AR168.pdf

PDF 12 KB Posted

Attached to
85C Roof Replacement Federal contract opportunity
Solicitation number
12-223-SOL-00003
Issued by
Department of Health and Human Services Food and Drug Administration

About this file

Attachment 2 Wage Decision AR100168

View the file

Other files for this federal contract opportunity

Other files attached to 85C Roof Replacement, newest first.
File Type Posted
amendment 2.pdf PDF
amendment 1.pdf PDF
security card access request.pdf PDF
drawings and specs.pdf PDF
12-223-SOL-00003.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: AR100168 07/01/2011 AR168

Superseded General Decision Number: AR20080168

State: Arkansas

Construction Type: Building Building Construction

County: Jefferson County in Arkansas.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date 0 03/12/2010 1 05/21/2010 2 06/04/2010 3 07/30/2010 4 08/27/2010 5 01/21/2011 6 07/01/2011

* BOIL0069-001 01/01/2011

Rates Fringes

BOILERMAKER......................$ 25.73 16.12

* IRON0321-001 05/01/2010

Rates Fringes

IRONWORKER, REINFORCING,

ORNAMENTAL AND STRUCTURAL........$ 18.25 12.89

PLUM0155-001 01/01/2011

Rates Fringes

PLUMBER/PIPEFITTER (excluding HVAC pipe installation)..........$ 23.23 8.31

ROOF0020-018 01/01/2008

Rates Fringes

ROOFER...........................$ 14.50 .20

* SHEE0036-014 06/01/2010

Rates Fringes

SHEET METAL WORKER, Excludes Installation of HVAC Duct........$ 21.66 11.33

* SUAR2008-122 11/20/2008

Rates Fringes

8/22/2011http://www.wdol.gov/wdol/scafiles/davisbacon/AR168.dvb

ASBESTOS WORKER/MECHANICAL

INSULATOR........................$ 18.67 0.00

BRICKLAYER.......................$ 19.11 0.00

CARPENTER, Includes Acoustical Ceiling Installation, Drywall Hanging, Form Work, and Metal Stud Installation................$ 15.27 1.35

CEMENT MASON/CONCRETE FINISHER...$ 14.46 0.00

DRYWALL FINISHER/TAPER...........$ 14.71 0.00

ELECTRICIAN......................$ 20.00 5.50

LABORER: Common or General......$ 9.25 0.00

LABORER: Landscape..............$ 9.36 0.00

LABORER: Mason Tender - Brick...$ 10.29 0.00

LABORER: Mason Tender - Cement/Concrete..................$ 11.72 0.00

LABORER: Pipelayer..............$ 11.77 1.48

OPERATOR: Asphalt Paver.........$ 15.02 0.00

OPERATOR: Asphalt Roller........$ 12.03 1.83

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 19.70 6.20

OPERATOR: Blade/Grader..........$ 16.50 0.00

OPERATOR: Bulldozer.............$ 14.56 0.00

OPERATOR: Crane.................$ 16.19 0.00

OPERATOR: Forklift..............$ 13.00 0.00

OPERATOR: Roller (Dirt and Grade Compaction)................$ 10.88 0.00

OPERATOR: Screed................$ 11.75 2.08

OPERATOR: Front End Loader.......$ 13.73 1.98

PAINTER: Brush, Roller and Spray, Excludes Drywall Finishing/Taping.................$ 12.65 0.00

PIPEFITTER (HVAC Pipe Installation Only)...............$ 19.10 4.10

SHEET METAL WORKER

(Installation of HVAC Duct

Only)............................$ 14.26 0.00

TILE SETTER......................$ 17.00 0.00

TRUCK DRIVER: Dump Truck........$ 9.88 0.00

TEAM0878-001 11/01/2007

Rates Fringes

TRUCK DRIVER: Flatbed Truck.....$ 20.00 6.48

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in he matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and

3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .