This document is an attachment to a federal solicitation requesting quotes for the manufacturing of large and small shear block containment units. The Portsmouth Naval Shipyard seeks 14 large and 8 small shear blocks to support the USS Cheyenne. Responses are due by September 15, 2021, with an anticipated period of performance from that date until January 21, 2022. This is a firm fixed price small business set aside solicitation issued by the Department of the Navy Naval Sea Systems Command. Interested parties must monitor the posting for the solicitation and any amendments, as no paper, faxed or emailed copies will be provided. The attachment includes specifications and testing requirements for the shear blocks.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT __________________

PRINTED 13 APRIL 2021 PAGE _______

ATTACHMENT 1 TO EXHIBIT A (DD FORM 1423)

REQ DOC NO. - __1085V002 ATTACHMENT _________

CONTINUATION SHEET CONTRACT NO. - _______________ PAGE ___ OF ___

NAME OF OFFER OR/CONTRACTOR

______________________________________________________________________________ITEM # SUPPLIES/SERVICES QTY U/I

SMALL SHEAR BLOCK DISPOSAL CONTAINER 1 JO

C. DESCRIPTION/SPECIFICATIONS

C.1 LARGE SHEAR BLOCK DISPOSAL CONTAINER RF-2203, STEEL

C.1.1 8 COMPLETE UNITS

C.1.2 MANUFACTURE IN ACCORDANCE WITH PNS 2370A0000389 REV ORIG. DRAWING IS ATTACHED.

C.2 PNSY PLANS TO INSPECT THE CONTAINERS AT AN APPROXIMATE HALF WAY POINT OF CONSTRUCTION, DURING THE MAGNETIC PARTICLE TESTING AND AT COMPLETION OF CONSTRUCTION.

C.2.1 CONTRACTOR SHALL NOTIFY PNSY WITH PROJECTED WORK SCHEDULE. HALFWAY POINT OF CONSTRUCTION SHALL BE DETERMINED BY THE CONTRACTOR AND PNSY AFTER AWARD OF CONTRACT.

C.3 PERFORM A VISUAL TEST PER AWS S1.1/D.1.1M:2020; STRUCTURAL WELDING CODE – STEEL; 24TH EDITION, APPROVED 19 DECEMBER 2019.

C.4 PERFORM MAGNETIC PARTICLE TESTING PER NAVSEA TECHNICAL PUBLICATION T9074-AS-GIB-010/271 REV 1; REQUIREMENTS FOR NONDESTUCTIVE TESTING METHODS AND MIL-STD-2035A; NONDESTRUCTIVE TESTING ACCEPTANCE CRITERIA.

C.5 PERFORM LOAD/PROOF TEST ON SAFETY HOIST RING AND LIFTING LUGS PER THE INSTRUCTIONS AND REQUIREMENTS OF THE STATEMENT OF TESTS AND DRAWING. BOTH ARE ATTACHED.

C.6 GOVERNMENT INSPECTION IS REQUIRED DURING MANUFACTURE AND PRIORTO SHIPMENT FROM THIS FACILITY. UPON RECEIPT OF THIS ORDER, PROMPLTLY NOTIFY THE REPRESENTATIVE OF THE GOVERNMENT OFFICE WHO NORMALLY SERVES YOUR FACILITY SO THAT APPROPRIATE PLANNING FOR GOVERNMENT INSPECTION CAN BE ACCOMPLISHED. IN THE EVENT A REPRESENTATIVE OF THE GOVERNMENT OFFICE CANNOT BE LOCATED, THE PURCHASING AGENT SHOULD BE NOTIFIED PROMPLTLY.

C.7 DATA REQUIREMENTS PER EXHIBIT A (DD-1423) & ATTCHMENT #1, FOR SAFETY HOIST RING

C.7.1 CERTIFICATE OF COMPLIANCE; EXHIBIT A SEQUENCE A001.

C.7.2 BEFORE VISUAL TEST CERTIFICATION, EXHIBIT A SEQUENCE A002.

C.7.3 AFTER VISUAL TEST CERTIFICATION, EXHIBIT A SEQUENCE A003.

C.7.4 BEFORE MAGNETIC PARTICLE TEST CERIFICATION, EXHIBIT A SEQUENCE A004.

C.7.5 AFTER MAGNETIC PARTICLE TEST CERIFICATION, EXHIBIT A SEQUENCE A005.

C.7.6 LOAD/PROOF TEST CERIFICATION, EXHIBIT A SEQUENCE A006.

C.8 DATA REQUIREMENTS PER EXHIBIT A (DD-1423) & ATTCHEMT #1, FOR LIFTING LUGS.

C.8.1 CERTIFICATE OF COMPLIANCE; EXHIBIT A SEQUENCE A007.

C.8.2 BEFORE VISUAL TEST CERTIFICATION, EXHIBIT A SEQUENCE A008.

C.8.3 AFTER VISUAL TEST CERTIFICATION, EXHIBIT A SEQUENCE A009.

C.8.4 BEFORE MAGNETIC PARTICLE TEST CERTIFICATION, EXHIBIT A SEQUENCE A010.

C.8.5 AFTER MAGNETIC PARTICLE TEST CERTIFICATION, EXHIBIT A SEQUENCE A011.

C.8.6 LOAD/PROOF TEST CERIFICATION, EXHIBIT A SEQUENCE A012.

C.8.7 MATERIAL SAFETY DATA SHEETS, EXHIBIT A SEQUENCE A013.

D. PACKING/PACKAGING/MARKINGS:

D.1 FOLLOWING SATISFACTORY COMPLETION OF LOAD/PROOF TEST, PERMANENTLY MARK ITEMS AS REQUIRED PER DRAWING AND STATEMENT OF REQUIRED TESTS.

(ADP DD FORM 1423 (MECHANIZED EQUIVALENT) PER DAR CLAUSE 16-815)

CONTRACT DATA REQUIREMENTS LIST

SYSTEM/ITEM: LARGE SHEAR BLOCK DISPOSAL CONTAINERCATEGORY ____________
ITEM NOCONTRACTOR
01SEQ NOA001
02DATA DESCCERTIFICATE OF COMPLIANCE
03SUBTITLESAFETY HOIST RING
04DID NUMBERPER ATTACHMENT 1 TO EXHIBIT A
05CONTRACT REFPARA. C.7.1
06TECH OFFICE2370.1
07DD 250 REQSD
08APP CODE
09IAC INPUT
10FREQUENCYO-TIME
11AS OF DATE
12DATE 1ST SUBMWITH MATERIAL
13DATE SUB SUBM
14DISTRIBUTION410__/0 VIA MAIL (N0 DD 250 REQD)
15TOTAL__
16REMARKS

SEQ. NO. A001

PREPARED BY ________________________________________________DATE__________________
APPROVED BY ________________________________________________DATE__________________
DD FORM 1423

CONTRACT __________________

PRINTED 13 APRIL 2021 PAGE _______

EXHIBIT A

SYSTEM/ITEM: LARGE SHEAR DISPOSAL CONTAINERCATEGORY ____________
ITEM NOCONTRACTOR
01SEQ NOA002
02DATA DESCVISUAL TEST CERTIFICATION
03SUBTITLEBEFORE; SAFETY HOIST RING
04DID NUMBERPER ATTACHMENT 1 TO EXHIBIT A
05CONTRACT REFPARA. C.7.2
06TECH OFFICE2370.1
07DD 250 REQSD
08APP CODE
09IAC INPUT
10FREQUENCYO-TIME
11AS OF DATE
12DATE 1ST SUBMWITH MATERIAL
13DATE SUB SUBM
14DISTRIBUTION410__/0 VIA MAIL (N0 DD 250 REQD)
15TOTAL__
16REMARKS

SEQ. NO. A002

PREPARED BY ________________________________________________DATE__________________
APPROVED BY ________________________________________________DATE__________________
DD FORM 1423

CONTRACT __________________

PRINTED 13 APRIL 2021 PAGE _______

SYSTEM/ITEM: LARGE SHEAR BLOCK DISPOSAL CONTAINERCATEGORY ____________
ITEM NOCONTRACTOR
01SEQ NOA003
02DATA DESCVISUAL TEST CERTIFICATION
03SUBTITLEAFTER: SAFETY HOIST RING
04DID NUMBERPER ATTACHMENT 1 TO EXHIBIT A
05CONTRACT REFPARA. C.7.3
06TECH OFFICE2370.1
07DD 250 REQSD
08APP CODE
09IAC INPUT
10FREQUENCYO-TIME
11AS OF DATE
12DATE 1ST SUBMWITH MATERIAL
13DATE SUB SUBM
14DISTRIBUTION410__/0 VIA MAIL (N0 DD 250 REQD)
15TOTAL__
16REMARKS

SEQ. NO. A003

PREPARED BY ________________________________________________DATE__________________
APPROVED BY ________________________________________________DATE__________________
DD FORM 1423

CONTRACT __________________

PRINTED 13 APRIL 2021 PAGE _______

SYSTEM/ITEM: LARGE SHEAR BLOCK DISPOSAL CONTAINERCATEGORY ____________
ITEM NOCONTRACTOR
01SEQ NOA004
02DATA DESCMAGNETIC PARTICLE TEST
03SUBTITLEBEFORE: SAFETY HOIST RING
04DID NUMBERPER ATTACHMENT 1 TO EXHIBIT A
05CONTRACT REFPARA. C.7.4
06TECH OFFICE2370.1
07DD 250 REQSD
08APP CODE
09IAC INPUT
10FREQUENCYO-TIME
11AS OF DATE
12DATE 1ST SUBMWITH MATERIAL
13DATE SUB SUBM
14DISTRIBUTION410__/0 VIA MAIL (N0 DD 250 REQD)
15TOTAL__
16REMARKS

SEQ. NO. A004

PREPARED BY ________________________________________________DATE__________________
APPROVED BY ________________________________________________DATE__________________
DD FORM 1423

CONTRACT __________________

PRINTED 13 APRIL 2021 PAGE _______

SYSTEM/ITEM: LARGE SHEAR BLOCK DISPOSAL CONTAINERCATEGORY ____________
ITEM NOCONTRACTOR
01SEQ NOA005
02DATA DESCMAGNETIC PARTICLE TEST
03SUBTITLEAFTER: SAFETY HOIST RING
04DID NUMBERPER ATTACHMENT 1 TO EXHIBIT A
05CONTRACT REFPARA. C.7.5
06TECH OFFICE2370.1
07DD 250 REQSD
08APP CODE
09IAC INPUT
10FREQUENCYO-TIME
11AS OF DATE
12DATE 1ST SUBMWITH MATERIAL
13DATE SUB SUBM
14DISTRIBUTION410__/0 VIA MAIL (N0 DD 250 REQD)
15TOTAL__
16REMARKS

SEQ. NO. A005

PREPARED BY ________________________________________________DATE__________________
APPROVED BY ________________________________________________DATE__________________
DD FORM 1423

CONTRACT __________________

PRINTED 13 APRIL 2021 PAGE _______

SYSTEM/ITEM: LARGE SHEAR BLOCK DISPOSAL CONTAINERCATEGORY ____________
ITEM NOCONTRACTOR
01SEQ NOA006
02DATA DESCLOAD PROOF TEST CERIFICATION
03SUBTITLESAFETY HOIST RING
04DID NUMBERPER ATTACHMENT 1 TO EXHIBIT A
05CONTRACT REFPARA. C.7.6
06TECH OFFICE2370.1
07DD 250 REQSD
08APP CODE
09IAC INPUT
10FREQUENCYO-TIME
11AS OF DATE
12DATE 1ST SUBMWITH MATERIAL
13DATE SUB SUBM
14DISTRIBUTION410__/0 VIA MAIL (N0 DD 250 REQD)
15TOTAL__
16REMARKS

SEQ. NO. A006

PREPARED BY ________________________________________________DATE__________________
APPROVED BY ________________________________________________DATE__________________
DD FORM 1423

CONTRACT __________________

PRINTED 13 APRIL 2021 PAGE _______

SYSTEM/ITEM: LARGE SHEAR BLOCK DISPOSAL CONTAINERCATEGORY ____________
ITEM NOCONTRACTOR
01SEQ NOA007
02DATA DESCCERTIFICATE OF COMPLIANCE
03SUBTITLELIFTING LUGS
04DID NUMBERPER ATTACHMENT 1 TO EXHIBIT A
05CONTRACT REFPARA. C.8.1
06TECH OFFICE2370.1
07DD 250 REQSD
08APP CODE
09IAC INPUT
10FREQUENCYO-TIME
11AS OF DATE
12DATE 1ST SUBMWITH MATERIAL
13DATE SUB SUBM
14DISTRIBUTION410__/0 VIA MAIL (N0 DD 250 REQD)
15TOTAL__
16REMARKS

SEQ. NO. A007

PREPARED BY ________________________________________________DATE__________________
APPROVED BY ________________________________________________DATE__________________
DD FORM 1423

CONTRACT __________________

PRINTED 13 APRIL 2021 PAGE _______

SYSTEM/ITEM: LARGE SHEAR BLOCK DISPOSAL CONTAINERCATEGORY ____________
ITEM NOCONTRACTOR
01SEQ NOA008
02DATA DESCVISUAL TEST CERIFICATION
03SUBTITLEBEFORE: LIFTING LUGS
04DID NUMBERPER ATTACHMENT 1 TO EXHIBIT A
05CONTRACT REFPARA. C.8.2
06TECH OFFICE2370.1
07DD 250 REQSD
08APP CODE
09IAC INPUT
10FREQUENCYO-TIME
11AS OF DATE
12DATE 1ST SUBMWITH MATERIAL
13DATE SUB SUBM
14DISTRIBUTION410__/0 VIA MAIL (N0 DD 250 REQD)
15TOTAL__
16REMARKS

SEQ. NO. A008

PREPARED BY ________________________________________________DATE__________________
APPROVED BY ________________________________________________DATE__________________
DD FORM 1423

CONTRACT __________________

PRINTED 13 APRIL 2021 PAGE _______

SYSTEM/ITEM: LARGE SHEAR BLOCK DISPOSAL CONTAINERCATEGORY ____________
ITEM NOCONTRACTOR
01SEQ NOA009
02DATA DESCVISUAL TEST CERTIFICATION
03SUBTITLEAFTER: LIFTING LUGS
04DID NUMBERPER ATTACHMENT 1 TO EXHIBIT A
05CONTRACT REFPARA. C.8.3
06TECH OFFICE2370.1
07DD 250 REQSD
08APP CODE
09IAC INPUT
10FREQUENCYO-TIME
11AS OF DATE
12DATE 1ST SUBMWITH MATERIAL
13DATE SUB SUBM
14DISTRIBUTION410__/0 VIA MAIL (N0 DD 250 REQD)
15TOTAL__
16REMARKS

SEQ. NO. A009

PREPARED BY ________________________________________________DATE__________________
APPROVED BY ________________________________________________DATE__________________
DD FORM 1423

CONTRACT __________________

PRINTED 13 APRIL 2021 PAGE _______

SYSTEM/ITEM: LARGE SHEAR BLOCK DISPOSAL CONTAINERCATEGORY ____________
ITEM NOCONTRACTOR
01SEQ NOA010
02DATA DESCMAGNETIC PARTICLE TEST
03SUBTITLEBEFORE: LIFTING LUGS
04DID NUMBERPER ATTACHMENT 1 TO EXHIBIT A
05CONTRACT REFPARA. C.8.4
06TECH OFFICE2370.1
07DD 250 REQSD
08APP CODE
09IAC INPUT
10FREQUENCYO-TIME
11AS OF DATE
12DATE 1ST SUBMWITH MATERIAL
13DATE SUB SUBM
14DISTRIBUTION410__/0 VIA MAIL (N0 DD 250 REQD)
15TOTAL__
16REMARKS

SEQ. NO. A010

PREPARED BY ________________________________________________DATE__________________
APPROVED BY ________________________________________________DATE__________________
DD FORM 1423

CONTRACT __________________

PRINTED 13 APRIL 2021 PAGE _______

SYSTEM/ITEM: LARGE SHEAR BLOCK DISPOSAL CONTAINERCATEGORY ____________
ITEM NOCONTRACTOR
01SEQ NOA011
02DATA DESCMAGNETIC PARTICLE TEST
03SUBTITLEAFTER: LIFTING LUG
04DID NUMBERPER ATTACHMENT 1 TO EXHIBIT A
05CONTRACT REFPARA. C.8.5
06TECH OFFICE2370.1
07DD 250 REQSD
08APP CODE
09IAC INPUT
10FREQUENCYO-TIME
11AS OF DATE
12DATE 1ST SUBMWITH MATERIAL
13DATE SUB SUBM
14DISTRIBUTION410__/0 VIA MAIL (N0 DD 250 REQD)
15TOTAL__
16REMARKS

SEQ. NO. A011

PREPARED BY ________________________________________________DATE__________________
APPROVED BY ________________________________________________DATE__________________
DD FORM 1423

CONTRACT __________________

PRINTED 13 APRIL 2021 PAGE _______

SYSTEM/ITEM: LARGE SHEAR BLOCK DISPOSAL CONTAINERCATEGORY ____________
ITEM NOCONTRACTOR
01SEQ NOA012
02DATA DESCLOAD/PROOF TEST CERTIFICATION
03SUBTITLELIFTING LUGS
04DID NUMBERPER ATTACHMENT 1 TO EXHIBIT A
05CONTRACT REFPARA. C.8.6
06TECH OFFICE2370.1
07DD 250 REQSD
08APP CODE
09IAC INPUT
10FREQUENCYO-TIME
11AS OF DATE
12DATE 1ST SUBMWITH MATERIAL
13DATE SUB SUBM
14DISTRIBUTION410__/0 VIA MAIL (N0 DD 250 REQD)
15TOTAL__
16REMARKS

