12.f.1a_Specifications.pdf

PDF 2 MB Posted

Attached to
HOBART DISHWASHER Federal contract opportunity
Solicitation number
60100PR240000169
Issued by
Department of Homeland Security US Coast Guard

About this file

This solicitation requests quotes for a Hobart dishwasher to be installed at the United States Coast Guard Academy in New London, Connecticut. Quotes are due by March 1, 2023 and must include confirmation that the vendor visited the site. The government intends to award a firm-fixed-price contract to the responsible offeror providing the lowest priced, technically acceptable quote meeting the specifications. The solicitation provides the model number, quantity, and specifications for a Hobart FT1000E dishwasher in the academy's galley. Installation, including assembly, removal of the existing unit, and connection of the new unit, must be included in quoted pricing. The Department of Homeland Security's United States Coast Guard issued the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to HOBART DISHWASHER, newest first.
File Type Posted
12f__Provisions and Clauses_FAC 2024-02.pdf PDF
3.c_Statement of Work (SOW) DISHMACHINE (1).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FT1000e Site Survey/Quote Checklist Customer Name

Location (City, State)

Completed By Date

JOB TYPE New Construction Replacement Existing Make/Model/Serial Number

FT1000e MODEL SELECTION (w/PowerRinse) FT1000Se MODEL SELECTION (No PowerRinse) Standard 8' Center Section Short 5' Center Section FT1000e BAS (Base) FT1000Se BAS (Base) FT1000e EGR (Energy Recovery) FT1000Se EGR (Energy Recovery) FT1000e ADV (Advansys)

Load Section (Load and Unload Section Lengths are Approximate and can vary +/- 1") Unload Section 5.7' (2.7' Load Platform + 3' Prewash Section) - Available on BAS & EGR Models Only 5'6" (N/A if Blower Dryer selected) 6.7' (3.7' Load Platform + 3' Prewash Section) - Available on BAS & EGR Models Only 7'5" 7.7' (4.7' Load Platform + 3' Prewash Section) - Available on BAS & EGR Models Only 9' 7.7' (2.7' Load Platform + 2' ASR Section + 3' Prewash Section) 11' 8.7' (3.7' Load Platform + 2' ASR Section + 3' Prewash Section) Other 9.7' (4.7' Load Platform + 2' ASR Section + 3' Prewash Section) Other

SPLIT SECTIONS (for Delivery) Load Center Unload (Split at Prewash & ASR Section) (Full Length Only - Split at Wash & Rinse Section) (Varies depending on unload length selected)

VOLTAGE 208/60/3 240/60/3 380/60/3 480/60/3 600/60/3

(Note: ADV not available in 50 hz) 200/50/3 380/50/3 415/50/3 Other

HEIGHT DIRECTION OF OPERATION

Standard (22" Opening) Right to Left 6" Higher than Standard (28" Opening) Left to Right

TANK HEAT FLOWING STEAM PRESSURE

Electric 13 - 45 psi Steam Coils 12 psi & Below (Consult Factory)

DRAIN LOCATION BOOSTER HEATER

Load Internal Electric (Required for ADV) Unload (Default) Internal Steam (120#) External / Customer Supplied (BAS/EGR* Only, Not available for ADV)

CIRCUIT BREAKERS

Yes, Dual Point (2) Electrical Connections for Electric Tank Heat machines Yes, Single Point (1) Electrical Connection for all Steam Tank Heat machines or 480v & 600v Electric Tank Heat machines No, Five (5) Service Connections for all Electric Tank Heat machines No, Single Point (1) Electrical Connections for all Steam Tank Heat machines

CONVEYOR TYPE

Standard Polypropylene Stainless Steel* Cross Rods every 4th row Type A Polypropylene Stainless Steel* Cross Rods every 4th row Position 1 Polypropylene Stainless Steel* Cross Rods every 3rd row Position 2 Polypropylene Stainless Steel* Cross Rods every 3rd row Tivoli w/Cross Rods every 3rd row Polypropylene Stainless Steel* To Be Determined Ware Type/Make/Model

*SEF (Specially Engineered Feature) – will result in additional cost and lead time.

SECURITY PACKAGES

Standard Security (Lockable Control Box, Locking Doors, Lockable Control Cover, Hook Mounted Curtains, Lockable ASR Basket, Tamper Proof Screws) Medium Security Package (Standard Security + Lockable Enclosure Panels) Maximum Security Package (Medium Security + Undergrid) None

OTHER OPTIONS ACCESSORIES

Add ASR* (to BASE Machine) WS-80 Water Softener Add Auto Clean* (to BASE Machine) Flanged Feet Add Auto Delime* (to BASE Machine) Water Hammer Arrestor Kit Remove ASR (from EGR Machine, Must Include Drain to Unload) Drain Water Tempering Kit Blower Dryer (requires minimum 7'5" Unload Section) With Hobart Service Installation Split, Vertical Doors Without Hobart Service Installation Casino Package* 1" Steam Piping

DELIVERY NOTES WARRANTY OPTIONS

Minimum Delivery Path Door Width Standard Warranty (M-F, 8-5 Coverage) Delivery Path Door Height Hobart Care Unlimited (Extended Warranty) Ceiling Height Hobart Assurance Unlimited Loading Dock Yes No Hobart Prosurance (24/7 Coverage) Cold Water Available (Required for EGR/ADV Models) Yes No Preventative Maintenance Qty:

Floor Sink/Drain Available Yes No

ADDITIONAL COMMENTS

*SEF (Specially Engineered Feature) – will result in additional cost and lead time.

DISHMACHINE LENGTH QUICK REFERENCE GUIDE

Space Available for Dishmachine Model

LOAD SECTION CENTER SECTION UNLOAD SECTION

Blower Dryer

Automatic Soil Removal

(ASR)

*Total Length (including overhang)

Load Platform, 3' Prewash & 2' ASR

(if equipped)

3' Wash Tank, 3' Rinse Tank (if equipped)

& 2' Dual Rinse

Control Box, Blower Dryer (if equipped) & Unload Platform

18' Available FT1000Se-BAS 5'7" 5' 5'6" No No 17'6"

19' Available FT1000Se-BAS FT1000Se-EGR (ASR removed)

6'7" 6'7"

5' 5'

5'6" 5'6"

No No

No No

18'6" 18'6"

20' Available FT1000Se-BAS BD FT1000Se-EGR FT1000Se-EGR BD (ASR removed)

5'7" 7'7" 5'7"

5' 5' 5'

7'5" 5'6" 7'5"

Yes No Yes

No Yes No

19'6" 19'6" 19'6"

21' Available FT1000Se-EGR BD (ASR removed) FT1000e-BAS FT1000e-EGR (ASR removed)

6'7" 5'7" 5'7"

5' 8' 8'

7'5" 5'6" 5'6"

Yes No No

No No No

20'6" 20'6" 20'6"

22' Available FT1000Se-BAS BD FT1000Se-EGR BD

5'7" 7'7"

5' 5'

9' 7'5"

Yes Yes

No Yes

21'1" 21'6"

23' Available FT1000Se-EGR BD FT1000e-BAS BD FT1000e-EGR FT1000e-EGR BD (ASR removed)

8'7" 5'7" 7'7" 5'7"

5' 8' 8' 8'

7'5" 7'5" 5'6" 7'5"

Yes Yes No Yes

Yes No Yes No

22'7" 22'6" 22'6" 22'6"

24' Available FT1000Se-EGR BD FT1000e-BAS BD FT1000e-EGR

7'7" 6'7" 8'7"

5' 8' 8'

9' 7'5" 5'6"

Yes Yes No

Yes No Yes

23'1" 23'6" 23'7"

25' Available FT1000e-BAS BD FT1000e-EGR BD FT1000e-ADV

5'7" 7'7" 7'7"

8' 8' 8'

9' 7'5" 7'5"

Yes Yes Yes

No Yes Yes

24'1" 24'6" 24'6"

26' Available FT1000e-BAS BD FT1000e-EGR BD

6'7" 8'7"

8' 8'

9' 7'5"

Yes Yes

No Yes

25'1" 25'7"

27' Available FT1000e-BAS BD FT1000e-EGR BD FT1000e-EGR BD (ASR removed) FT1000e-ADV

5'7" 7'7" 5'7" 7'7"

8' 8' 8' 8'

11' 9'

11' 9'

Yes Yes Yes Yes

No Yes No Yes

26'1" 26'1" 26'1" 26'1"

28' Available FT1000e-EGR BD FT1000e-ADV

8'7" 8'7"

8' 8'

9' 9'

Yes Yes

Yes Yes

27'2" 27'2"

* Total length and section lengths are approximates and can vary +/- 2".

HB2664 (05-21)

Completed By:
Date:
Customer Name: US Coast Guard Academy
Customer Location: New London, CT 06320
Job Type: Choice2
Existing MakeModel: Hobart FT900 271181689
Model Selection: Choice1
Load Section: Choice4
Unload Section: Choice2
Other - Load Section:
Voltage: Choice1
Other - Unload Section:
Height: Choice1
Direction of Operation: Choice1
Tank Heat: Choice2
Flowing Steam Pressure: Choice1
Drain Location: Choice1
Booster Heater: Choice2
Circuit Breakers: Choice4
Conveyor Type: Choice2
Other - Voltage:
Ware Type/Make/Model:
Correctional Package: Choice3
Auto Clean: Choice2
Blower Dryer: Choice3
Split, Vertical Doors: Off
Auto Delime: Choice3
Water Softener: Off
Remove ASR: Off
Add ASR: Choice1
Casino Package: Off
1" Steam Piping: Off
Flanged Feet: Off
DWTK - With or Without Hobart Service: Choice 1
Drain Water Tempering Kit: Choice 1
Water Hammer Arrestor Kit: Off
Minimum Delivery Path Door Width: 54
Ceiling Height: 86
Loading Dock: Choice1
Cold Water Available: Choice1
Delivery Path Door Height: 82
Floor Sink/Drain Available: Choice1
Warranty Options: Choice1
Preventive Maintenance Qty:
Clear Button:
Additional Comments: FT1000E-CBR0NO Without Circuit Breaker, FT1000E-DORHNG Hinge doors, all sections, FT1000E-ROD0NO Without Cross Rods

• Removal and disposal of existing equipment • Uncrating and set-in place in existing location • Validation equipment is working properly upon completion of installation

• Removal of packaging materials and rubbish

Split Sections - Load: Choice1
Split Sections - Center: Choice1
Split Sections - Unload: Choice1
Polypropylene or Stainless Steel: Off
Cross Rods: Off

File details come from the government source that posted it. Updated .