Amendment5.pdf
PDF 545 KB Posted
- Attached to
- BPAS Seed Freezer Replacement Federal contract opportunity
- Solicitation number
- 1204T020R0001
About this file
This document includes an amendment to a solicitation for the BPAS Seed Freezer Replacement project. Key details include:
-
The project requires demolition of mechanical equipment for one existing seed freezer and three tree coolers at the Bend Seed Extractory facility, and supply and installation of all new equipment.
-
Work will be completed at the Bend Pine Administrative Site and Seed Extractory and Tree Cooler buildings.
-
The government's cost estimate is between $250,000 and $500,000. Performance and payment bonds of 100% will be required.
-
The start date is estimated for December 11, 2019 and all work must be completed by April 1, 2020.
-
The amendment provides responses to contractor questions that clarify equipment requirements and specifications.
-
Modifications based on the answers amend the solicitation's Sections B and C.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment5CompleteSolicitation.pdf | ||
| Amendment4.pdf | ||
| Amendment3.pdf | ||
| Amendment2.pdf | ||
| Seed_Extractory_Control_Drawings-2.pdf | ||
| Amendment1.pdf | ||
| Seed_Extractory_Building_Drawings-2.pdf | ||
| Coolers_Arch-Elec-Mech_Drawings.pdf | ||
| SF24-BidBond.pdf | ||
| Seed_Extractory_Control_Drawings.pdf | ||
| NewCompleteSolicitation.pdf | ||
| Seed_Extractory_Building_Drawings.pdf | ||
| Coolers-Control_Dwgs.pdf | ||
| BSE_Seed_Freezer_Drawings.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1204T020R0001 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
04T0
CORVALLIS OR 97331
3200 SW JEFFERSON WAY
SIUSLAW NATIONAL FOREST
USDA FOREST SERVICE
01/07/20200005
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
10/23/2019
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See attached.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
DARCY J. RAPOZA
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
7 Jan 2020
1. The attached RFI’s and corresponding answers are hereby provided to all contractors.
2. In accordance with these answers, corresponding portions of Sections B and C of the solicitation are amended as indicated in the attachment “Amendment5CompleteSolicitation”. Changes to the document are in red.
RFI-001 - What is the load on the C D coolers. Seedlings create a lot of load to the units. Do you know how many will be entering the coolers? And how long they will be in the coolers? Also are the coolers running all year round? If not what months are they running? It will make a difference in load if they are not running during the summer months. Each cooler can hold between 250,000 and 300,000 seedlings at full capacity. All floor space would be covered up to a height of 10-12 feet.
They typically use the coolers for seedlings in March-May. The rest of the year there would not be that loading.
RFI-002 - Also the contract is stating that we are to use 1 condensing unit and 6 evap coils for the C and D coolers. The manufacturer doesn't recommend more than 3 coils per outside unit. The existing was 2 units and 6 coils. 3 per unit, with redundant units. The solicitation was stating that there are 6 evaporators existing (or were), but they do not need to be replaced with that number.
They can be resized for the new condensing units to install as few evaporators as necessary.
RFI-003 - The seed freezer units are requesting intelligen units, these units do not allow for alternating the compressors. They also do not allow for the indicator lights and reset controls in a main panel. We were hoping to do a standard system and allow for the requested additions on the panel. Will this work? Yes that will work. Utilize standard controls by modifying the existing panel to accommodate the new equipment.
RFI-004 - The documents are calling for 2 units for the freezer. It does not say if the units are to be redundant. The existing units are redundant. Both are big enough to run the freezer by themselves. Does is need to be redundant, having them both be large enough to run the freezer alone? The seed freezer does need to remain redundant with 2 units. The freezer is used year round and is high priority so the redundancy needs to be maintained.
RFI-005 - The C and D coolers were also redundant originally. The bid calls for one unit for each, which means it would not be redundant. Is this correct? Correct, the coolers will not need to be redundant in the rebuild.
RFI-006 - Did you settle on the location of the Strat cooler condensing unit to be placed on the back side in the breezeway? The breezeway can not be obstructed. The unit for the strat cooler can fit in between the doors in back of coolers C & D, and the condensing units for C & D can be parallel to the back of the building at each corner. See attached diagram.
RFI-007 - Are we able to run the drains for the new freezer outside on the ground? Yes
RFI-008 - Are there any hard requirements other than what the documents list that detail what they would like to see as far as controls modification. Modify the existing panels and simplify as much as possible to still include the requirements detailed in Section B and C of the solicitation.
RFI-009 - It is permissible to shut down the seed freezer fire suppression during the work day? Provide fire watch? Yes that is permissible to shut the fire suppression system down with monitoring.
RFI-010 - Tree Cooler Humidity? There are existing controls, sensors, valves and air compressor. Can we or should we utilize this equipment for humidity control? General operating humidity range. ?
60% to 80% ? Yes, as stated in solicitation use the existing equipment where feasible. Use 60 to 80% for humidity range.
RFI-011 – Seed Freezer Temperature During Construction. The solicitation states in Section B-2, 2.b.
“the contractor is responsible for maintaining the seed freezer between a temperature of 10 to 25F for the entire duration of construction.” Is the contractor still responsible for maintaining temperature if the existing system equipment fails during construction/install of new system? If so this would involve rental of temporary storage and moving seed freezer contents to guarantee a safe temperature. No. The contractor responsibility for maintaining the seed freezer in the operating range during construction does not apply in the event of system failure, UNLESS the system failure is due to contractor negligence during construction. If additional steps are needed to keep the seed freezer contents safe in the event of system failure (temporary storage, equipment repair), the service would be completed by the Government separate from the contract OR a contract modification would need to be negotiated for the contractor to provide temporary storage and moving of seed freezer contents.
RFI-012 – For tree coolers C & D, is it permissible to place new outdoor units on the roof (at the location of the existing condensing units), provided the new units are lower weight than existing?
Yes, this would be permissible if the new units do not exceed the weight of the existing, in accordance with building and structural codes. If the new units exceed the existing units’ weight, this would not be permissible and new units would be placed on the ground as stated in the solicitation.
jbelt Rectangle jbelt Rectangle jbelt Rectangle jbelt Callout Cooler D condensing unit jbelt Callout Cooler C condensing unit jbelt Callout Strat cooler condensing unit
| 2020-01-07T17:22:14-0800 | |
| DARCY RAPOZA |
File details come from the government source that posted it. Updated .