SEQ. NO. A012

PREPARED BY ________________________________________________DATE__________________
APPROVED BY ________________________________________________DATE__________________
DD FORM 1423

CONTRACT __________________

PRINTED 13 APRIL 2021 PAGE _______

SYSTEM/ITEM: LARGE SHEAR BLOCK DISPOSAL CONTAINERCATEGORY ____________
ITEM NOCONTRACTOR
01SEQ NOA013
02DATA DESCMATERIAL SAFETY DATA SHEETS
03SUBTITLE
04DID NUMBERPER ATTACHMENT 1 TO EXHIBIT A
05CONTRACT REFPARA. C.8.7
06TECH OFFICE2370.1
07DD 250 REQSD
08APP CODE
09IAC INPUT
10FREQUENCYO-TIME
11AS OF DATE
12DATE 1ST SUBMWITH MATERIAL
13DATE SUB SUBM
14DISTRIBUTION410__/0 VIA MAIL (N0 DD 250 REQD)
15TOTAL__
16REMARKS

SEQ. NO. A013

PREPARED BY ________________________________________________DATE__________________
APPROVED BY ________________________________________________DATE__________________
DD FORM 1423

CONTRACT __________________

PRINTED 13 APRIL 2021 PAGE _______

CONTRACT/SOLICITATION ________________________________________________________________ ITEM ___________________________________________ (DATE FOR ITEM) ___________________

REQUIRED CERTIFICATION

A. CERTIFICATION SHALL BE SUPPLIED WITH EACH SHIPMENT OF MATERIAL. CERTIFICATION (CERTIFICATE OF COMPLIANCE) SHALL BE SUPPLIED AS OUTLINED IN PARAGRAPH B. THE VENDOR IS LIABLE FOR CONDUCTING ALL TESTS, ANALYSES, INSPECTIONS, AND EXAMINATIONS, ETC., AS SPECIFIED BY THE CONTRACT AND SPECIFICATIONS WHETHER CERTIFICATIONS ARE REQUIRED OR NOT.

CERTIFICATE OF COMPLIANCE (PROVIDE THE FOLLOWING VERBATIM STATEMENT OR COMPLETE THE OPTIONAL FORM AT THE END OF THIS PART)

"I ATTEST ALL ITEMS FURNISHED ON THIS CONTRACT ARE IN FULL COMPLIANCE WITH ALL CONTRACT REQUIREMENTS".

B. CERTIFICATION SHALL BE SUPPLIED PER THE FOLLOWING INSTRUCTIONS:

1. THE CERTIFICATION OF COMPLIANCE SHALL CONTAIN THE SIGNATURE AND TITLE OF THE VENDOR OFFICIAL DESIGNATED RESPONSIBLE FOR QUALITY ASSURANCE.

2. THE MATERIAL IDENTIFICATION (E.G. LOT, BATCH, PART #, ETC.) SHALL BE INCLUDED ON THE CERTIFICATE OF COMPLIANCE.

CERTIFICATE OF COMPLIANCE

COMPANY NAME

MATERIL IDENTIFICATION (COMPLETE APPLICABLE ITEMS)

CONTRACT NO. ______________ ORDER NO. ________________ ITEM NO. ____________________ NATIONAL/LOCAL STOCK NO. NSN/LSN ____________________________________________________ MANUFACTURER’S PART NO. _____________________________________________________________ MANUFACTURER’S SERIAL NO. ___________________________________________________________ DRAWING AND PIECE NO. _________________________________________________________________

MANUFACTURER’S LOT/HEAT NOS. AS MARKED ON THE MATERIAL _________________________

ALL INSPECTIONS AND TEST REPORTS REQUIRED BY ATTACHMENT I TO EXHIBIT A (DD FORM 1423) FOR TRACEABILITY TO EACH CONTRACT ITEM MUST ACCOMPANY THIS SIGNED STATEMENT:

THE INSPECTION AND TEST REPORTS (AS APPLICABLE) PROVIDED REPRESENT THE ACTUAL ATTRIBUTES OF THE ITEMS FURNISHED ON THIS CONTRACT AND INDICATE FULL COMPLIANCE WITH ALL CONTRACT REQUIREMENTS. I ATTEST ALL ITEMS FURNISHED ON THIS CONTRACT ARE IN FULL COMPLIANCE WITH ALL CONTRACT REQUIREMENTS.

SIGNATURE ___________________________________________________DATE _______________
QUALITY ASSURANCE OFFICIAL