following work prior to beginning haul and resumption of haul after an extended stoppage:
a. Remove rocks, standing or down trees, logs, brush, limbs and other debris from turnouts, turnarounds, or other locations that interfere with maintenance.
b. Remove encroaching limbs to a height of 14 feet above the traveled way surface.
Page 10 of 15 Clackamas River Ranger District
c. Scatter material not meeting utilization standards outside and below the roadbed on the fill side.
Limb and remove timber that meets utilization standards or deck at locations approved by the Forest Service.
2. Slough and Slides
a. Slough and slides may be left in place when surface drainage is provided and at least 12 feet of width is available for vehicle passage.
b. Purchaser/Contractor may reposition or ramp over slides and slough when the traveled way width is less than 12 feet providing the material is capable of supporting vehicles. Limit outslope to no more than six percent.
c. Reposition slough or slide materials, which are not capable of supporting a vehicle, on the roadbed to provide the 12 feet width. When directed by the Forest Service, slough or slide material will be removed under Section T-832.
3. Slumps and Washouts
a. Drain the roadbed immediately upgrade of slumps and longitudinal cracks to prevent water from entering slump area.
b. Slumps and longitudinal cracks at the edge of the roadbed shall not be considered a part of the usable width. Usable width may be reduced to 10 feet in the area of the slump.
c. Unless the Forest Service approves material being placed on slumps, ramp the slumps on both ends into undisturbed roadbed to provide at least 10 feet usable width. Use removed materials to guide vehicles to the ramp location or to aid in draining the area.
d. Washouts may be filled with suitable material.
4. Post -haul
At the end of hauling or prior to seasonal shutdowns or a period of extended inactivity:
a. Shape the traveled way and disturbed roadbed to provide functional drainage.
b. Reinstall removed cross ditches and water bars and provide any additional drainage structures necessary to offset changes caused through use and maintenance.
c. Leave roads useable for high clearance vehicles. Remove or reshape Purchaser/Contractor modifications at road junctions to leave the entrance as it was before use, or as agreed at the time of improvement.
T-839 - MAINTENANCE FOR PROJECT USE (06/2020)
839.01 Description
Work consists of providing minimum access required for Purchaser/Contractor's operations and associated Forest Service contract administration while preventing unacceptable resource or road damage.
839.02 Maintenance Requirements
1. Purchaser/Contractor is authorized to perform the following maintenance to provide vehicle passage and
Page 11 of 15 Clackamas River Ranger District drainage:
a. Removing log, earth, and rock barriers and/or improving existing road junctions to enable vehicle access as mutually agreed.
b. Smoothing or filling existing cross ditches and water bars.
c. Installing Purchaser/Contractor-furnished culverts or other temporary drainage structures for shallow stream crossings, as approved by the Contracting Officer.
d. Removing brush, fallen trees, rocks, and other materials from the traveled way and other locations that interfere with needed maintenance:
i. Place all removed materials away from drainages.
ii. Limb and remove timber which meets utilization standards or deck at locations approved by the Contracting Officer. Scatter other woody materials, including limbs, off and below the roadbed without creating concentrations.
e. Clean and recondition drainage structures in accordance with Section T-831 and Section T-834.
f. Reposition or ramp over slough and slides to provide adequate width of traveled way material.
g. Provide traveled way drainage above slumps and seal cracks in slump area. Ramp the slumps on both ends into undisturbed roadbed to provide usable width unless otherwise ordered by the Contracting Officer.
2. During use, the traveled way shall not channel water along the road. Prior to periods of anticipated rains and runoff, perform the following work:
a. Shape the traveled way and roadbed to drain.
b. Reinstall removed cross ditches and water bars and provide any additional drainage structures necessary to offset changes through use and maintenance.
c. Perform work outlined in 839.02 1 (e), (f), and (g).
d. During periods of non-use, replace original barrier or provide and maintain standard MUTCD Type 3 barricades unless alternate barriers are approved by the Contracting Officer.
839.03 Post Haul Requirements
1. Upon completion of project use, perform work described in the requirements of 839.02 2 and in accordance with 839.03 2 and 3 or as otherwise provided for in the SUPPLEMENTAL SPECIFICATIONS or C(T)5.31#.
2. Roads designated in C(T)5.31# to be blocked shall conform to the requirements of Section T-835.
Unless otherwise approved by the Contracting Officer, remove Purchaser/Contractor-installed temporary structures from National Forest System land. Associated commercially obtained materials shall remain the property of the Purchaser/Contractor.
3. Remove or reshape Purchaser/Contractor improvements at road junctions, as approved by the Contracting Officer at the time of improvement.
Page 12 of 15 Clackamas River Ranger District
T-842 - CUTTING ROADWAY VEGETATION (06/2020)
842.01 Description
This work consists of cutting all vegetative growth on roadway surfaces and roadsides, including trees and other vegetation less than 4 inches in diameter measured 6 inches above the ground.
842.02 Maintenance Requirements
1. General
a. Cut brush, trees, and other vegetation within each area treated to a maximum height of 6 inches above the ground surface or obstruction such as rocks or existing stumps. When work is performed under this Section, remove all limbs which extend into the treated area, or over the roadbed, to a height of 14 feet above the traveled way surface elevation.
b. Items to remain will be DESIGNATED ON THE GROUND.
c. Work may be performed either by hand or mechanically unless specifically shown in C(T)5.31#.
Self-propelled equipment is not allowed on cut and fill slopes or in ditches.
d. Correct damage to boles of standing trees caused by Purchaser/Contractor's operation either by treatment with a commercial nursery sealer or by removing the tree as directed by the Contracting Officer.
e. Limb trees within the cutting limits which are over 4 inches in lieu of cutting, measured at 6 inches above the ground.
f. When trees are limbed, cut limbs within 4 inches of the bole.
2. Cutting Side Vegetation
a. Show the width of vegetation to be removed in (C(T)5.31#.
b. Unless otherwise included in the SUPPLEMENTAL SPECIFICATIONS or DESIGNATED ON
THE GROUND:
i. Commence work at the edge of the traveled way and proceed away from the road centerline.
ii. Roads without a defined traveled way: The starting point for cutting will be marked on the ground or defined in the SUPPLEMENTAL SPECIFICATIONS.
c. The points for establishing cutting limits are as follows:
i. Fill and daylighted (wide roadbed) section cutting commences at the edge of the traveled way and proceeds away from the road center line.
ii. Drainage ditched section cutting commences at the bottom of the existing ditch and proceeds away from the road center line. Cutting on ditch foreslopes is not required.
iii. Unditched section cutting commences at the intersection of the cutbank and the roadbed and proceeds away from center line.
Page 13 of 15 Clackamas River Ranger District
d. Provide transitions between differing increments of cutting width. Accomplish transitions in a taper length of not less than 50 feet nor more than 70 feet.
3. Debris
a. Materials resulting from the cutting operation in excess of 12 inches in length or 3 inches in diameter is not allowed to remain on roadway slopes within the treated area, in ditches, or within water courses.
b.Remove limbs and chunks in excess of 3 inches in any dimension from the traveled way and shoulders.
c.Materials may be scattered down slope from the roadbed, outside of the work area and drainages unless otherwise listed in D. Invasive Species of Concern.
4. Invasive Species of Concern
Where DESIGNATED ON THE GROUND, included in C(T)5.31#, shown on SALE/CONTRACT AREA MAP or as ordered by the Contracting Officer invasive species of concern prevention practices shall be followed as listed below.
T-854 TREATMENT AND DISPOSAL OF DANGER TREES (06/2020)
854.01 Description
This work consists of felling and disposal of live or dead danger trees sufficiently tall to reach roads used by the Purchaser/Contractor. Any removal of logs is subject to prior agreement between the Contractor Officer and the Purchaser/Contractor.
854.02 Requirements
1. Designation of danger trees.
a. Danger trees to be felled will be documented in advance by the Contracting Officer. Trees authorized to be removed will be Marked for removal.
2. Falling, bucking and treatment for disposal.
a. Use controlled felling to ensure the direction of fall and prevent damage to property, structures, roadway, residual trees, and traffic. Stump heights measured on the side adjacent to the highest ground shall meet requirements of A(T)6. Higher stump heights are permitted when necessary for safety.
b. Felled snags and trees, which are not Marked for removal, will be left in a stable condition such that they will not roll or slide. Position logs away from standing trees so they will not roll, are not on top of one another, and are located out of roadway and drainage structures.
c. Fell, limb and remove trees which are Marked for removal and are equal or exceed the utilization
Page 14 of 15 Clackamas River Ranger District standards as listed in A(T)2 or SUPPLEMENTATAL SPECIFICATIONS. Dispose of merchantable timber designated for removal in accordance with B(T)2.32 Construction Clearing or as described in SUPPLEMENTAL SPECIFICATIONS.
3. Slash treatment.
a. Dispose of slash as described in Appendix B.
T-891 - WATER SUPPLY AND WATERING (06/2020)
891.01 Description
This work consists of providing facilities to furnish an adequate water supply, hauling, and applying water.
891.02 Materials
1. If the Purchaser/Contractor elects to provide water from other than designated sources, the Purchaser/Contractor is responsible to obtain the right to use the water, including any cost for royalties involved.
a. Suitable and adequate water sources available for Purchaser/Contractor's use under this contract are designated as follows:
Map Key No. Location - Road Location - Milepost Use Restrictions
4600 000 0.01
891.03 Equipment
1. Positive control of water application is required. Equipment shall provide uniform application of water without ponding or washing.
2. An air gap or positive anti-siphon device shall be provided between the water source and the vehicle being loaded if the vehicle has been used for other than water haul, if the source is a domestic potable water supply, or the water is used for tank-mixing with any other materials.
3. The designated water sources may require some work prior to their use. Such work may include cleaning ponded areas, installing temporary weirs or sandbags, pipe repair, pump installation, or other items appropriate to the Purchaser/Contractors's operations. Flowing streams may be temporarily sandbagged or a weir placed to pond water, provided a minimum flow of cu. ft/sec is maintained. Obtain approval from the Contracting Officer on improvements for sandbags or weirs prior to placement.
4. Juvenile fish protection. The Purchaser/Contractor shall utilize (1) one of the following methods of screening on any draft hoses used unless otherwise approved by Contracting Officer.
a. Perforated Plate: Screen openings shall not exceed 3/32 or 0.0938-inches (2.38mm).
b. Profile Bar Screen: The narrowest dimension in the screen openings shall not exceed 0.0689-inches (1.75-mm).
c. Woven Wire Screen: Screen openings shall not exceed 3/32 or 0.0938-inches (2.38 mm).
Page 15 of 15 Clackamas River Ranger District
d. All screening methods shall be cleaned frequently either with wire brushing, flushing, or any other acceptable method.
Explanation