Attachment 5 Technical Proposal Guide
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Modification_of_Contract.pdf | ||
| Attachment_1_page8.pdf | ||
| Attachment_1_page4.pdf | ||
| Attachment_1_page10.pdf | ||
| Attachment_2.pdf | ||
| Attachment_3.pdf | ||
| Attachment_1_page3.pdf | ||
| Attachment_1_page2.pdf | ||
| Attachment_1_page6.pdf | ||
| Attachment_1_page7.pdf | ||
| Attachment_4.pdf | ||
| 12343419R0004.pdf | ||
| Attachment_1_page5.pdf | ||
| Attachment_1_page9.pdf | ||
| Attachment_1_page1.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12343419R0004 THIS IS ONLY AN EXAMPLE FOR YOUR CONVENIENCE. YOU ARE NOT REQUIRED AND WILL NOT BE AFFORDED A HIGHER/ACCEPTABLE RATING BECAUSE YOU USE THIS EXAMPLE. FOR INFORMATIONAL PURPOSES ONLY.
1. Capability to Perform (Work Plan)
Work Plan – outline the critical path you plan to take and include the dates and/or materials needed to complete each task
EXAMPLE
EXAMPLE PLAN
Provide Plan for Project Item
EXAMPLE ITEMS
Items needed to complete Plan
| Purchase Materials |
| Abutments |
XX Days prior to need
| Haul Items |
| Obtain State of XX road Permits and provide copy to FS. Back structure to point “X”. Temporary Roadway modification with culverts, gravel at point “XXX”, etc. |
| Equipment, Materials and Labor. |
Flatbed trailer, trucks, loader, gravel, culverts.
X# Labor, X# equipment operators X# truck driver
| Dewatering |
| Divert water from stream |
| Equipment, Materials and Labor XX Gal Pump, XX Ft Hose |
| Prep Footers |
| Survey and layout, dig, fill compact |
| Equipment, Materials and Labor Survey crew, ZXY Excavator, Operator, Gravel, fabric. |
| Offload |
| Create crane pad at location “X”. Make turn around, etc. |
Place abutments Equipment, Materials and Labor XX Ton Crane, XYZ Dozer, ZXY Excavator. Gravel
| Project Completion |
| Restore back to original, Perform Stream work |
| Equipment, Materials , Labor |
XYZ Backhoe, X# labors, Truck
2. Capability to Perform (Equipment) –
| EQUIPMENT |
| TASKS ASSOCIATED WITH |
EXAMPLE
XYZ Motor Grader Grading
3. Experience – EXAMPLES OF HOW TO SUBMIT INFO
a) AG-64R4-C-XX-XXXX
b) $100,000
c) Job involved blading 50 miles of single lane road and 25 miles of double lane road. Also installed 2 HDPE culverts and 3 CMP culverts.
d) Edgar Springs, MO
e) June 2014 – October 2014
f) Smokey Bear 401 Fairgrounds Rd. Rolla, MO 573-341-5555
a) Road Resurfacing – Rat Creek
b) $50,000
c) Job involved building a road, etc…
d) Rat Town
e) July 2015-September 2015
f) Bob Smith/MoDot MoDot HQ 573-555-8888
4. Safe Project Management –
· My company emphasizes safety in day to day operations by __________.
· Safe practices for road closure/signage are accomplished by _______________.
· A safety plan exists and includes X, Y, Z. OR safety plan is included as part of proposal.
· Employees are trained in X, Y, Z aspects of safety/operating safely.
· OSHA record is attached or description.
5. Communication Plan –
· Government will be able to contact my company at ___________.
· The following employees have the authority to act on behalf of my company:
6. Bio-Preferred Products –
We will attempt to utilize the following products: