Attachment_5.docx

DOCX document 19 KB Posted

Attached to
Elleber Temporary Bridge Project Federal contract opportunity
Solicitation number
12343419R0004
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

Attachment 5 Technical Proposal Guide

View the file

Other files for this federal contract opportunity

Other files attached to Elleber Temporary Bridge Project, newest first.
File Type Posted
Modification_of_Contract.pdf PDF
Attachment_1_page8.pdf PDF
Attachment_1_page4.pdf PDF
Attachment_1_page10.pdf PDF
Attachment_2.pdf PDF
Attachment_3.pdf PDF
Attachment_1_page3.pdf PDF
Attachment_1_page2.pdf PDF
Attachment_1_page6.pdf PDF
Attachment_1_page7.pdf PDF
Attachment_4.pdf PDF
12343419R0004.pdf PDF
Attachment_1_page5.pdf PDF
Attachment_1_page9.pdf PDF
Attachment_1_page1.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12343419R0004 THIS IS ONLY AN EXAMPLE FOR YOUR CONVENIENCE. YOU ARE NOT REQUIRED AND WILL NOT BE AFFORDED A HIGHER/ACCEPTABLE RATING BECAUSE YOU USE THIS EXAMPLE. FOR INFORMATIONAL PURPOSES ONLY.

1. Capability to Perform (Work Plan)

Work Plan – outline the critical path you plan to take and include the dates and/or materials needed to complete each task

EXAMPLE

EXAMPLE PLAN

Provide Plan for Project Item

EXAMPLE ITEMS

Items needed to complete Plan

Purchase Materials
Abutments

XX Days prior to need

Haul Items
Obtain State of XX road Permits and provide copy to FS. Back structure to point “X”. Temporary Roadway modification with culverts, gravel at point “XXX”, etc.
Equipment, Materials and Labor.

Flatbed trailer, trucks, loader, gravel, culverts.

X# Labor, X# equipment operators X# truck driver

Dewatering
Divert water from stream
Equipment, Materials and Labor XX Gal Pump, XX Ft Hose
Prep Footers
Survey and layout, dig, fill compact
Equipment, Materials and Labor Survey crew, ZXY Excavator, Operator, Gravel, fabric.
Offload
Create crane pad at location “X”. Make turn around, etc.

Place abutments Equipment, Materials and Labor XX Ton Crane, XYZ Dozer, ZXY Excavator. Gravel

Project Completion
Restore back to original, Perform Stream work
Equipment, Materials , Labor

XYZ Backhoe, X# labors, Truck

2. Capability to Perform (Equipment) –

EQUIPMENT
TASKS ASSOCIATED WITH

EXAMPLE

XYZ Motor Grader Grading

3. Experience – EXAMPLES OF HOW TO SUBMIT INFO

a) AG-64R4-C-XX-XXXX

b) $100,000

c) Job involved blading 50 miles of single lane road and 25 miles of double lane road. Also installed 2 HDPE culverts and 3 CMP culverts.

d) Edgar Springs, MO

e) June 2014 – October 2014

f) Smokey Bear 401 Fairgrounds Rd. Rolla, MO 573-341-5555

a) Road Resurfacing – Rat Creek

b) $50,000

c) Job involved building a road, etc…

d) Rat Town

e) July 2015-September 2015

f) Bob Smith/MoDot MoDot HQ 573-555-8888

4. Safe Project Management –

· My company emphasizes safety in day to day operations by __________.

· Safe practices for road closure/signage are accomplished by _______________.

· A safety plan exists and includes X, Y, Z. OR safety plan is included as part of proposal.

· Employees are trained in X, Y, Z aspects of safety/operating safely.

· OSHA record is attached or description.

5. Communication Plan –

· Government will be able to contact my company at ___________.

· The following employees have the authority to act on behalf of my company: