REVISED Attachment 2.pdf

PDF 9 MB Posted

Attached to
FS 251 CROOKED FORK ROAD CULVERT REPLACEMENT Federal contract opportunity
Solicitation number
12343420R0005
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

This document package includes construction drawings and specifications for a federal forest service road culvert replacement project. The project involves replacing two culverts along FS Route 251 in the Monongahela National Forest in West Virginia. Work will include clearing and grubbing, excavation, installation of two precast concrete arch culverts, backfilling, installation of riprap and guardrails, seeding and mulching. The larger culvert at milepost 0.5 is a 19-foot span arch, while the culvert at milepost 0.1 requires a temporary bypass road and bridge during construction. Bidders should follow all specifications for erosion control, traffic control, protection of natural and cultural resources, and other requirements provided. The soliciting agency is the USDA Forest Service Eastern Region.

View the file

Other files for this federal contract opportunity

Other files attached to FS 251 CROOKED FORK ROAD CULVERT REPLACEMENT, newest first.
File Type Posted
Amendment 1.pdf PDF
Attachment 8.pdf PDF
12343420R0005_Amendment 1.pdf PDF
Attendance Sheet_251.pdf PDF
Attachment 3_Wage Determination.pdf PDF
Attachment 7 Sustainable.doc DOC document
Attachment 6 Personnel.doc DOC document
Attachment 5 Methodology.doc DOC document
12343420R0005.pdf PDF
Attachment 1.docx DOCX document
Attachment 2.pdf PDF
Attachment 4 Experience.doc DOC document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VICINITY MAP

PROJECT LOCATION

TRAVEL DIRECTIONS:

United States Department of Agriculture

Forest Service

INDEX OF SHEETS

SHEET SHEET TITLE

COVER SHEET

AREA MAP

GENERAL NOTES

MP 0.1 SITE PLAN

MP 0.1 BYPASS PLAN

MP 0.1 BYPASS PROFILE

MP 0.1 BYPASS CROSS SECTIONS

MP 0.1 ROAD PLAN & PROFILE

MP 0.1 STREAM PLAN

MP 0.1 STREAM PROFILES

MP 0.1 GUARDRAIL & SIGN PLAN

MP 0.5 SITE PLAN

MP 0.5 BYPASS PLAN & PROFILE

MP 0.5 BYPASS CROSS SECTIONS

MP 0.5 ROAD PLAN & PROFILE

MP 0.5 STREAM PLAN

MP 0.5 STREAM PROFILES

MP 0.5 GUARDRAIL & SIGN PLAN

ROAD & FOUNDATION DETAILS

STRUCTURE EXCAVATION DETAILS

STREAM SIMULATION LAYOUT

STREAM SIMULATION DETAILS

MISC. DETAILS

GUARDRAIL FLARED END TERMINAL

GUARDRAIL TANGENT END TERMINAL

GUARDRAIL ELEMENTS

GUARDRAIL POSTS

FROM MARLINTON, WV DRIVE 8.3 MILES NORTH ON U.S. HIGHWAY

219. FSR 251 CROOKED FORK ROAD WILL BE ON THE LEFT.

MP 0.1: N 38° 19' 12"

W 80° 5' 51"

MP 0.5: N 38° 19' 29"

W 80° 06' 9"

RECOMMENDED BY:

APPROVED:

PROJECT ENGINEER

R 09 BRIDGE ENGINEER DATE

DATE

R 09 DIRECTOR OF ENGINEERING

DATE

DISTRICT RANGER DATE

FS 251 CROOKED FORK RD CULVERT

REPLACEMENTS

WEST VIRGINIA

POCAHONTAS COUNTY

MONONGAHELA NATIONAL FOREST

R 09 EASTERN REGION

FOREST ENGINEER DATE

FOREST SUPERVISOR

DATE

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text miles

AutoCAD SHX Text

EASTERN REGION

AutoCAD SHX Text

NICOLET

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text M

AutoCAD SHX Text

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text K

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text Ironwood

AutoCAD SHX Text

WHITE MOUNTAIN

AutoCAD SHX Text

GREEN MOUNTAIN

AutoCAD SHX Text

WAYNE

AutoCAD SHX Text

MONONGAHELA

AutoCAD SHX Text

ALLEGHENY

AutoCAD SHX Text

MANISTEE

AutoCAD SHX Text

HURON

AutoCAD SHX Text

HIAWATHA

AutoCAD SHX Text

OTTAWA

AutoCAD SHX Text

CHEQUAMEGON

AutoCAD SHX Text

SUPERIOR

AutoCAD SHX Text

CHIPPEWA

AutoCAD SHX Text

HOOSIER

AutoCAD SHX Text

SHAWNEE

AutoCAD SHX Text

MARK TWAIN

AutoCAD SHX Text

FINGER LAKES

AutoCAD SHX Text

MILWAUKEE

AutoCAD SHX Text Washington D.C.

AutoCAD SHX Text Campton

AutoCAD SHX Text Rutland

AutoCAD SHX Text

LONG ISLAND

AutoCAD SHX Text Dover

AutoCAD SHX Text Annapolis

AutoCAD SHX Text Baltimore

AutoCAD SHX Text St. Louis

AutoCAD SHX Text Escanaba

AutoCAD SHX Text Warren

AutoCAD SHX Text Elkins

AutoCAD SHX Text Bedford

AutoCAD SHX Text Harrisburg

AutoCAD SHX Text Rolla

AutoCAD SHX Text Cadillac

AutoCAD SHX Text Rhinelander

AutoCAD SHX Text Park Falls

AutoCAD SHX Text Duluth

AutoCAD SHX Text Cass Lake

AutoCAD SHX Text Charleston

AutoCAD SHX Text Cleveland

AutoCAD SHX Text Pittsburgh

AutoCAD SHX Text Harrisburg

AutoCAD SHX Text Philadelphia

AutoCAD SHX Text Trenton

AutoCAD SHX Text Hartford

AutoCAD SHX Text Boston

AutoCAD SHX Text Portland

AutoCAD SHX Text Augusta

AutoCAD SHX Text Concord

AutoCAD SHX Text Montpelier

AutoCAD SHX Text Albany

AutoCAD SHX Text Buffalo

AutoCAD SHX Text Detroit

AutoCAD SHX Text Lansing

AutoCAD SHX Text Toledo

AutoCAD SHX Text Columbus

AutoCAD SHX Text Cincinnati

AutoCAD SHX Text Indianapolis

AutoCAD SHX Text Springfield

AutoCAD SHX Text Chicago

AutoCAD SHX Text Minneapolis

AutoCAD SHX Text St. Paul

AutoCAD SHX Text Madison

AutoCAD SHX Text Des Moines

AutoCAD SHX Text Kansas City

AutoCAD SHX Text Jefferson City

AutoCAD SHX Text

LAKE ONTARIO

AutoCAD SHX Text

LAKE ERIE

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text E

AutoCAD SHX Text H

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text K

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text U

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text K

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text M

AutoCAD SHX Text

NEW JERSEY

AutoCAD SHX Text

VIRGINIA

AutoCAD SHX Text

HAMPSHIRE

AutoCAD SHX Text

NEW

AutoCAD SHX Text

MARYLAND

AutoCAD SHX Text

DELAWARE

AutoCAD SHX Text

RI

AutoCAD SHX Text

CONNECTICUT

AutoCAD SHX Text

MASSACHUSETTS

AutoCAD SHX Text

VERMONT

AutoCAD SHX Text

MAINE

AutoCAD SHX Text

NEW YORK

AutoCAD SHX Text

PENNSYLVANIA

AutoCAD SHX Text

WEST

AutoCAD SHX Text

OHIO

AutoCAD SHX Text

INDIANA

AutoCAD SHX Text

ILLINOIS

AutoCAD SHX Text

WISCONSIN

AutoCAD SHX Text

MINNESOTA

AutoCAD SHX Text

IOWA

AutoCAD SHX Text

MISSOURI

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

3/1 0/2

0 0 8:

L

DI

FI

OR

E

C:

\U

SE

RS

\L

DI

FI

OR

E\

EN

TE

RP

RI

SE

T

EA

M\

FY

\R

9 M

ON

ON

GA

HA

LA

AO

PS

\P

RE

CO

NS

TR

UC

TI

ON

\C F-

TI

TL

E_

SH

EE

TS

.D W

G;

R 09

EASTERN REGION

CROOKED FORK

CULVERT

REPLACEMENTS

MONONGAHELA

NATIONAL FOREST

MARLINTON R.D.

AREA MAP

JULY 2019

DIFIORE/GOMEZ

DIFIORE/GOMEZ

XX

FSR 251 MP 0.1

FSR 251 MP 0.5

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

E

GENERAL NOTES: SUMMARY OF QUANTITIES: CROOKED FORK MP 0.1

SPECIFICATIONS: THE WORK SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ITEM NUMBER DESCRIPTION

ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP 14 - US CUSTOMARY UNITS) AS MODIFIED FOR THIS 15101 MOBILIZATION

CONTRACT IN THE SUPPLEMENTAL SPECIFICATIONS. 15201 CONSTRUCTION SURVEYING & STAKING, METHOD 1

15401 CONTRACTOR TESTING

GEOTECHNICAL REPORT: A GEOTECHNICAL REPORT IS INCLUDED WITH THE SOLICITATION. 15713 SOIL EROSION & POLLUTION CONTROL, INCLUDING DEWATERING

20101 CLEARING & GRUBBING

UTILITIES: THE CONTRACTOR IS RESPONSIBLE FOR REQUESTING A UTILITY LOCATE. A CERTIFICATE OF COMPLETION 20301 REMOVAL OF STRUCTURES & OBSTRUCTIONS

SHALL BE PROVIDED TO THE CO. NOTE: LOCATE EX. SEPTIC FIELD AT RESIDENCE AT MP 0.1. 20402 ROADWAY EXCAVATION & EMBANKMENT, COMPACTION

PLACEMENT METHOD 2

IN-STREAM WORK WINDOW : JUNE 1 TO SEPTEMBER 15 20420 EM BAN KMENT CONSTRUCTION, COM PA CTI ON PLACEMENT

METHOD 2

20450 CHANNEL EXCAVATION

HOURS OF OPERATION : 0600 - 1800 M-F, NO FED HOLIDAYS OR WEEKENDS UNLESS APPROVED BY THE CO. 20801 STRUCTURE EXCAVATION

20803 STRUCTURAL BACKFILL, CRUSHED AGGREGATE, WVDOH CLASS 3,

NOXIOUS WEED CONTROL : ALL CONSTRUCTION EQUIPMENT SHALL BE CLEANED & POWER WASHED & FREE OF DIRT & COMPACTION METHOD 1

DEBRIS PRIOR TO ENTRY ON NATIONAL FOREST. CONTRACTOR SHALL SCHEDULE EQUIPMENT INSPECTION W/CO PRIOR 25102 PLACED RIP RAP, CLASS 2 (INCLUDES GEOTEXTILE FABRIC)

TO MOBILIZATION TO FOREST SERVICE LANDS. 30116 AGGREGATE SURFACE COURSE, WV DOH CLASS 1, COMPACTION

METHODB

60201 71" SPAN X47" RISE PIPE CM P ARCH, 8 GA. ARCHEOLOGICAL SITES : SHOULD ARCHEOLOGICAL OR PALEONTOLOGICAL REMAINS OR SPECIMENS BE DISCOVERED, 60305 38'-0" SPAN X 10'-8-1/8" RISE X 35'-10-1/2" LONG PRECAST

SUSPEND OPERATIONS AT THE DISCOVERY SITE AND NOTIFY THE CO. CONCRETE ARCH W/HEADWALLS & EXPRESS FOUNDATION, CONSPAN l/0638

TRAFFIC CONTROL : AT MP 0.1 THE EXISTING 50 FT PORTABLE BRIDGE ONSITE SHALL BE USED TO PROVIDE A 61701 GUARDRAIL SYSTEM, STEEL TYPE TL-2

TEMPORARY BYPASS. UPON COMPLETION OF THE PROJECT THE TEMPORARY BRIDGE (MP 0.1) & CMP ARCH & SURPLUS 61703A TERMINAL SECTION, TANGENT END

18" CMP (MP 0.5) SHALL BE REMOVED, DELIVERED & UNLOADED AT THE MARLINTON RANGER DISTRICT WORKCENTER. THE 61901 FENCE, WOVEN WIRE (HIGH TENSILE) 1348-12

TEMP. ROAD SHALL BE REMOVED & SLOPES RE-ESTABLISHED. 62552 NATIVE SEEDING & MULCHING, DRY METHOD

63307 OBJECT MARKERS

DELAY OF TRAFFIC: ROAD SHALL BE OPEN TO TRAFFIC 24/7 WITH A MAXIMUM DELAY OF 15 MINUTES. SPECIAL 63309 REMOVE & RESET SIGNS

CONSIDERATION SHALL BE GIVEN TO EMERGENCY VEHICLE. 63501 TEMPORARYTRAFFIC CONTROL, INCLUDING INSTALLATION &

REMOVAL

SALVAGE : ALL EXCESS MATERIALS SHALL BECOME THE PROPERTY OF THE CONTRACTOR, UNLESS OTHERWISE DIRECTED 64801

PLACED STREAM SIMULATION ROCK, BED CLASS CF-0.1, METHOD A

BY THE CO, & SHALL BE REMOVED FROM NATIONAL FOREST LAND IN ACCORDANCE WITH ALL FEDERAL, STATE & LOCAL 64803A PLACED CHANNEL ROCK, CLASS 4 , METHOD A OR C

LAWS.

SUMMARY OF QUANTITIES: CROOKED FORK MP 0.5

TOPSOIL : TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 4" & STOCKPILED AS DIRECTED BY THE CO. EXPOSED SOIL SHALL RECEIVE 2"-3" OF TOPSOIL TO THE EXTENT ALLOWED BY EVEN DISTRIBUTION OF THE STOCKPILE. ITEM NUMBER DESCRIPTION

15101 MOBILIZATION DEWATERING: COMPLY WITH WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION REQUIREMENTS.

15201

DEWATERING PLAN MUST BE SUBMITTED 15 DAYS IN ADVANCE OF CONSTRUCTION. PUMP TURBID WATER INTO CONSTRUCTION SURVEYING & STAKING, METHOD 1

15401

SEDIMENT BAGS. PROVIDE A MINIMUM OF 3 BAGS, 15' x 15'. DISPOSE OF BAGS AT END OF CONSTRUCTION. CONTRACTOR TESTING

15713 SOIL EROSION & POLLUTION CONTROL

20101 CLEARING & GRUBBING SEDIMENT & EROSION CONTROL: COMPLY WITH WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION 20301

REQUIREMENTS. EROSION CONTROL PLAN MUST BE SUBMITTED 30 DAYS IN ADVANCE OF CONSTRUCTION. REMOVAL OF STRUCTURES & OBSTRUCTIONS

20402 ROADWAY EXCAVATION & EMBANKMENT, COMPACTION PLACEMENT

METHOD 2

STAGING AREAS : STAGING AREAS SHALL BE APPROVED BY THE CO. 20450 CHANNEL EXCAVATION

20901 STRUCTURE EXCAVATION

CONTOURS: CONTOURS SHOWN ARE APPROXIMATE. IF THERE IS A DISCREPANCY BETWEEN THE ELEVATION SHOWN FOR 20903 STRUCTURAL BACKFILL, CRUSHED AGGREGATE, WVCDOH CLASS 3, A POINT & THE ADJACENT CONTOURS, THE POINT ELEVATION WILL BE CONSIDERED CORRECT. COMPACTION METHOD 1

25102 PLACED RIP RAP, CLASS 2 (INCLUDES GEOTEXTILE FABRIC)

30116 AGGREGATE SURFACE COURSE, WVDOH CLASS 1, COMPACTION CLEARING & GRUBBING: LIMITS OF CLEARING ARE 10' BEYOND EDGE OF WORK SHOWN. ALL TREES REMOVED FROM TEMP. METHOD B

EASEMENTS SHALL BE DISPOSED OF AS PER CO. LIMBS & OTHER SMALL MATERIALS NOT UTILIZABLE SHALL BE CHIPPED 60201 18" PIPE, HDPE DUAL WALL

OR REMOVED FROM THE PROJECT AREA. 60305 19'-0" SPAN X 8'-5 1/8" RISE X 24' LONG PRECAST CONCRETE ARCH

W/HEADWALLS, WINGWALLS & EXPRESS FOUNDATION, CONSPAN

#0119

EXCAVATION: THE CONTRACTOR MAY USE EXCESS EXCAVATION IF THE MATERIAL MEETS THE REQUIREMENTS OF THE 61701 GUARDRAIL SYSTEM, STEEL TYPE TL-2

