12.f.1a_Specifications.pdf
PDF 2 MB Posted
- Attached to
- HOBART DISHWASHER Federal contract opportunity
- Solicitation number
- 60100PR240000169
About this file
This solicitation requests quotes for a Hobart dishwasher to be installed at the United States Coast Guard Academy in New London, Connecticut. Quotes are due by March 1, 2023 and must include confirmation that the vendor visited the site. The government intends to award a firm-fixed-price contract to the responsible offeror providing the lowest priced, technically acceptable quote meeting the specifications. The solicitation provides the model number, quantity, and specifications for a Hobart FT1000E dishwasher in the academy's galley. Installation, including assembly, removal of the existing unit, and connection of the new unit, must be included in quoted pricing. The Department of Homeland Security's United States Coast Guard issued the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12f__Provisions and Clauses_FAC 2024-02.pdf | ||
| 3.c_Statement of Work (SOW) DISHMACHINE (1).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FT1000e Site Survey/Quote Checklist Customer Name
Location (City, State)
Completed By Date
JOB TYPE New Construction Replacement Existing Make/Model/Serial Number
FT1000e MODEL SELECTION (w/PowerRinse) FT1000Se MODEL SELECTION (No PowerRinse) Standard 8' Center Section Short 5' Center Section FT1000e BAS (Base) FT1000Se BAS (Base) FT1000e EGR (Energy Recovery) FT1000Se EGR (Energy Recovery) FT1000e ADV (Advansys)
Load Section (Load and Unload Section Lengths are Approximate and can vary +/- 1") Unload Section 5.7' (2.7' Load Platform + 3' Prewash Section) - Available on BAS & EGR Models Only 5'6" (N/A if Blower Dryer selected) 6.7' (3.7' Load Platform + 3' Prewash Section) - Available on BAS & EGR Models Only 7'5" 7.7' (4.7' Load Platform + 3' Prewash Section) - Available on BAS & EGR Models Only 9' 7.7' (2.7' Load Platform + 2' ASR Section + 3' Prewash Section) 11' 8.7' (3.7' Load Platform + 2' ASR Section + 3' Prewash Section) Other 9.7' (4.7' Load Platform + 2' ASR Section + 3' Prewash Section) Other
SPLIT SECTIONS (for Delivery) Load Center Unload (Split at Prewash & ASR Section) (Full Length Only - Split at Wash & Rinse Section) (Varies depending on unload length selected)
VOLTAGE 208/60/3 240/60/3 380/60/3 480/60/3 600/60/3
(Note: ADV not available in 50 hz) 200/50/3 380/50/3 415/50/3 Other
HEIGHT DIRECTION OF OPERATION
Standard (22" Opening) Right to Left 6" Higher than Standard (28" Opening) Left to Right
TANK HEAT FLOWING STEAM PRESSURE
Electric 13 - 45 psi Steam Coils 12 psi & Below (Consult Factory)
DRAIN LOCATION BOOSTER HEATER
Load Internal Electric (Required for ADV) Unload (Default) Internal Steam (120#) External / Customer Supplied (BAS/EGR* Only, Not available for ADV)
CIRCUIT BREAKERS
Yes, Dual Point (2) Electrical Connections for Electric Tank Heat machines Yes, Single Point (1) Electrical Connection for all Steam Tank Heat machines or 480v & 600v Electric Tank Heat machines No, Five (5) Service Connections for all Electric Tank Heat machines No, Single Point (1) Electrical Connections for all Steam Tank Heat machines
CONVEYOR TYPE
Standard Polypropylene Stainless Steel* Cross Rods every 4th row Type A Polypropylene Stainless Steel* Cross Rods every 4th row Position 1 Polypropylene Stainless Steel* Cross Rods every 3rd row Position 2 Polypropylene Stainless Steel* Cross Rods every 3rd row Tivoli w/Cross Rods every 3rd row Polypropylene Stainless Steel* To Be Determined Ware Type/Make/Model
*SEF (Specially Engineered Feature) – will result in additional cost and lead time.
SECURITY PACKAGES
Standard Security (Lockable Control Box, Locking Doors, Lockable Control Cover, Hook Mounted Curtains, Lockable ASR Basket, Tamper Proof Screws) Medium Security Package (Standard Security + Lockable Enclosure Panels) Maximum Security Package (Medium Security + Undergrid) None
OTHER OPTIONS ACCESSORIES
Add ASR* (to BASE Machine) WS-80 Water Softener Add Auto Clean* (to BASE Machine) Flanged Feet Add Auto Delime* (to BASE Machine) Water Hammer Arrestor Kit Remove ASR (from EGR Machine, Must Include Drain to Unload) Drain Water Tempering Kit Blower Dryer (requires minimum 7'5" Unload Section) With Hobart Service Installation Split, Vertical Doors Without Hobart Service Installation Casino Package* 1" Steam Piping
DELIVERY NOTES WARRANTY OPTIONS
Minimum Delivery Path Door Width Standard Warranty (M-F, 8-5 Coverage) Delivery Path Door Height Hobart Care Unlimited (Extended Warranty) Ceiling Height Hobart Assurance Unlimited Loading Dock Yes No Hobart Prosurance (24/7 Coverage) Cold Water Available (Required for EGR/ADV Models) Yes No Preventative Maintenance Qty:
Floor Sink/Drain Available Yes No
ADDITIONAL COMMENTS
*SEF (Specially Engineered Feature) – will result in additional cost and lead time.
DISHMACHINE LENGTH QUICK REFERENCE GUIDE
Space Available for Dishmachine Model
LOAD SECTION CENTER SECTION UNLOAD SECTION
Blower Dryer
Automatic Soil Removal
(ASR)
*Total Length (including overhang)
Load Platform, 3' Prewash & 2' ASR
(if equipped)
3' Wash Tank, 3' Rinse Tank (if equipped)
& 2' Dual Rinse
Control Box, Blower Dryer (if equipped) & Unload Platform
18' Available FT1000Se-BAS 5'7" 5' 5'6" No No 17'6"
19' Available FT1000Se-BAS FT1000Se-EGR (ASR removed)
6'7" 6'7"
5' 5'
5'6" 5'6"
No No
No No
18'6" 18'6"
20' Available FT1000Se-BAS BD FT1000Se-EGR FT1000Se-EGR BD (ASR removed)
5'7" 7'7" 5'7"
5' 5' 5'
7'5" 5'6" 7'5"
Yes No Yes
No Yes No
19'6" 19'6" 19'6"
21' Available FT1000Se-EGR BD (ASR removed) FT1000e-BAS FT1000e-EGR (ASR removed)
6'7" 5'7" 5'7"
5' 8' 8'
7'5" 5'6" 5'6"
Yes No No
No No No
20'6" 20'6" 20'6"
22' Available FT1000Se-BAS BD FT1000Se-EGR BD
5'7" 7'7"
5' 5'
9' 7'5"
Yes Yes
No Yes
21'1" 21'6"
23' Available FT1000Se-EGR BD FT1000e-BAS BD FT1000e-EGR FT1000e-EGR BD (ASR removed)
8'7" 5'7" 7'7" 5'7"
5' 8' 8' 8'
7'5" 7'5" 5'6" 7'5"
Yes Yes No Yes
Yes No Yes No
22'7" 22'6" 22'6" 22'6"
24' Available FT1000Se-EGR BD FT1000e-BAS BD FT1000e-EGR
7'7" 6'7" 8'7"
5' 8' 8'
9' 7'5" 5'6"
Yes Yes No
Yes No Yes
23'1" 23'6" 23'7"
25' Available FT1000e-BAS BD FT1000e-EGR BD FT1000e-ADV
5'7" 7'7" 7'7"
8' 8' 8'
9' 7'5" 7'5"
Yes Yes Yes
No Yes Yes
24'1" 24'6" 24'6"
26' Available FT1000e-BAS BD FT1000e-EGR BD
6'7" 8'7"
8' 8'
9' 7'5"
Yes Yes
No Yes
25'1" 25'7"
27' Available FT1000e-BAS BD FT1000e-EGR BD FT1000e-EGR BD (ASR removed) FT1000e-ADV
5'7" 7'7" 5'7" 7'7"
8' 8' 8' 8'
11' 9'
11' 9'
Yes Yes Yes Yes
No Yes No Yes
26'1" 26'1" 26'1" 26'1"
28' Available FT1000e-EGR BD FT1000e-ADV
8'7" 8'7"
8' 8'
9' 9'
Yes Yes
Yes Yes
27'2" 27'2"
* Total length and section lengths are approximates and can vary +/- 2".
HB2664 (05-21)
| Completed By: |
| Date: |
| Customer Name: US Coast Guard Academy |
| Customer Location: New London, CT 06320 |
| Job Type: Choice2 |
| Existing MakeModel: Hobart FT900 271181689 |
| Model Selection: Choice1 |
| Load Section: Choice4 |
| Unload Section: Choice2 |
| Other - Load Section: |
| Voltage: Choice1 |
| Other - Unload Section: |
| Height: Choice1 |
| Direction of Operation: Choice1 |
| Tank Heat: Choice2 |
| Flowing Steam Pressure: Choice1 |
| Drain Location: Choice1 |
| Booster Heater: Choice2 |
| Circuit Breakers: Choice4 |
| Conveyor Type: Choice2 |
| Other - Voltage: |
| Ware Type/Make/Model: |
| Correctional Package: Choice3 |
| Auto Clean: Choice2 |
| Blower Dryer: Choice3 |
| Split, Vertical Doors: Off |
| Auto Delime: Choice3 |
| Water Softener: Off |
| Remove ASR: Off |
| Add ASR: Choice1 |
| Casino Package: Off |
| 1" Steam Piping: Off |
| Flanged Feet: Off |
| DWTK - With or Without Hobart Service: Choice 1 |
| Drain Water Tempering Kit: Choice 1 |
| Water Hammer Arrestor Kit: Off |
| Minimum Delivery Path Door Width: 54 |
| Ceiling Height: 86 |
| Loading Dock: Choice1 |
| Cold Water Available: Choice1 |
| Delivery Path Door Height: 82 |
| Floor Sink/Drain Available: Choice1 |
| Warranty Options: Choice1 |
| Preventive Maintenance Qty: |
| Clear Button: |
| Additional Comments: FT1000E-CBR0NO Without Circuit Breaker, FT1000E-DORHNG Hinge doors, all sections, FT1000E-ROD0NO Without Cross Rods |
• Removal and disposal of existing equipment • Uncrating and set-in place in existing location • Validation equipment is working properly upon completion of installation
• Removal of packaging materials and rubbish
| Split Sections - Load: Choice1 |
| Split Sections - Center: Choice1 |
| Split Sections - Unload: Choice1 |
| Polypropylene or Stainless Steel: Off |
| Cross Rods: Off |
File details come from the government source that posted it. Updated .