QA_with_drawings.pdf
PDF 835 KB Posted
- Attached to
- Sitka Janitorial Federal contract opportunity
- Solicitation number
- 12010918Q0045
About this file
Questions & Answers with building drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12010918Q0045_amend2.pdf | ||
| QA_2.pdf | ||
| 12010918Q0045_amend1.pdf | ||
| 12010918Q0045_RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12010918Q0045 Sitka Janitorial Services
Questions & Answers
Q1. What is the square footage of the Sitka Ranger District Office Warehouse Restroom?
A1. 40 SF
Q2. What is the square footage of the Geodetic Bunkhouse?
A2. 3,168 SF
Q3. What is the square footage of carpeted areas in the Sitka Ranger District Office and the
Geodetic bunkhouse?
A3. The Sitka Ranger District Office carpeted area is approximately 11,000 SF and the
Geodetic bunkhouse has approximately 2,700 SF of carpeted areas.
Q4. How many perimeter exterior windows does the Sitka Ranger District Office have? Does annual window cleaning exterior include second story windows?
A4. 40 windows (20 on each of 2 floors). There are 5 exterior doors with full glass lights.
There is glass storefront that is approximately equal in size to 10 windows. Yes, the second story windows are to be cleaned.
Q5. In addition to the interior of perimeter windows, will contractor be cleaning additional interior glass as part of the Semi-Annual Interior Window Clean? If yes, how many windows and/or panes of glass are there inside the Sitka Ranger District Office (not including perimeter windows)?
A5. Cleaning interior glass is included in the semi-annual requirement. There are 8 glass panels that are approximately 30 SF each, and 4 glass panels that are approximately 4 SF each. There are 6 interior doors with glass panels that are approximately 6 SF each. The interior vestibule door has approximately 10 SF of glass.
Q6. How many upholstered chairs will need to be cleaned in the Sitka Ranger District Office?
A6. There are approximately 145 upholstered chairs that will need to be cleaned.
Approximately 40 are occupied on a daily basis by employees. The remaining 105 are for conference rooms and visitors (occupied much less frequently).
Q7. Is the government providing consumables.
A7. There is a requirement in the Statement of Work to provide stock for the restrooms.
Q8. When it states to clean the refrigerators does that mean you want them taken apart and simply wipe down the inside and outside of them? Reference Section 1.4.10.
A8. The Forest Service will empty food items. The contractor will clean and disinfect the interior and exterior of the refrigerator and freezer, including cleaning all spills and food residue from the sides and the shelves and drawers.
Q9. Regarding carpet cleaning in the bunk houses; do you want it spot cleaned or are you wanting the entire carpet professionally cleaned with a machine?
A9. Spot clean or shampoo dirty carpets over an area of 2 SF or less as stated in the statement of work.
12010918Q0045 Sitka Janitorial Services
Q10. Can we get a layout drawing of these buildings?
A10. See attachments. The Cascade Creek Bunkhouse mud room was constructed.
Q11. How may a site visit be arranged?
A11. You may contact Logan Wild for a site visit only at 907-747-4349 or lwild02@fs.fed.us.
All questions need to be directed to Stacy Doutt 907-586-7906 or sdoutt@fs.fed.us.
mailto:lwild02@fs.fed.us
R E
F
BARN DOOR
WS 6(B)
WS 5
WS 1
WS 7
WS 8
WS 9
WS 10WS 12
WS 11(B)
WS 14
WS 13(B)
WS 2
LG CONFERENCE RMLG CONFERENCE RMLG CONFERENCE RMLG CONFERENCE RM
109109109109
SM CONFERENCESM CONFERENCESM CONFERENCESM CONFERENCE
110110110110
STOR.STOR.STOR.STOR.
112112112112
STORSTORSTORSTOR
111111111111
KITCHENKITCHENKITCHENKITCHEN
120120120120
MENMENMENMEN
114114114114
WOMENWOMENWOMENWOMEN
115115115115
HALLHALLHALLHALL
121121121121
RECEPTIONRECEPTIONRECEPTIONRECEPTION
101101101101
LEO OFFICELEO OFFICELEO OFFICELEO OFFICE
103A103A103A103A
OFFICEOFFICEOFFICEOFFICE
124124124124
WS 3
WS 4(B)
QUIETQUIETQUIETQUIET
116116116116
JANJANJANJAN
113113113113
SUPPLYSUPPLYSUPPLYSUPPLY
118118118118
MUD ROOMMUD ROOMMUD ROOMMUD ROOM
122122122122
RANGERRANGERRANGERRANGER
104104104104
D
IS
P
LA
Y
ENTRY VEST.ENTRY VEST.ENTRY VEST.ENTRY VEST.
100100100100
DISPLAYDISPLAYDISPLAYDISPLAY
102102102102
OFFICEOFFICEOFFICEOFFICE
125125125125
W S
W S
OPEN OFFICEOPEN OFFICEOPEN OFFICEOPEN OFFICE
123123123123
TELECOMTELECOMTELECOMTELECOM
126126126126V E N
D
IN
G
U P
SPRINKLERSPRINKLERSPRINKLERSPRINKLER
108108108108
STAIR 2STAIR 2STAIR 2STAIR 2
127127127127
HALLHALLHALLHALL
107107107107
ELEVELEVELEVELEV
117117117117
BOILERBOILERBOILERBOILER
129129129129
STORAGESTORAGESTORAGESTORAGE
103B103B103B103B
MAILMAILMAILMAIL
105105105105
NEW
CPT-1
CPT-2
R E S
-1
RES-1 RES-1
CPT-2
CPT-1 CPT-2
RES-1
C P T -2
C P T -2
CPT-1
FLOOR MAT AND
RECESSED
FRAME
C P T -1
RES-1CPT-2
CPT-2
CPT-2
CPT-2CPT-1
C P T -2
CPT-2RES-1
WD-3
13 18
CPT-2
CG
CG
C G
C G
C G
CG
C P T -2
P-4
P-2
P-2 P-4
P -4
P -2
P -2
RES-2&3
CG-1
CG
P -4
P -4
CPT-1
STAIRSTAIRSTAIRSTAIR
106106106106
B-2
B-1
B-2
ELECTELECTELECTELECT
119119119119
OPEN TO BELOW
ELEVATOR
DN
WS 2 WS 3 WS 4 WS 5
WS 8
WS 7WS 6
WS 12
WS 11
WS 10
WS 9
WS 21(B)
WS 20
WS 18(B)
WS 17(B)
WS 16
WS 15
WS 14(B)
WS 13
WS 25
WS 24
WS 23
WS 22
WS 26
WS 27
WS 28
QUIETQUIETQUIETQUIET
201201201201
MENMENMENMEN
208208208208
WOMENWOMENWOMENWOMEN
209209209209
WORK AREA WORK AREA
OFFICEOFFICEOFFICEOFFICE
202202202202
SM MTG.SM MTG.SM MTG.SM MTG.
210210210210
OFFICEOFFICEOFFICEOFFICE
212212212212DISPATCHDISPATCHDISPATCHDISPATCH
200200200200
WS 1
WS 19
STORSTORSTORSTOR
204204204204
HALLWAYHALLWAYHALLWAYHALLWAY
206206206206
OPEN OFFICEOPEN OFFICEOPEN OFFICEOPEN OFFICE
205205205205
OPEN OFFICEOPEN OFFICEOPEN OFFICEOPEN OFFICE
211211211211
CPT-2
C P T -2
RES-1
RES-1
C P T -2
RES-2&3
C P T -2
W D
-3
14 19
1 3
NUMBERED ITEMS DESIGNATE GFGI EQUIPMENT
WORKSTATION AND FURNITURE GFGI
CG
C G
CG CG
CG
TV
C G
C G
C G
P-2
P -4
P -4
P -4
P -2
CG
P -2
CG
1. WORKSTATION AND FURNITURE LAYOUT SHOWN IS SCHEMATIC. FURNITURE SELECTION AND
LAYOUT DESIGN IS NIC. FURNITURE IS GOVERNMENT FURNISHED AND INSTALLED.
2. SEE FINISH PLANS FOR FLOOR FINISH LOCATIONS.
LEGEND
CORNER GUARDCG
8'-10"
SCHEMATIC
WORKSTATION A
(TYP. U.N.O.)