APPLICABLE STANDARD AND SUPPLEMENTAL SPECIFICATIONS. ANY EXCESS AND UNSUITABLE EXCAVATION SHALL BE 61703B TERMINAL SECTION, FLARED END

REMOVED FROM NATIONAL FOREST LAND IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL LAWS. REMOVAL IS 61901 FENCE, WOVEN WIRE (HIGH TENSILE) 1348-12

INCIDENTAL TO 20801. 62552 NATIVE SEEDING & MULCHING, DRY METHOD

63307 OBJECT MARKERS

WOVEN WIRE FENCE: FENCE SHALL BE STAY TUFF BRAND, FIXED KNOT, 1348-12 FENCE OR AN APPROVED EQUAL. ALL 63501 TEMPORARY TRAFFIC CONTROL, INCLUDING INSTALLATION &

FENCE SHALL BE INSTALLED AS PER MANUFACTURER RECOMMENDATIONS WITH THE FOLLOWING EXCEPTIONS. CORNER REMOVAL OF CMP ARCH

POSTS AND BRACE POSTS SHALL BE 10" MINIMUM DIAMETER. ALL WOOD FENCE POSTS SHALL BE TREATED FOR GROUND 64801 PLACED STREAM SIMULATION ROCK, BED CLASS CF-0.5, METHOD A

CONTACT. POST SPACING SHALL B�UM. CONTRACTOR SHALL REATTACH EXISTING FENCE WIRE TO REINSTALLED 64803A PLACED CHANNEL ROCK, CLASS 4, METHOD A OR C

FENCE POSTS. EDITED 64803B PLACED CHANNEL ROCK, CLASS 7, METHOD A OR C

MM UNIT QUANTITY

LSQ LUMP SUM 1.00

LSQ LUMP SUM 1.00

LSQ LUMP SUM 1.00

LSQ LUMP SUM 1.00

LSQ LUMP SUM 1.00

LSQ LUMP SUM 1.00

CQ STA 4.40

AQ CY 200.00

- EDITED

LSQ LUMP SUM 1.00

CQ CY 910.00

AQ TON 850.00

AQ TON 50.00

AQ TON 225.00

-- EDITED

AQ FT 50.00 I- EDITED

LSQ LUMP SUM 1.00

AQ FT 37.50

AQ EACH 4.00

AQ FT - -- EDITED

CQ ACRE 0.35

AQ EACH 4.00

LSQ LS 1.00

LSQ LUMP SUM 1.00

LSQ LUMP SUM 1.00

LSQ LUMP SUM 1.00

METHOD

OF UNIT QUANTITY

MEASURE

LSQ LUMP SUM 1.00

LSQ LUMP SUM 1.00

LSQ LUMP SUM 1.00

LSQ LUMP SUM 1.00

LSQ LUMP SUM 1.00

LSQ LUMP SUM 1.00

CQ STA 3.70

LSQ LUMP SUM 1.00

CQ CY 340.00

AQ TON 240.00

AQ TON 20.00

AQ TON 170.00

AQ FT 36.00

LSQ LUMP SUM 1.00

AQ FT 60.50

AQ EACH 4.00

AQ FT 100.00

CQ ACRE 0.20

AQ EACH 4.00

LSQ LUMP SUM 1.00

LSQ LUMP SUM 1.00

LSQ LUMP SUM 1.00

LSQ LUMP SUM 1.00

USDA ◄�oREST SERv1c�\

� �u�s� iiillllll ��TOFA��

United States Department of Agriculture

Forest Service

R09

EASTERN REGION

PROJECT NAME

CROOKED FORK

CULVERT

REPLACEMENTS

MONONGAHELA

NATIONAL FOREST

MARLINTON R.D.

DRAWING TITLE

GENERAL NOTES

DATE

JULY2019

ARCHIVE NO.

DESIGNER DWG SHEET NO.

DIFIORE/GOMEZ

DRAWN

DIFIORE/GOMEZ

CHECKED

xx

SHEET 03 OF 27

PROJECT NO.

AJT 05-21-2020

L

E V

A T

I O

N

F

E E

T

E L

E V

A T

I O

N

F

E E

T

STATION (FEET)

CF MP0.1-BYPASS PROFILE

0+85 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 5+82

1.24%

.5

.0

.0

0.00%

S T

A

B

E G

I N

C

F

M P

B

Y P

A S

S

S T

A

E

N D

F

M P

B

Y P

A S

S

E L

PVI STA: 3+90.00

PVI ELEV: 981.99

K: 3.17

LVC: 30.16

V

S

T A

E

V

A

E

V

PVI STA: 4+70.00

PVI ELEV: 989.60

K: 100.63

LVC: 50.00

A

E

V

A

E

V

PVI STA: 2+41.54

PVI ELEV: 981.99

K: 80.71

LVC: 100.00

A

E

V

A

E

V

PVI STA: 5+33.14

PVI ELEV: 995.91

K: 25.00

LVC: 50.00

A

E

V

A

E

V

50' PORTABLE BRIDGE ON

12" X 12" X 16' TIMBERS

GENERAL NOTES:

1. SEE SHEET 17 FOR BYPASS ROADWAY TYPICAL DETAILS.

2. APPROX QUANTITY OF BORROW MATERIAL NEEDED = 485 CY. INCIDENTAL TO PAY ITEM 63501

TEMPORARY TRAFFIC CONTROL.

3. THE EXISTING PORTABLE BRIDGE ONSITE SHALL BE RELOCATED TO BYPASS LOCATION.

4. FURNISH TIMBER SILLS 12" X 12" X 16' - 3 EACH SIDE, TYP.

5. UPON COMPLETION OF THE PROJECT, SUITABLE EMBANKMENT MATERIAL & AGGREGATE SURFACING

SHALL BE PLACED & COMPACTED IN THE EXISTING ROADWAY ADJACENT TO THE SITE AS DIRECTED BY

THE CO. UNSUITABLE MATERIAL SHALL BE REMOVED & THE SITE RETURNED TO EXISTING CONDITION.

6. THE PORTABLE BRIDGE & TIMBER SILLS SHALL BE DELIVERED TO THE MARLINTON WORKCENTER UPON

COMPLETION OF THE PROJECT.

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

R09

EASTERN REGION

CROOKED FORK

CULVERT

REPLACEMENTS

MONONGAHELA

NATIONAL FOREST

MARLINTON RANGER DISTRICT

MP 0.1 BYPASS PROFILE

05/30/2019

DIFIORE/GOMEZ

DIFIORE/GOMEZ

L.DIFIORE

C-02 06 27

Feet

0 40 80

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

E V

A T

I O

N

F

E E

T

OFFSET (FEET)

1+50.00

0 10 20 30 400-10-20-30-40

E L

E V

A T

I O

N

F

E E

T

OFFSET (FEET)

2+00.00

0 10 20 30 400-10-20-30-40

E L

E V

A T

I O

N

F

E E

T

OFFSET (FEET)

3+00.00

0 10 20 30 400-10-20-30-40

E L

E V

A T

I O

N

F

E E

T

OFFSET (FEET)

3+50.00

0 10 20 30 400-10-20-30-40

E L

E V

A T

I O

N

F

E E

T

OFFSET (FEET)

4+00.00

0 10 20 30 400-10-20-30-40

E L

E V

A T

I O

N

F

E E

T

OFFSET (FEET)

4+50.00

0 10 20 30 400-10-20-30-40

E L

E V

A T

I O

N

F

E E

T

OFFSET (FEET)

5+00.00

0 10 20 30 400-10-20-30-40

E L

E V

A T

I O

N

F

E E

T

OFFSET (FEET)

5+50.00

0 10 20 30 400-10-20-30-40

EXISTING

GROUND

FINISHED

GRADE

EXISTING

GROUND

FINISHED

GRADE

EXISTING

GROUND

FINISHED

GRADE

EXISTING

GROUND

FINISHED

GRADE

EXISTING

GROUND

FINISHED

GRADE

EXISTING

GROUND

FINISHED

GRADE

PORTABLE

BRIDGE

EXISTING

GROUND

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

R09

EASTERN REGION

CROOKED FORK

CULVERT

REPLACEMENTS

MONONGAHELA

NATIONAL FOREST

MARLINTON RANGER DISTRICT

MP 0.1 BYPASS CROSS

SECTIONS

05/30/2019

DIFIORE/GOMEZ

DIFIORE/GOMEZ

L.DIFIORE

C-03 07 27

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

2+35 2+50 3+00

2+35 2+50 3+00

EXISTING ,-----..=- 990 w w z -- - ----0 980 ----.

w FINISHED ...J 970 w GRADE -

I I

960 I

-50 -40 -30 -20

4+00.00

-10 0 10

OFFSET (FEET)

CJ::

z B w aJ � (X)

II a, <( II f--...J rnw

3+50

3+50

30 40 50

100' TEMP EXISTING ROW EASEMENT

N "' 0

+ + 0 "' st st + N + II II "'

� � II

II � rn rn � � � rn

<(-<( � rn W-W <( � O:: a,-0:: b w <(

�� w co 1.0-rll co CJ::- Wr---.-W ,._ w� aJ '-:

□ m_o a, w�

� II=� II □ (J) -�- -

--�- � II □ (J)

Cl uJ Cl ...J

.---//// /// //'� � .'.'., w Cl uJ ·7/ '//// "//// "////

/ / / / Cl w -.2-4%-, ~noo /// '//// //��/ '//// '/ '// ///// -3.283/c✓ / / / / ///).. -6.20%

4+00 4+50 5+00

STATION (FEET)

MP 0.1 STREAM SIMULATION PROFILE

100' TEMP EXISTING ROW EASEMENT

I

STA4+55�

ELEV984.06

i-- " "' il 14,Z

STA4+55-s:--,-.:

ELEV 980.47 ' /

,., ··- STA4+92 ., .,_ /1· •'···! -

/ .• .. ELEV979.28 ··•·. ' ... :.·· .·.•··· '- I

STA4+55 I

ELEV970.89 37.04' STA4+92

ELEV 969.70

I I

4+00 4+50 5+00

STATION (FEET}

MP 0.1 STRUCTURE PROFILE

4+25.00

1000 1000

EXISTING .=- 990 .=- 990

w w w \ w z z 0 980 ,..._ �- -- 0 980 - --

� ' V w FINISHED / w ...J 970 ...J 970 w GRADE _/ w

960 I 960 -50 -40 -30 -20 -10 0 10 20 30 40 50

OFFSET (FEET)

STREAM CROSS SECTIONS

67'TEMP

EASEMENT

CJ::

s:

z w

�t--: +"'

.m

<:( II_

f- ...J rn w

2.37''" --- ----

5+50

67' TEMP

EASEMENT

5+50

� I I

� EXISTING

� =FINISHED

�- GRADE

I

-50 -40 -30

-20

5+15.00

-10 0 10

OFFSET (FEET)

6+00

6+00

20 30 40

6+43

6+43

USDA .,;,f 1•

- - us iiiilll � �, 1�

�fNTOFAGRI�

United States Department of Agriculture

Forest Service

R09

EASTERN REGION

STAMPS, LOGOS, AND SEALS

NO. REVISION/ ISSUE DATE

PROJECT NAME

CROOKED FORK

CULVERT

REPLACEMENTS

MONONGAHELA

NATIONAL FOREST

MARLINTON RANGER DISTRICT

DRAWING TITLE

MP 0.1 STREAM

PROFILES

DATE

I

ARCHIVE NO.

05/30/2019

DESIGNER

DIFIORE/GOMEZ

DRAWN

DIFIORE/GOMEZ

CHECKED

L.DIFIORE

PROJECT NO.

DRAWING SHEET NO.

C-06

SHEET 10 OF 27

CONTROL POINTS

POINT #

NORTHING

10000.00

10021.69

10126.54

10126.55

10000.00

9926.66

EASTING

100000.00

99943.49

99868.93

99868.92

100000.00

99688.82

ELEVATION

1000.01

1003.34

1009.55

1009.54

999.98

1018.77

DESCRIPTION

REBAR

REBAR

REBAR

REBAR

REBAR

HUB

EXISTING 18" CMP - REMOVE &

DISPOSE. SEE BYPASS DETAILS FOR

NEW STRUCTURE

EXISTING STRUCTURE

96" X 60" CMP ARCH

REMOVE & DISPOSE

EXISTING DRIVEWAY

ABANDON IN PLACE

L

C

C

FS ROW

FS BOUNDARY

TEMP.

EASEMENT

19'-0" SPAN X 8'-5 1/8" RISE X 24'

PRECAST CONCRETE ARCH -

CONSPAN 0119 W/PRECAST CONC

HEADWALLS & WINGWALLS

CLASS 2

RIPRAP

X

X

X

X

X

APPROX. LOCATION OF NEW FENCE

AS STAKED BY F.S.

N 9853.62 E 100065.20 - N 9928.89 E 99999.36

SEE SHEET 21 FOR DETAILS

T Y

P

R

M

I

N

A

L

R

M

I

N

A

L

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

R09

EASTERN REGION

CROOKED FORK

CULVERT

REPLACEMENTS

MONONGAHELA

NATIONAL FOREST

MARLINTON RANGER DISTRICT

MP 0.5 SITE PLAN

06/22/2019

L.DIFIORE

L. DIFIORE

C.GOMEZ

S-02 12 27

Feet

0 20 40

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

R09

EASTERN REGION

CROOKED FORK

CULVERT

REPLACEMENTS

MONONGAHELA

NATIONAL FOREST

MARLINTON RANGER DISTRICT

MP 0.5 BYPASS ROAD

PLAN & PROFILE

06/22/2019

L.DIFIORE

L. DIFIORE C-08

13 27

Feet

0 20 40

Feet

0 40 80

6+47

6+00

STREAM WORK EXTENTS

EXISTING DRIVEWAY

ABANDON IN PLACE

L

L

L

L

L

C

C

C

C

BYPASS EXTENTS

INSTALL TEMPORARY

95" X 67" X 40' CMP ARCH

UPON COMPLETION OF THE

PROJECT REMOVE & DELIVER

TO MARLINTON WORKCENTER

INSTALL 18" X 56' HDPE DUAL WALL

PIPE. 20' SECTION THROUGH BYPASS

SHALL BE REMOVED & DISPOSED OF

UPON COMPLETION OF THE PROJECT

FS BOUNDARY

TEMP.

EASEMENT

X

X

X

X

X

APPROX. LOCATION OF NEW FENCE

T Y

P

R

M

I

N

A

L

R

M

I

N

A

L

E L

E V

A T

I O

N

F

E E

T

E L

E V

A T

I O

N

F

E E

T

STATION (FEET)

MP 0.5 BYPASS PROFILE

VERTICAL EXAGGERATION: 2:1

3+35 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+40

.9

0.00%

-2.71%

S T

S T

A

E L

PVI STA: 4+52.79

PVI ELEV: 1003.58

K: 20.98

LVC: 125.00

A

E

V

A

E

V

PVI STA: 6+22.79

PVI ELEV: 1003.58

K: 36.85

LVC: 100.00

A

E

V

A

E

V

STA 4+44

ELEV 1000.23

STA 5+40

ELEV 995.95

BYPASS STRUCTURE

POINT #

NORTHING

9952.16

9977.09

10053.17

10073.04

10041.32

EASTING

99950.20

99981.48

99920.30

99949.35

99903.20

ELEVATION

997.65

994.47

999.48

997.65

1001.96

DESCRIPTION

CMPA_INLET

CMPA_OUTLET

RELIEF CULVERT INLET

RELIEF CULVERT OUTLET

BYPASS RELIEF CULVERT INLET

FR251 @ CF-MP0.5_BYPASS

NUMBER

L4

C3

L5

C4

L6

C5

L7

C6

L8

STATION

3+74.4

PC 3+98.6

PI 4+12.4

PT 4+25.6

4+25.6

PC 4+44.2

PI 4+59.5

PT 4+73.9

4+73.9

PC 5+92.4

PI 6+06.5

PT 6+19.9

6+19.9

PC 6+76.1

PI 6+88.5

PT 7+00.3

7+00.3

NORTHING

10112.9

10092.8

10067.6

10048.9

10021.5

9926.9

9910.6

9890.0

9876.1

EASTING

99891.6

99905.2

99913.6

99914.6

99924.7

99996.2

100017.8

100070.1

100089.7

RADIUS

50.00

50.00

50.00

50.00

DELTA

30-53-52

34-01-51

31-25-13

27-46-54

TANGENT

LENGTH

24.18

26.96

18.64

29.70

118.53

27.42

56.23

24.24

39.90

BEARING

S33° 58' 31.04"E

S18° 31' 34.94"E

N3° 04' 38.84"W

S20° 05' 34.36"E

S37° 06' 29.87"E

S52° 49' 06.47"E

S68° 31' 43.07"E

S54° 38' 15.88"E

S40° 44' 48.69"E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

R09

EASTERN REGION

CROOKED FORK

CULVERT

REPLACEMENTS

MONONGAHELA

NATIONAL FOREST

MARLINTON RANGER DISTRICT

MP 0.5 BYPASS ROAD

CROSS SECTIONS

06/22/2019

L.DIFIORE

L. DIFIORE C-09

14 27

Feet

0 10 20

E L

E V

A T

I O

N

F

E E

T

OFFSET (FEET)

4+00.00

0 10 20 30 400-10-20-30-40

E L

E V

A T

I O

N

F

E E

T

OFFSET (FEET)

4+50.00

0 10 20 30 400-10-20-30-40

E L

E V

A T

I O

N

F

E E

T

OFFSET (FEET)

5+00.00

0 10 20 30 400-10-20-30-40

E L

E V

A T

I O

N

F

E E

T

OFFSET (FEET)

6+00.00

0 10 20 30 400-10-20-30-40

E L

E V

A T

I O

N

F

E E

T

OFFSET (FEET)

6+50.00

0 10 20 30 400-10-20-30-40

EXISTING

GROUND

E L

E V

A T

I O

N

F

E E

T

OFFSET (FEET)

7+00.00

0 10 20 30 400-10-20-30-40

FINISHED

GRADE

FINISHED

GRADE

EXISTING

GROUND

FINISHED

GRADE

FINISHED

GRADE

EXISTING

GROUND

FS 251

EXISTING

GROUND

FS 251

EXISTING

GROUND

FINISHED

GRADE

EXISTING

GROUND

FINISHED

GRADE

FS 251

FS 251

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

EXISTING DRIVEWAY

ABANDON IN PLACE

L

C

INSTALL 18" X 36' CMP

SEE SHEET 12 FOR

BYPASS EXTENSION

FS BOUNDARY

TEMP.

EASEMENT

CLASS 2

RIPRAP

X

X

X

X

X

APPROX. LOCATION OF NEW FENCE

AS STAKED BY F.S.

N 9853.62 E 100065.20 - N 9928.89 E 99999.36

T Y

P

R

M

I

N

A

L

R

M

I

N

A

L

E L E

V A

T I O

N

F

E E

T

E L E

V A

T I O

N

F

E E

T

STATION (FEET)

MP 0.5 PROFILE

VERTICAL EXAGGERATION: 2:1

3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50

ROAD ASSEMBLY

-4 .8

-0.42%

-0.58%

S T

E

S T

A

E L

PVI STA: 5+17.56

PVI ELEV: 1001.30

K: 27.17

LVC: 120.00

A

E

V

A

E

V

PVI STA: 7+02.69

PVI ELEV: 1000.51

K: 326.17

LVC: 50.00

A

E

V

A

E

V

1 4

NEW STRUCTURES POINTS

POINT #

NORTHING

10053.17

10073.04

9986.56

9970.83

9984.28

10000.01

EASTING

99920.30

99949.35

99979.60

99990.26

100010.13

99999.48

ELEVATION

999.48

997.65

989.92

989.92

988.77

988.77

DESCRIPTION

RELIEF CULVERT INLET

RELIEF CULVERT OUTLET

STRUCTURE INLET LEFT

STRUCTURE INLET RIGHT

STRUCTURE OUTLET RIGHT

STRUCTURE OUTLET LEFT

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

R09

EASTERN REGION

CROOKED FORK

CULVERT

REPLACEMENTS

MONONGAHELA

NATIONAL FOREST

MARLINTON RANGER DISTRICT

MP 0.5 ROAD PLAN &

PROFILE

06/22/2019

L.DIFIORE

DIFIORE/GOMEZ C-10

15 27

Feet

0 20 40

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

6+47

6+00

STREAM WORK EXTENTS

EXISTING DRIVEWAY

ABANDON IN PLACE

CLASS 2

RIPRAP

X

X

X

X

X

X

T Y

P

R

M

I

N

A

L

R

M

I

N

A

L

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

R09

EASTERN REGION

CROOKED FORK

CULVERT

REPLACEMENTS

MONONGAHELA

NATIONAL FOREST

MARLINTON RANGER DISTRICT

MP 0.5 STREAM PLAN

06/22/2019

L.DIFIORE

DIFIORE/GOMEZ C-11

16 27

Feet

0 10 20

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

E V

A T

I O

N

F

E E

T

E L

E V

A T

I O

N

F

E E

T

STATION (FEET)

MP 0.5 STREAM SIMULATION PROFILE

4+35 4+50 5+00 5+50 6+00 6+47

S T

G R

A D

E

B

R E

K

E

G R

A D

E

B

R E

E

G R

A D

E

B

R E

E

G R

A D

E

B

R E

E

G R

A D

E

B

R E

E

EXISTING

GROUND

FINISHED STREAM GRADE

EXISTING CHANNEL

EXISTING

CMP

E L

E V

A T

I O

N

F

E E

T

E L

E V

A T

I O

N

F

E E

T

STATION (FEET)

MP 0.5 STRUCTURE PROFILE

4+35 4+50 5+00 5+50 6+00 6+47

STA 5+36

ELEV 989.92

STA 5+60

ELEV 988.77

FINISHED STREAM SIMULATION GRADE

FINISHED ROAD TEMPLATE

S T

A

E L

E V

S T

A

E L

E V

S T

A

E L

E V

S T

A

E L

E V

S T

A

E L

E V

S T

A

E L

E V

S T

A

E L

E V

S T

A

E L

E V

S T

A

E L

E V

S T

A

E L

E V

0.90%

2.72%

2.66%

2.62%

-0.08%

S T

A

T O

P

E

L E

V

M A

T C

H

T

O

E X

I S

T I N

G

G

R A

D E

S T

A

T O

P

E

L E

V

S T

E P

S T

A

T O

P

E

L E

V

S T

E P

S T

A

T O

P

E

L E

V

S T

E P

S T

A

T O

P

E

L E

V

S T

E P

S T

A

T I

O

E

X I S

T I N

G

G R

A D

E

C

O N

T R

O L

STREAM SIMULATION LAYOUT

NTS

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

R09

EASTERN REGION

CROOKED FORK

CULVERT

REPLACEMENTS

MONONGAHELA

NATIONAL FOREST

MARLINTON RANGER DISTRICT

MP 0.5 STREAM PROFILE

06/22/2019

L.DIFIORE

DIFIORE/GOMEZ C-12

17 27

SEE SHEET 19 FOR STREAM SIMULATION

DETAILS.

STREAM

CENTERLINE

STA ELEV

4+87.48 997.1300

5+00.44 997.2400

5+01.43 998.7900

5+19.70 996.2900

5+20.54 994.8300

5+39.31 995.3300

5+40.31 993.8800

5+59.31 994.3800

5+60.31 992.9300

5+79.30 994.3800

5+80.30 991.9700

5+98.79 992.4800

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

FS BOUNDARY

R

M

I

N

A

L

R

M

I

N

A

L

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

R09

EASTERN REGION

CROOKED FORK

CULVERT

REPLACEMENTS

MONONGAHELA

NATIONAL FOREST

MARLINTON RANGER DISTRICT

MP 0.5 GUARDRAIL &

SIGN PLAN

02/01/2020

L.DIFIORE

L. DIFIORE

C.GOMEZ

C-13 18 27

Feet

0 15 30

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

R9

EASTER REGION

CROOKED FORK

CULVERT

REPLACEMENTS

MONONGAHELA

NATIONAL FOREST

MARLINTON RANGER DISTRICT

CROOKED FORK ROAD

AND FOUNDATION

DETAILS

6/13/2019

DIFIORE/GOMEZ

C.GOMEZ

X.XXX

C-14 19 27

AutoCAD SHX Text

TYPICAL BYPASS ROAD SURFACING CROSS SECTION NTS

AutoCAD SHX Text

SIDE SLOPE OF 2H:1V MAX

AutoCAD SHX Text

CROWN WITH 2% SLOPE

AutoCAD SHX Text

6" COMPACTED AGGREGATE, CLASS 1

AutoCAD SHX Text

FOUNDATION DETAIL (TYP.) N.T.S.

AutoCAD SHX Text

STREAM SIMULATION SEE SHEET 21

AutoCAD SHX Text

BANKS SEE SHEET 21

AutoCAD SHX Text

STRUCTURAL BACKFILL SEE SHEET 20

AutoCAD SHX Text

CONTECH EXPRESS PRECAST FOOTINGS

AutoCAD SHX Text FOUNDATION NOTES: 1. FOUNDATION DESIGN SHALL BE THE RESPONSIBILITY OF THE FOUNDATION DESIGN SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR IN COORDINATION WITH THE STRUCTURE MANUFACTURER FOR PROPER SIZING AND FIT. THE FOUNDATIONS DESIGN SHALL BE PERFORMED BY A LICENSED PROFESSIONAL ENGINEER AND SHALL BE SUBMITTED TO THE CO FOR APPROVAL. 2. THE DESIGN TO BE IN ACCORDANCE WITH AASHTO LRFD THE DESIGN TO BE IN ACCORDANCE WITH AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS 8TH EDITION FOR HL-93 LOADING. 3. FOR INFORMATION ON CHANNEL DIVERSION DURING FOR INFORMATION ON CHANNEL DIVERSION DURING CONSTRUCTION, SEE SPECIAL CONTRACT REQUIREMENT 208. 4. OVER-EXCAVATION AND REPLACEMENT WITH FOUNDATION FILL OVER-EXCAVATION AND REPLACEMENT WITH FOUNDATION FILL MAY BE REQUIRED PER STANDARD AND SPECIAL CONTRACT REQUIREMENT SECTION 208.08(d). 5. FOUNDATION SHALL BE APPROVED BY THE CO. REFER TO FOUNDATION SHALL BE APPROVED BY THE CO. REFER TO SPECIAL CONTRACT REQUIREMENT 208. GEOTEXTILE MAY BE USED AS APPROVED BY THE CO. PLACE 6"THICK GRANULAR FILL WITH SEPARATION GEOTEXTILE UNDER FOUNDATION. DETAILS SUBJECT TO CHANGE AS PER MANUFACTURER'S RECOMMENDATIONS. 6. ANY EXCESS AND UNSUITABLE EXCAVATION SHALL BE ANY EXCESS AND UNSUITABLE EXCAVATION SHALL BE DISPOSED OF IN LOCATIONS APPROVED BY THE CO.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

6" THICKNESS COMPACTED AGGREGATE , CLASS 1

AutoCAD SHX Text

BACKFILL OVER STRUCTURE

AutoCAD SHX Text

TOP OF STRUCTURE

AutoCAD SHX Text

TYPICAL ROAD SURFACING CROSS SECTION NTS

AutoCAD SHX Text

2% CROWN

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

R9

EASTERN REGION

CROOKED FORK

CULVERT

REPLACEMENTS

MONONGAHELA

NATIONAL FOREST

MARLINTON RANGER DISTRICT

CROOKED FORK

EXCAVATION DETAILS

6/13/2019

DIFIORE/GOMEZ

C.GOMEZ

X.XXX

C-15 20 27

AutoCAD SHX Text

ROADWAY SURFACE

AutoCAD SHX Text LEGEND: STRUCTURAL EXCAVATION (PAY ITEM 20801) STRUCTURAL BACKFILL (PAY ITEM 20803) FOUNDATION FILL (INCIDENTAL TO 63501)

AutoCAD SHX Text

TYPICAL EARTHWORK CROSS SECTION N.T.S.

AutoCAD SHX Text

TYPICAL CULVERT CROSS SECTION N.T.S.

AutoCAD SHX Text STRUCTURAL EXCAVATION NOTES 1. COMPLETE STRUCTURE EXCAVATION IN ACCORDANCE WITH FP-14 COMPLETE STRUCTURE EXCAVATION IN ACCORDANCE WITH FP-14 SECTION 209. 2. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EXCAVATION THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EXCAVATION SUPPORT AND COMPLIANCE WITH ALL APPLICABLE OSHA REGULATIONS. 3. USE GEOTECHNICAL REPORT TO DETERMINE EXCAVATION LIMITS. USE GEOTECHNICAL REPORT TO DETERMINE EXCAVATION LIMITS. EXCAVATION LIMITS SHOWN SHALL COMPLY WITH OSHA SLOPING AND BENCHING REQUIREMENTS. 4. CLEAR AREA OF VEGETATION AND OBSTRUCTIONS PRIOR TO CLEAR AREA OF VEGETATION AND OBSTRUCTIONS PRIOR TO EXCAVATION. 5. CONSERVE ALL SUITABLE MATERIAL FOR STRUCTURAL BACKFILL AND CONSERVE ALL SUITABLE MATERIAL FOR STRUCTURAL BACKFILL AND OTHER BACKFILL PURPOSES. 6. DO NOT STOCKPILE EXCAVATED MATERIAL OR ALLOW CONSTRUCTION DO NOT STOCKPILE EXCAVATED MATERIAL OR ALLOW CONSTRUCTION EQUIPMENT CLOSER THAN 2 FEET FROM THE EDGE OF ANY EXCAVATIONS. STRUCTURAL BACKFILL NOTES 1. PLACE STRUCTURAL BACKFILL IN ACCORDANCE WITH FP-14 SECTION PLACE STRUCTURAL BACKFILL IN ACCORDANCE WITH FP-14 SECTION 209.09, WITH MATERIAL MEETING THE REQUIREMENTS OF SECTION 704.03, BACKFILL. 2. PLACE STRUCTURAL BACKFILL IN HORIZONTAL LAYERS THAT DO NOT PLACE STRUCTURAL BACKFILL IN HORIZONTAL LAYERS THAT DO NOT EXCEED 6 INCHES IN COMPACTED THICKNESS. 3. PLACE STRUCTURAL BACKFILL LAYERS EVENLY ON ALL SIDES OF PLACE STRUCTURAL BACKFILL LAYERS EVENLY ON ALL SIDES OF THE STRUCTURE AS APPROPRIATE. EXTEND EACH LAYER TO THE LIMITS OF THE EXCAVATION OR TO NATURAL GROUND. 4. STRUCTURAL BACKFILL SHALL BE SCREENED TO REMOVE ALL STRUCTURAL BACKFILL SHALL BE SCREENED TO REMOVE ALL PARTICLES LARGER THAN 3 INCHES, OR UTILIZED COMMERCIALLY-IMPORTED MATERIAL COMPRISING OF 3 INCH MINUS MATERIAL. 5. BACKFILL LIMITS SHOWN ON THIS SHEET ARE THE MINIMUM BACKFILL LIMITS SHOWN ON THIS SHEET ARE THE MINIMUM REQUIREMENTS. 6. ANY BACKFILL OUTSIDE THE LIMITS SHOWN IS CONSIDERED ANY BACKFILL OUTSIDE THE LIMITS SHOWN IS CONSIDERED EMBANKMENT AND SHALL MEET THE REQUIREMENTS FOR EMBANKMENT CONSTRUCTION. 7. IT IS ASSUMED THAT THE MATERIAL FROM STRUCTURAL EXCAVATION IT IS ASSUMED THAT THE MATERIAL FROM STRUCTURAL EXCAVATION AT THIS SITE WILL MEET THE REQUIREMENTS FOR BACKFILL. MATERIAL SCREENING TO OBTAIN THE MAXIMUM ALLOWABLE PARTICLE SIZE IS REQUIRED. 8. COMPACT BACKFILL IN ACCORDANCE WITH FP-14 SECTION 209.10 COMPACT BACKFILL IN ACCORDANCE WITH FP-14 SECTION 209.10 (AASHTO T99, METHOD C AND AASHTO T310) AND SUBMIT TEST RESULTS TO THE CONTRACTING OFFICER.

AutoCAD SHX Text

TYPICAL FOUNDATION DETAIL SEE SHEET 19

AutoCAD SHX Text

PLACED STREAMBED CHANNEL ROCK, PLACEMENT METHOD A SEE STREAM SIMULATION DETAILS

AutoCAD SHX Text

PLACED STREAMBED SIMULATION ROCK SEE STREAM SIMULATION DETAILS

AutoCAD SHX Text

PROPOSED 3 SIDED RIGID FRAME STRUCTURE, CONSPAN O-SERIES

AutoCAD SHX Text

AGGREGATE SURFACE COURSE 6 INCHES DEPTH, WVDOT CLASS 1, COMPACTION METHOD 5

AutoCAD SHX Text

CONTECH EXPRESS FOUNDATION

AutoCAD SHX Text

EXISTING STRUCTURE REMOVE AND DISPOSE

AutoCAD SHX Text

LIMITS OF EXCAVATION (TYP.)

AutoCAD SHX Text STRUCTURAL BACKFILL - FOLLOW MANUFACTURER'S RECOMMENDATIONS ON SOIL TYPE & DISTANCES MINIMUM REQUIREMENTS.

AutoCAD SHX Text

SEE NOTE NO.1 - STRUCTURAL EXCAVATION NOTES

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

R9

EASTERN REGION

CROOKED FORK

CULVERT

REPLACEMENTS

MONONGAHELA

NATIONAL FOREST

MARLINTON RANGER DISTRICT

STREAM SIMULATION

LAYOUT

6/13/2019

L.DIFIORE

C.GOMEZ

X.XXX

C-16 21 27

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text CROOKED FORK MP 0.1 REFERENCE REACH: 450 FT ABOVE CROSSING GRAVEL/COBBLE BED APPROX. 40% EMBEDDED RIFFLE SEQUENCE

AutoCAD SHX Text CROOKED FORK MP 0.5 REFERENCE REACH: 300 FT ABOVE CROSSING GRAVEL/COBBLE BED APPROX. 50% EMBEDDED STEP-POOL SEQUENCE

STREAM SIMULATION NOTES: 1. STREAMBED FINISHED GRADE SHALL BE PLACED IN AN IRREGULAR MATTER TO PROVIDE FOR LOW FLOW AQUATIC PASSAGE. STREAMBED FINISHED GRADE SHALL BE PLACED IN AN IRREGULAR MATTER TO PROVIDE FOR LOW FLOW AQUATIC PASSAGE. 2. CHANNEL ROCK CLUSTERS SHALL PROTRUDE RANDOMLY ABOVE THE STREAM BED, AT 1 TO 6 INCHES. CHANNEL ROCK CLUSTERS SHALL PROTRUDE RANDOMLY ABOVE THE STREAM BED, AT 1 TO 6 INCHES. 3. ROCK SPANNING RIBS/STEP LOCATIONS SHALL BE STAKED IN THE FIELD AND APPROVED BY THE CONTRACTING OFFICER PRIOR TO INSTALLATION. ROCK SPANNING RIBS/STEP LOCATIONS SHALL BE STAKED IN THE FIELD AND APPROVED BY THE CONTRACTING OFFICER PRIOR TO INSTALLATION. 4. CHANNEL ROUGHNESS BOULDERS SHALL BE PLACED AT THE DIRECTION OF THE CONTRACTING OFFICER. CHANNEL ROUGHNESS BOULDERS SHALL BE PLACED AT THE DIRECTION OF THE CONTRACTING OFFICER. 5. SUITABLE EXCAVATED MATERIAL USED FOR THE STREAM BOTTOM SHALL MEET THE GRADATION REQUIREMENTS, AS SHOWN ON THE DRAWINGS OR AS APPROVED SUITABLE EXCAVATED MATERIAL USED FOR THE STREAM BOTTOM SHALL MEET THE GRADATION REQUIREMENTS, AS SHOWN ON THE DRAWINGS OR AS APPROVED BY THE CONTRACTING OFFICER. 6. WHEN SUITABLE EXCAVATED MATERIAL IS NOT AVAILABLE, THE CONTRACTOR SHALL SOURCE A MATERIAL MEETING THE SPECIFICATIONS FOR THE GRADATION OF WHEN SUITABLE EXCAVATED MATERIAL IS NOT AVAILABLE, THE CONTRACTOR SHALL SOURCE A MATERIAL MEETING THE SPECIFICATIONS FOR THE GRADATION OF THE STREAMBED SIMULATION ROCK TABLE SHOWN IN THE DRAWINGS. 7. VARY DIRECTION AND SHAPE OF THE GRADE CONTROL STRUCTURES. ANGLE SLIGHTLY AND CHANGE ORIENTATION. STEPS/RIBS STRAIGHT ACROSS THE CHANNEL VARY DIRECTION AND SHAPE OF THE GRADE CONTROL STRUCTURES. ANGLE SLIGHTLY AND CHANGE ORIENTATION. STEPS/RIBS STRAIGHT ACROSS THE CHANNEL ARE NOT DESIRABLE 8. STEP/RIB PLACEMENT IS +OR- 1FT FROM DESIGNATED STATION STEP/RIB PLACEMENT IS +OR- 1FT FROM DESIGNATED STATION 9. BANKFUL WIDTH IS 34 FT FOR MP 0.1 AND 17FT FOR MP 0.5 (+OR-0.5FT) BANKFUL WIDTH IS 34 FT FOR MP 0.1 AND 17FT FOR MP 0.5 (+OR-0.5FT) 10. BANKS OUTSIDE OF STRUCTURE WILL TRANSITION WIDTH AND BLEND AT THE DESIGNATED STATIONBANKS OUTSIDE OF STRUCTURE WILL TRANSITION WIDTH AND BLEND AT THE DESIGNATED STATION

VARIES

16' - 18'

AVE = 17'

1.5' TYP

TABLE 6.4 - STREAM SIMULATION MATERIAL

TABLE 6.5 - CHANNEL ROCK MATERIAL

TABLE 6.6 - KEY PIECES

TABLE 6.1 - STREAM SIMULATION MATERIAL

TABLE 6.2 - CHANNEL ROCK MATERIAL

TABLE 6.3 - KEY PIECES

VARIES

36' MAX TAPERING TO 34'

AT POOL APPROACH

2'

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

R9

EASTERN REGION

CROOKED FORK

CULVERT

REPLACEMENT S

MONONGAHELA

NATIONAL FOREST

MARLINTON RANGER DISTRICT

STREAM SIMULATION

DETAILS

6/13/2019

DIFIORE/GOMEZ

DIFIORE/GOMEZ

X.XXX

C-17 22 27

AutoCAD SHX Text

%%UDESIGN POOL CROSS SECTION

AutoCAD SHX Text GENERAL NOTES: 1. SORT & PLACE BOULDERS ALONG BANK LINES AS SHOWN IN DETAILS. FILL ALL VOIDS WITH BED CLASS STREAM SIMULATION MATERIAL. SORT & PLACE BOULDERS ALONG BANK LINES AS SHOWN IN DETAILS. FILL ALL VOIDS WITH BED CLASS STREAM SIMULATION MATERIAL. 2. UTILIZE ONSITE MATERIAL FOR STREAM SIMULATION ROCK IF APPROPRIATE. UTILIZE ONSITE MATERIAL FOR STREAM SIMULATION ROCK IF APPROPRIATE. 3. UTILIZE ONSITE ROCK FOR CHANNEL ROCK BEFORE HAULING IN ADDITIONAL ROCK. ADDITIONAL CHANNEL ROCK SHALL BE SIMILAR IN COLOR & TEXTURE AS NATIVE MATERIALS. UTILIZE ONSITE ROCK FOR CHANNEL ROCK BEFORE HAULING IN ADDITIONAL ROCK. ADDITIONAL CHANNEL ROCK SHALL BE SIMILAR IN COLOR & TEXTURE AS NATIVE MATERIALS. 4. WHEN CHANNEL ROCK ARE USED IN CHANNEL, EMBED 50 - 75% TO CREATE POCKET POOLS. WHEN CHANNEL ROCK ARE USED IN CHANNEL, EMBED 50 - 75% TO CREATE POCKET POOLS. 5. BOULDERS MAY BE USED IN ADDITION TO CHANNEL ROCK TO CONSTRUCT BANKS. BOULDERS MAY BE USED IN ADDITION TO CHANNEL ROCK TO CONSTRUCT BANKS. 6. RIFFLES TYPICALLY NARROW & STEEPEN AT THE DOWNSTREAM SECTION. THE LOWER THIRD TYPICALLY CONSTRICTS TO 70-80% OF BANKFULL WIDTH & STEEPENS BY A FACTOR OR 1.5-3.0 RIFFLES TYPICALLY NARROW & STEEPEN AT THE DOWNSTREAM SECTION. THE LOWER THIRD TYPICALLY CONSTRICTS TO 70-80% OF BANKFULL WIDTH & STEEPENS BY A FACTOR OR 1.5-3.0 COMPARED TO THE UPPER GRADIENT.

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

CONSTRUCT BANKS W/BOULDERS & CLASS 4 CHANNEL ROCK

AutoCAD SHX Text

STREAM SIMULATION MATERIAL

AutoCAD SHX Text

BED CLASS CF MP 0.5

AutoCAD SHX Text

ESTIMATED QUANTITY: 56 CY

AutoCAD SHX Text

PERCENT PASSING

AutoCAD SHX Text

PARTICLE DIAMETER (IN)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1-1/2

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text #8

AutoCAD SHX Text

ROCK CLASS CF MP 0.5 CR - 4

AutoCAD SHX Text

ESTIMATED QUANTITY: 15 CY

AutoCAD SHX Text

MASS (LB)

AutoCAD SHX Text

APPROX. CUBIC DIMENSION (IN)

AutoCAD SHX Text 1350 - 2400

AutoCAD SHX Text 30 - 36

AutoCAD SHX Text

ROCK CLASS CF MP 0.5 CR - 7

AutoCAD SHX Text

ESTIMATED QUANTITY: 10 EA

AutoCAD SHX Text

MASS (LB)

AutoCAD SHX Text

APPROX. CUBIC DIMENSION (IN)

AutoCAD SHX Text 5500 - 7900

AutoCAD SHX Text 48 - 54

AutoCAD SHX Text

BED CLASS CF MP 0.1

AutoCAD SHX Text

ESTIMATED QUANTITY: 100 CY

AutoCAD SHX Text

PERCENT PASSING

AutoCAD SHX Text

PARTICLE DIAMETER (IN)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1-1/4

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text #10

AutoCAD SHX Text

ROCK CLASS CF MP 0.1 CR - 4

AutoCAD SHX Text

ESTIMATED QUANTITY: 25 CY

AutoCAD SHX Text

MASS (LB)

AutoCAD SHX Text

APPROX. CUBIC DIMENSION (IN)

AutoCAD SHX Text 1350 - 2400

AutoCAD SHX Text 30 - 36

AutoCAD SHX Text

ROCK CLASS CF MP 0.1 CR - 6

AutoCAD SHX Text

ESTIMATED QUANTITY: 10 EA

AutoCAD SHX Text

MASS (LB)

AutoCAD SHX Text

APPROX. CUBIC DIMENSION (IN)

AutoCAD SHX Text 3700 - 5500

AutoCAD SHX Text 42 - 48

AutoCAD SHX Text

STREAM SIMULATION MATERIAL

AutoCAD SHX Text

CONSTRUCT BANKS W/BOULDERS & CLASS 4 CHANNEL ROCK

AutoCAD SHX Text

%%UDESIGN RIFFLE CROSS SECTION

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

R9

EASTERN REGION

CROOKED FORK

CULVERT

REPLACEMENT S

MONONGAHELA

NATIONAL FOREST

MARLINTON RANGER DISTRICT

CROOKED FORK MISC.

DETAILS

6/13/2019

L. DIFIORE

L. DIFIORE

X.XXX

C-18 23 27

NO SCALE

TYPICAL CULVERT SECTION

ROADBED

SLOPE 4%

CAMBER

L

NO WINDROW CONSTRUCTION OR SLASH

PERMITTED IN STREAM CHANNELS OR AT

CULVERT OUTLETS.

CULVERT TO BED ON NATURAL GROUND

@ OUTLET

12" MIN. COVER OVER

CULVERT

SEEDING

WIDTH

12 FT MINIMUM WIDTH

SEEDING

WIDTH

C

CULVERT NOTES:

1. PIPE SHALL BE INSTALLED SO THE BOTTOM IS IN CONTACT WITH BEDDING

THROUGHOUT IT'S LENGTH.

2. FINAL INSTALLED ALIGNMENT SHALL BE SUCH THAT NO REVERSE GRADES EXIST

& NO POINT SHALL VARY FROM A STRAIGHT LINE DRAWN FROM INLET TO

OUTLET BY MORE THAN 2% HORIZONTALLY & VERTICALLY OF THE CULVERT

LENGTH.

3. BACKFILL SHALL BE PLACED IN LAYERS NOT TO EXCEED 12 INCHES &

COMPACTED WITH A MECHANICAL TAMPER UNTIL ALL VISIBLE DISPLACEMENT

CEASES.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

R9

EASTERN REGION

CROOKED FORK

CULVERT

REPLACEMENTS

MONONGAHELA

NATIONAL FOREST

MARLINTON RANGER DISTRICT

GUARDRAIL FLARED

END TERMINAL

02/1/2020

DIFIORE/GOMEZ

DIFIORE/GOMEZ

X.XXX

GR-1

24 27

AutoCAD SHX Text

ELEVATION

AutoCAD SHX Text 6'-3"

AutoCAD SHX Text 12'-6"

AutoCAD SHX Text

OF RAIL.

AutoCAD SHX Text 25'-0"

AutoCAD SHX Text 6'-3"

AutoCAD SHX Text

NOTES

AutoCAD SHX Text

MEASURED

AutoCAD SHX Text

AT BACK

AutoCAD SHX Text

LENGTH OF NEED FOR GUARDRAIL

AutoCAD SHX Text

POST AND WOOD BLOCKOUT

AutoCAD SHX Text

AS PER STAND. DETAIL SHEET GR2

AutoCAD SHX Text

LENGTH OF NEED TERMINAL POINT

AutoCAD SHX Text

AS SHOWN IN THE PLANS

AutoCAD SHX Text

(MAX.)

AutoCAD SHX Text

TANGENT LINE PROJECTED FROM THE FACE OF THE LAST TWO

AutoCAD SHX Text

POST BLOCKS IN THE STANDARD POST SECTION.

AutoCAD SHX Text

BREAK POINT

AutoCAD SHX Text 15:1

AutoCAD SHX Text

4:1 SLOPE

AutoCAD SHX Text 15:1

AutoCAD SHX Text

GRADE TO MATCH

AutoCAD SHX Text

EXISTING SLOPE

AutoCAD SHX Text

TRANSITION BACK TO EXISTING SHOULDER BREAK POINT

AutoCAD SHX Text

FACE OF POST

AutoCAD SHX Text

SHOULDER

AutoCAD SHX Text

BREAK POINT

AutoCAD SHX Text

(MAX.)

AutoCAD SHX Text

SLOPE 4:1 OR FLATTER

AutoCAD SHX Text

10:1 SLOPE

AutoCAD SHX Text

10:1 SLOPE

AutoCAD SHX Text

SLOPE 4:1 OR FLATTER

AutoCAD SHX Text

(MAX.)

AutoCAD SHX Text

10:1 SLOPE

AutoCAD SHX Text

GRADE TO MATCH

AutoCAD SHX Text

EXISTING SLOPE

AutoCAD SHX Text

TERMINAL POST IS INCLUDED

AutoCAD SHX Text

FOR PAYMENT WITH GUARDRAIL.

AutoCAD SHX Text

PARABOLIC LAYOUT PLAN

AutoCAD SHX Text

DEDUCT 25'-0" FROM THE

AutoCAD SHX Text

37'-6" FLARED TERMINAL PER PRE-APPROVED SHOP DRAWING

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text

3'-0" (MIN.)

AutoCAD SHX Text

SHOULDER

AutoCAD SHX Text 1'-0"

AutoCAD SHX Text 26'-0"

AutoCAD SHX Text

YELLOW REFLECTIVE ADHESIVE SHEETING

AutoCAD SHX Text

TO BE APPLIED TO NOSE.

AutoCAD SHX Text

"FLARED END TERMINAL"

AutoCAD SHX Text

GUARDRAIL PAY LIMIT

AutoCAD SHX Text

PAY LIMITS ITEM 61703

AutoCAD SHX Text PROVIDE SHOP DRAWINGS. THE POST OFFSET DIMENSIONS ARE GIVEN TO THE CENTER OF THE TRAFFIC FACE OF THE BLOCKOUTS; EXCEPT AT THE FIRST POST, WHERE THE DIMENSION IS TO THE CENTER OF THE TRAFFIC FACE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .