REQUISITION PACKAGE - SOW.pdf

PDF 194 KB Posted

Attached to
Cooler Upgrade Federal contract opportunity
Solicitation number
12305B24Q0023
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Northeast Area

About this file

This statement of work outlines the requirements for upgrading the cooler equipment at the United States Department of Agriculture Agricultural Research Service facility in University Park, Pennsylvania. The contractor shall remove the existing condensing unit, evaporator, thermostat and controls, and install new equipment according to the specifications provided. The contractor must furnish all labor, permits, materials, and equipment to complete the work safely within 60 days of receiving a notice to proceed. Key personnel contacts and normal working hours are defined. The contractor must adhere to all safety requirements and coordinate work to avoid impacts to ongoing research activities.

The related federal contract opportunity is a solicitation to provide the cooler upgrade services defined in the statement of work. The selected contractor will furnish all required labor, insurance, tools, materials and equipment to remove the existing and install a new condensing unit, evaporator, thermostat and controls at the USDA Agricultural Research Service facility in University Park, Pennsylvania, as outlined in the attached statement of work.

View the file

Other files for this federal contract opportunity

Other files attached to Cooler Upgrade, newest first.
File Type Posted
RFQ 12305B24Q0023.pdf PDF
RFI 001 Responses COR 18DEC2023.pdf PDF
Attachment 5 - Existing Cooler Photos.pdf PDF
Attachment 4 - COMPRESSOR CONTROLS SPECS.pdf PDF
Attachment 3 - POLAR KING AE SPECS.pdf PDF
Attachment 2 - Aerial Site Photo of Cooler Location.pdf PDF
RFQ 12305B24Q0023.pdf PDF
Attachment 1 - DIV 1 USDA GEN REQUIREMENTS 3AUG2023.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIVERSITY PARK, PA COOLER UPGRADES

STATEMENT OF

WORK

November 16, 2023

1.0 SCOPE

The United State Department of Agriculture (USDA), Agricultural Research Service (ARS), Pasture Systems & Watershed Management Research Unit (PSWMRU) located at Tower Rd.

University Park, PA 16802 (i.e. the “Location”) plans to upgrade certain components of the existing cooler with new equipment.

2.0 WORK

The Contractor shall provide all labor, insurance, permits, tools, material, equipment, and travel to complete the work listed below. All work shall be completed by properly trained and licensed personnel or sub-contractors in accordance with the terms, conditions, and specifications contained in this document. The Contractor shall keep the work premises clean, free of accumulations of waste and rubbish, as well as construction material, to the extent possible and practical, during the period of performance and at the time of final inspection and acceptance.

2.1 REFERENCES

• Attachment 1 – Specification 01 01 00 General Conditions rev August 3, 2023

• Attachment 2 – Aerial Site Photo of Cooler Location

• Attachment 3 – Existing Polar King Cooler Specifications and Drawings

• Attachment 4 – Existing Emerson Climate Technologies Condensing Unit and

Controls Product Data

• Attachment 5 – Existing Cooler Photos

2.2 DEMOLITION & REMOVAL OF THE EXISTING COOLER EQUIPMENT

The contractor shall disconnect all utilities (power and controls) to the existing cooler equipment. Reclaim existing refrigerant and legally dispose of off-site. Remove the existing condensing unit, evaporator, thermostat and controls and dispose of off-site.

2.3 INSTALLATION OF NEW COOLER EQUIPMENT

The contractor shall furnish and install a new condensing unit, evaporator, thermostat and controls and associated wiring. Reconnect all existing refrigerant piping to the new condenser and evaporator. Pressure test and evacuate the system and then charge the system with R407C refrigerant. Install the new thermostat and controls and all associated power and control wiring. Reconnect all utilities to the cooler. Start up and test the equipment to ensure proper operation. Provide training to Location personnel on the new equipment’s operation.

2.4 SITE LOGISTICS AND SCHEDULING

The contractor shall ensure the work does not negatively affect the operation of the adjacent buildings and does not impact any research activities. The contractor shall schedule the work with the Location Monitor (LM) to avoid any impact to ongoing research activities. Onsite parking, staging and laydown areas are available for the contractors’ use, coordinate the location of each with the Location Monitor (LM).

2.5 CODE COMPLIANCE

All construction shall conform to the International Building Code (IBC).

2.6 SUBMITTALS DISTRIBUTION AND FORMAT

Provide submittals for all materials and tests required by the project. Submittals shall include the following:

2.6.1 SCHEDULE OF SUBMITTALS

.1 Construction Work Plan

.2 Construction Progress Schedule

.3 Schedule of Values

.4 Quality Control Plan

.6 Site Specific Safety Plan

.7 Condenser, evaporator, thermostat and controls product data & shop drawings

.8 Equipment start up test report .9 Material & Workmanship Warranty

Submit to the Contracting Officer (CO), the Contracting Officer’s Representative (COR) and the Location Monitor (LM) for review and approval. Distribute product submittals as follows:

2.6.2 CO, COR, and LM: Submittals in pdf format via email.

2.6.3 Comments and approval of the submittals by the Government shall not be construed as releasing the Contractor from compliance with the specified requirements herein or any applicable Codes.

2.7 PERIOD OF PERFORMANCE

2.7.1 The Period of Performance (PoP) of this work shall be sixty (60) days from the Notice to Proceed (NTP).

3.1 GENERAL REQUIREMENTS

3.1.1 See Attachment 1 – Specification 01 01 00 General Conditions rev August 3, 2023.

4.0 KEY PERSONNEL

Name Phone E-Mail Address Contracting Officer (CO) TBD TBD TBD

Contracting Officer’s Representative (COR)

Chris Morris 301-504-3447 christopherg.morris@usda.gov

Research Leader (RL) Dr. Carrie Laboski 814-865-3184 carrie.laboski@usda.gov

Administrative Officer (AO) Kenneth Crabtree 814-863-0929 kenneth.crabtree@usda.gov

Location Monitor (LM) Scott Spear 814-863-1680 scott.spear@usda.gov

4.1 WORKING HOURS

Normal work hours are from 7:30 a.m. to 4:00 p.m., Monday through Friday, excluding Federal holidays.

4.2 INSPECTIONS

The Contractor shall notify the Contracting Officer that they are ready for a substantial completion inspection ten (10) days before the end of the contract period. The Contractor shall submit a written request to the Contracting Officer for a final inspection in writing at least seven (7) days prior to completion of the project.

4.3 SAFETY

USDA ARS PSWMRU is an OSHA compliant facility for all staff and contractors working at the location. This compliance requires that all work is conducted in a safe manner, hazardous conditions are recognized and reported, and the contractor is complying with mailto:christopherg.morris@usda.gov mailto:carrie.laboski@usda.gov mailto:kenneth.crabtree@usda.gov mailto:scott.spear@usda.gov local, state, federal and installation regulations, and laws. Contractor safety and security efforts must guarantee all work is alignment with USDA ARS and OSHA regulations and requirements.

4.3.1 Contractor personnel must adhere to all location safety and security requirements when entering, exiting work areas and when working at the facility the requirement extends to obtaining any required excavation, entrenchment, and hot work permits.

4.3.2 Access to the site by the Contractor shall be coordinated with the Location Monitor (LM). Further, contractor shall:

a. Perform OSHA mandated safety training for all employees contracted to work at the ACSL location prior to the start of work.

b. Obtain and use USDA identification cards always when present at the worksite.

c. Coordinate additional required measures with the Location Monitor (LM).

4.4 HOUSEKEEPING

The Contractor shall remove and dispose of dirt and debris and keep the premises clean at all times during construction. This shall be done as frequently as needed but not less than once a week.

4.5 SITE ENTRY

4.5.1 The foreman or superintendent must sign in all workers at the Location office daily and before work starts.

4.5.2 Government engineers and contracting personnel shall be allowed access to the site at all times. Others may visit the site with permission of the Contracting Officer. The Contracting Officer shall be informed of all suspected unauthorized visitors.

4.6 SITE VISIT

A site visit is highly recommended for potential bidders but is not mandatory.

END