SCHEMATIC
WORKSTATION B
10'-6"
75SF
75SF
A
D E P A
R TM EN O FT GR ICU
LT
U R E
A
D E P A
R TM EN O FT GR ICU
LT
U R E
275 Fifth Street Suite 100
Bremerton, WA 98337
(360) 377-8773
Fax 792-1385 info@rfmarch.com
RFM Project Number:
SHEET:
TONGASSTONGASSTONGASSTONGASS
ENGINEERING & RECREATIONENGINEERING & RECREATIONENGINEERING & RECREATIONENGINEERING & RECREATION
SEAL
DESIGNED:
DRAWN:
REVIEWED:
DRAWING INFORMATIONDRAWING INFORMATIONDRAWING INFORMATIONDRAWING INFORMATION
REFERENCESREFERENCESREFERENCESREFERENCES
CONSTRUCTION DOCUMENTSMT
JB
JULY 7, 2014
GBSA
KAT
T
S A
FE O LA
Reg i s t e r ed P r o f e s s i o n a l A r ch i t e c t
DAVID A. FERGUS
A-13860
49 TH
C U se rs
\m w ri g ht \D e sk to p \R
E V
IT
L
O C
A L
F
IL
E S
\A R
C H
IV
E \2
S it ka
A d m in is tr at io n O ff ic e
M
W
LO
C A
L.
rv t C
U se rs
\m w ri g ht \D e sk to p \R
E V
IT
L
O C
A L
F
IL
E S
\A R
C H
IV
E \2
S it ka
A d m in is tr at io n O ff ic e
M
W
LO
C A
L.
rv t C
U se rs
\m w ri g ht \D e sk to p \R
E V
IT
L
O C
A L
F
IL
E S
\A R
C H
IV
E \2
S it ka
A d m in is tr at io n O ff ic e
M
W
LO
C A
L.
rv t C
U se rs
\m w ri g ht \D e sk to p \R
E V
IT
L
O C
A L
F
IL
E S
\A R
C H
IV
E \2
S it ka
A d m in is tr at io n O ff ic e
M
W
LO
C A
L.
rv t
/1
/2
:3
:1
P
M
/1
/2
:3
:1
P
M
/1
/2
:3
:1
P
M
/1
/2
:3
:1
P
M
2012232
CONSTRUCTION DOCUMENTS
A72.1A72.1A72.1A72.1
OFFICE - INTERIOR FINISH PLANS & EQUIPMENT
PLANS
CO-LOCATED SITKA OFFICE RENOVATIONCO-LOCATED SITKA OFFICE RENOVATIONCO-LOCATED SITKA OFFICE RENOVATIONCO-LOCATED SITKA OFFICE RENOVATION
204 SIGINAKA WAY
SITKA, AK 99835
USDA FOREST SERVICE - TONGASS NATIONAL FORESTUSDA FOREST SERVICE - TONGASS NATIONAL FORESTUSDA FOREST SERVICE - TONGASS NATIONAL FORESTUSDA FOREST SERVICE - TONGASS NATIONAL FOREST
1/8" = 1'-0"
OFFICE - FIRST FLOOR INTERIOR FINISH/ SCHEMATIC FURNITURE PLAN
1/8" = 1'-0"
OFFICE - SECOND FLOOR INTERIOR FINISH/ SCHEMATIC FURNITURE PLAN
FINISH PLAN NOTES:
N O R T H 0' 4' 8' 16'
0' 4' 8' 16'
GFGI SCHEMATIC EQUIPMENT KEY
FOR REFERENCE ONLY
REVISION SCHEDULE
DATE: REVISION: BY:
mljohnson02 Typewritten Text XXXXXXXXXXXXXXXXXXXXXXXXXX A07 Furniture selection and layout design is to be awarded as an Option XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Item. After award of the Option Item, furniture is Contractor Furnished and Installed.
mljohnson02 Typewritten Text mljohnson02 Typewritten Text mljohnson02 Typewritten Text mljohnson02 Typewritten Text mljohnson02 Typewritten Text
File details come from the government source that posted it.