This document is a Request for Qualifications (RFQ) issued by the City of Nashua, New Hampshire, seeking professional engineering services for a Leachate PFAS Removal and Destruction Pilot Test at the Four Hills Landfill. The City is soliciting letters of interest from engineering consultants to conduct a pilot treatment/removal program for per- and poly-fluorinated alkyl substances (PFAS) from landfill leachate. The selected engineering consultant will design a pilot project, assist in selecting treatment technology, oversee a PFAS/leachate pilot treatment vendor, provide permitting services, analyze pilot test data, and develop preliminary full-scale treatment system designs. Qualifications are due by September 16, 2025, at 2:00 PM, with interviews planned for late September/early October 2025. Up to three respondents will be invited to interview, and the final consultant selection will occur following these interviews.

The project is funded through the City of Nashua and involves managing approximately 1,500,000 gallons of monthly leachate from a lined landfill that currently discharges to the Nashua Wastewater Treatment Plant. Respondents must be listed on the NHDES "Water Division - Wastewater Engineering Bureau, Roster of Pre-Qualified Licensed Engineering Firms" to be considered. Insurance requirements include $1,000,000 general liability, $1,000,000 motor vehicle liability, and $1,000,000 professional liability. The City is committed to providing opportunities for disadvantaged business enterprises and will not discriminate based on race, color, national origin, sex, age, or disability. Leachate PFAS testing data from 2020-2022 is provided, showing varying concentrations of perfluorinated compounds.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ0379-091625

Leachate PFAS Removal and Destruction Pilot Test Page | 1

August 26, 2025

REQUEST FOR QUALIFICATIONS - INVITATION

Leachate PFAS Removal and Destruction Pilot Test

The City of Nashua is soliciting letters of interest and qualification statements for the provision of Professional Engineering services from an engineering consultant (EC) for assistance in conducting a pilot treatment/removal program for per- and poly-fluorinated alkyl substances (PFAS) from landfill leachate at the City of Nashua Four Hills Landfill. The selected EC will conduct pilot project design, assist in selecting a pilot treatment technology and overseeing a PFAS/leachate pilot treatment vendor, provide ancillary engineering services related to solid waste and air emissions permitting, assist in reviewing and analyzing the pilot test operations and analytical data, assist in selecting one or more on- or off-site PFAS-concentrate destruction options, and complete preliminary full-scale treatment system design as warranted based upon the results of the pilot testing. The EC shall be listed on the NHDES “Water Division – Wastewater Engineering Bureau, Roster of Pre-Qualified Licensed Engineering Firms” to be considered for this project.

Up to three respondents will be invited to interview. Interviews will be conducted late September/early October 2025. Final consultant selection will occur following interviews and selection results will be posted. The selected consultant will then be required to submit a scope of work and cost proposal. Contract approvals will be sought from the Board of Public Works and Finance Committee in accordance with the City’s purchasing policy.

The City, through the Mayor, who is the awarding authority and reserves the right to reject any and all qualifications or parts of qualifications; to waive any defects, information, and minor irregularities; to accept exceptions to these specifications; to award contracts or to cancel this request if in the City’s best interest.

INFORMATION FOR VENDORS:

The City is now accepting submittals electronically via Bonfire. Please review the electronic documents linked here, Bonfire Vendor Registration and Bonfire Vendor Submission for more information. We strongly recommend that you give yourself sufficient time and at least one (1) business day before due date to begin the uploading process and finalize your submission. Copies are also available on the City’s website in the Purchasing section within the Bids section.

If a Vendor chooses to submit their Qualification outside of Bonfire, the following are alternate options:

Paper: Submit one (1) paper copy and one digital copy on a USB drive sealed in envelope(s) and packages(s) clearly marked “RFQ0379-091625”. Qualifications must be submitted in the format provided and addresses the item(s) specified in the RFQ package.

Administrative Services Purchasing Department https://www.nashuanh.gov/DocumentCenter/View/28837/Bonfire-Process-Overview---Vendor-Registration https://www.nashuanh.gov/DocumentCenter/View/28838/Bonfire-Process-Overview---Vendor-Submission

Leachate PFAS Removal and Destruction Pilot Test Page | 2

Regardless of the method of submission, qualifications must be received no later than 2:00 PM on Tuesday, September 16, 2025 in the Purchasing Department; City Hall, 229 Main Street, Lower Level, Room 11, Nashua NH 03061. Postmarks or other timestamps will not be accepted in lieu of actual delivery. Vendors can use whatever delivery mechanism it chooses as long as it remains clear that the Vendor is responsible for submissions prior to the date and time.

The time of receipt shall be considered when a qualification has been officially documented by the Purchasing Department, in accordance with its established policies, as having been received at the location designated above. The City accepts no responsibility for mislabeled mail. Any and all damage that may occur due to shipping shall be the Vendors responsibility.

Complete specifications and related documentation are available on our website, www.nashuanh.gov, under Services, Bid Opportunities, Current Bids; and on the Bonfire website. Refer to document RFQ0379-091625 and related documents. Please note paper copies of qualification documents are not available in the City’s Purchasing Office.

Qualifications will be opened publicly on the due date and time. Results of the proposal opening will be posted on the City’s website, www.nashuanh.gov, under Services; Bid Opportunities; Bid Results; (Refer to Documents RFQ0379-091625) within twenty-four (24) hours of opening.

The timeline for this project is as follows:

Item Date

Pre-Qualification Meeting n/a

Deadline for Vendor Questions Thursday, September 4, 2025 at Noon

Answers/Clarifications Posted Tuesday, September 9, 2025 at 3:00 PM

Qualifications Due Tuesday, September 16, 2025 at 2:00 PM

Vendors are encouraged to submit questions via email; however, the City assumes no liability for assuring accurate and complete email transmission/receipt and is no responsible to acknowledge receipt. Inquires must be submitted in writing, citing the RFQ title/number, Page Section, and must be received no later than Thursday, September 4, 2025 at Noon to:

City of Nashua 229 Main Street, Room 11

Nashua, NH 03060 purchasing@nashuanh.gov

The City of Nashua will consider all timely-received inquiries and, if reasonable and appropriate, will issue an addendum to clarify or modify this RFQ on the City’s website www.nashuanh.gov, under Services, Bid Opportunities; Current Bids; (Refer to Document RFQ0379-091625) and on Bonfire no later than Tuesday, September 9, 2025 at 3:00 PM.

http://www.nashuanh.gov/ http://www.nashuanh.gov/ file://CityFile/Secure/DPWShare/ADMIN%20DEPT/Finance/DPW%20PROJECTS/ENGINEERING/Safe%20Routes%20to%20School/Charlotte%20Ave%20Elementary/JUN%202020%20CONTRACT%20DOCUMENTS/www.nashuanh.gov

Leachate PFAS Removal and Destruction Pilot Test Page | 3

The selected firm/individual will be required to provide insurance certificates as follows:

General and Motor Vehicle Liability policies must name the City of Nashua as an additional insured

General Liability: $1,000,000 per occurrence; $2,000,000 aggregate;

Motor Vehicle Liability: $1,000,000 Combined Single Limit Automobile Liability

Coverage must include all owned, non-owned and hired vehicles.

Professional Liability: $1,000,000;

Workers' Compensation Coverage in compliance with the State of New Hampshire statutes, $100,000/$500,000/$100,000.

The City hereby notifies all vendors that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit qualifications in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, sex, age, or disability in consideration for an award.

Qualifications must be submitted in the format provided and address the items specified in this request. The City may reject any or all of the qualifications on any basis and without disclosure of a reason. The failure to make such a disclosure shall not result in accrual of any right, claim or cause of action by any unsuccessful Vendor against The City. The City reserves the right to waive any irregularities when the public interest will be served thereby. The City also reserves the right to negotiate any change or amendment in any qualification without soliciting further requests for qualifications if the action is necessary for the best interest of The City.

The City of Nashua will reject the qualification of any vendor who is presently debarred, declared ineligible or excluded by any Federal department or agency, and reserves the right to reject the qualification of any proposer who has previously failed to perform any contract properly for any purchaser, or to complete on time, contracts of a similar nature, who is not in the position to perform the contract, or who has neglected the payment of bills or otherwise disregarded its obligations to clients, purchasers, subcontractors, material men, or employees.

The City is exempt of all taxes. All qualifications must be FOB Nashua, NH. All vendors must comply with all applicable Equal Employment Opportunity laws.

Pursuant to NRO 5-78 (F), the Purchasing Manager shall not solicit a bid from a contractor who is in default on the payment of taxes, licenses or other monies due the City. Therefore, this Qualification request is void as to anyone who is in default on said payments.

Amy Girard, Purchasing Manager City of Nashua, Administrative Services Division 229 Main Street, Nashua, NH 03060 Email: purchasing@nashuanh.gov Ph: 603-589-3332

Leachate PFAS Removal and Destruction Pilot Test Page | 4

RFQ Document List

The following is a list of documents included in this RFQ. Please ensure you have reviewed all documents before submitting all qualifications to the City.

☐ Invitation ☐ General Requirements ☐ Appendix A o NHDES Engineering Design Phase Contract o City of Nashua General Terms & Conditions

☐ Appendix B o 2025 Second Quarter Landfill Operations Report o CWSRF PFAS Leachate Removal Pilot Test Pre-Application

To be considered a complete response at a minimum the following documents must be returned along with your qualifications (discussed in more detail in the General Requirements document):

☐ Letter of Interest and Statement of Qualifications to include:

Cover Letter Project Team Project Approach Project Schedule References

☐ Any & All Addendums issued after the release of this RFQ. Addendums can be found on the City website or on Bonfire with the original RFQ documents

GENERAL REQUIREMENTS

Professional Engineering Services

August 2025

I. Introduction

The City of Nashua is soliciting letters of interest and qualification statements for the provision of Professional Engineering services from an engineering consultant (EC) for assistance in conducting a pilot treatment/removal program for per- and poly-fluorinated alkyl substances (PFAS) from landfill leachate at the City of Nashua Four Hills Landfill. The selected EC will conduct pilot project design, assist in selecting a pilot treatment technology and overseeing a PFAS/leachate pilot treatment vendor, provide ancillary engineering services related to solid waste and air emissions permitting, assist in reviewing and analyzing the pilot test operations and analytical data, assist in selecting one or more on- or off-site PFAS-concentrate destruction options, and complete preliminary full-scale treatment system design as warranted based upon the results of the pilot testing. The EC and their subconsultants must be able to perform, including but not limited to, every element of the Required Services and Scope of Services outlined below. The purpose of this Request for Qualifications (RFQ) is to solicit interest from qualified engineering firms from which a short list will be generated for further consideration and deliberation. The EC shall be listed on the NHDES “Water Division – Wastewater Engineering Bureau, Roster of Pre-Qualified Licensed Engineering Firms” to be considered for this project.

II. Background

The City of Nashua, Division of Public Works, Solid Waste Department operates the lined Phase I/II/III Secure Expansion Landfill, also known as the Four Hills Landfill, under New Hampshire Department of Environmental Services (NHDES) Solid Waste Permit #DES-SW-SP-95-002. The lined landfill produces an average of approximately 1,500,000 gallons per month of leachate that is collected and conveyed (currently without pre-treatment) to the City of Nashua Waste Water Treatment Plant (WWTP) under and Industrial Discharge Permit I-201. The Nashua WWTP discharges to the Merrimack River under federal NPDES permit NH0100170.

Request for Qualifications

Municipal solid waste (MSW), construction and demolition debris (C&D), asbestos waste, and wastewater sludge/grit from the City of Nashua have been disposed of at the Four Hills facility since 1971. The landfills at the facility include:

• a closed, 11-acre C&D debris landfill;

• a closed, 65-acre MSW landfill; and

• a 33.5-acre, double-lined, operating landfill (Phase I/II/III Secure Expansion Landfill).

The C&D landfill was closed in 1998 and the MSW landfill was closed in 2003. Both closed landfills are unlined, have HDPE geomembrane capping systems, and do not have leachate collection systems. The lined Phase I landfill began operation in 2003 with waste filling commencing in the Phase II landfill in 2009 and Phase III in 2020.

Primary and secondary leachate from the lined landfill is collected on the liner systems and conveyed via gravity to an on-site outfall, which is connected to the Nashua municipal sewer system. Primary and secondary leachate collected in the Phase I/II landfill drains out of the landfill via gravity flow. Primary and secondary leachate collected in the Phase III landfill drains into liner sumps and is pumped out of this phase of the landfill. Primary and secondary leachate from all three phases of the landfill are combined into a single flow prior to discharge from the facility to the Nashua Wastewater Treatment Plant (WWTP).

Maximum leachate flow to the sewer is limited to 200 gpm by the facility’s industrial wastewater discharge permit; typical leachate flow rates are less than 50 gpm. Additional information regarding leachate flow rates and analytical testing of leachate are summarized in Quarterly Operations Reports filed with the NHDES; the Second Quarter Operations Report is presented in the RFQ documents (Appendix A). A summary of PFAS testing in the landfill leachate is provided in the table below along with recorded average leachate flow rates on the date of sampling.

Date: 9/29/2022 1/13/2022 8/5/2021 12/3/2020 6/2/2020

Perfluorinated Alkyl Acids CAS Number Primary (ng/L)

Primary (ng/L)

Primary (ng/L)

Primary (ng/L)

Primary (ng/L)

Primary (ng/L)

Primary - Duplicate

(ng/L) Perfluorobutanoic Acid (PFBA) 375-22-4 2260 855 792 794 1130 310 280 Perfluoropentanoic Acid (PFPeA) 2706-90-3 1940 592 704 911 896 860 720 Perfluorobutanesulfonic Acid (PFBS) 375-73-5 3510 1580 1150 1170 2400 1800 1700 1H, 1H, 2H, 2H-Perfluorohexanesulfonic Acid (4:2FTS) 757124-72-4 <50 <5 <5 <10 <5.0 <49 <49 Perfluorohexanoic Acid (PFHxA) 307-24-4 3710 1280 1390 1360 2270 1900 1800 Perfluoropentanesulfonic Acid (PFPeS) 2706-91-4 65.3 <5 22.8 22.6 18.0 20 <20 Perfluoroheptanoic Acid (PFHpA) 375-85-9 804 346 352 359 433 430 380 Perfluorohexanesulfonic Acid (PFHxS) 355-46-4 494 239 196 204 240 330 310 Perfluorooctanoic Acid (PFOA) 335-67-1 1710 744 830 1000 1140 1000 920 1H, 1H, 2H, 2H-Perfluorooctanesulfonic Acid (6:2FTS) 27619-97-2 429 147 148 152 321 180 160 Perfluorheptanesulfonic Acid (PFHpS) 375-92-8 <50 <5 <5 <10 <5.0 <20 <20 Perfluorononanoic Acid (PFNA) 375-95-1 125 40.1 57.9 58.6 69.0 61 60 Perfluorooctanesulfonic Acid (PFOS) 1763-23-1 390 124 133 146 123 170 160 Perfluorodecanoic Acid (PFDA) 335-76-2 65 25.1 35.5 44.7 99.7 <44 <44 1H, 1H, 2H, 2H-Perfluorodecanesulfonic Acid (8:2FTS) 39108-34-4 <50 11.6 17.2 12.9 14.5 <99 <99 Perfluorononanesulfonic Acid (PFNS) 68259-12-1 <50 <5 <5 <10 <5.0 <30 <30 N-Methyl Perfluorooctanesulfonamoacetic Acid (NMeFOSAA) 2355-31-9 524 152 140 92.6 169 110 110 Perfluoroundecanoic Acid (PFUnA) 2058-94-8 <50 <5 <5 <10 5.29 <20 <20 Perfluorodecanesulfonic Acid (PFDS) 335-77-3 <50 <5 <5 <10 <5.0 <30 <30 Perfluorooctanesulfonamide (FOSA) 754-91-6 <50 <5 <5 <10 <5.0 NA NA N-Ethyl Perfluorooctanesulfonamidoacetic Acid (NEtFOSAA) 2991-50-6 105 31.9 28.9 17.1 42.1 <49 <49 Perfluorododecanoic Acid (PFDoA) 307-55-1 <50 <5 <5 <10 <5.0 <25 <25 Perfluorotridecanoic Acid (PFTrDA) 72629-94-8 <50 <5 <5 <10 <5.0 <20 <20 Perfluorotetradecanoic Acid (PFTA) 376-06-7 <50 <5 <5 <10 <5.0 <15 <15

PFOA/PFOS Total 2,100 868 963 1,146 1,260 1,170 1,080 Total Detected PFAS 16,131 6,168 5,997 6,345 9,371 7,171 6,600

18.1 32.6 32.0 44.4 36.1Leachate Flow to WWTF (GPM)

9/12/2018

31.3

The USEPA has issued guidance documents identifying landfills, and landfill leachate in particular, as known point sources of PFAS to the environment. An internal screening study performed by the City indicated that the Four Hills Landfill may contribute 30% to 70% of the total PFAS mass flux into the WWTP, depending on landfill leachate flow rates and flow rates in the sewer system at the time of sampling. The USEPA is requiring waste water influent, effluent, and biosolids testing for PFAS in all new NPDES permits for EPA-Region 1 with a request for “report only” of the data. NPDES effluent limits or industry pre-treatment standards for PFAS have not yet been set, but are likely forthcoming in the near future. Therefore, the City realizes the importance of working toward identifying a cost-effective solution to remove PFAS from the leachate to reduce the PFAS load at the WWTP.

Nashua applied for and received a subsided loan of $865,000 from the NHDES Clean Water State Revolving Fund (CWSRF) Emerging Contaminants Project program to complete a PFAS removal and a PFAS foam-concentrate destruction/sequestration pilot test. A copy of Nashua’s “Pre-Application” package requesting the Emerging Contaminants loan funding is presented in the RFQ documents (Appendix B).

III. Project Description and Goal

The EC shall assist the Nashua Solid Waste Department in designing and implementing the PFAS treatment pilot test and will engineer required solid waste permit applications and air permit applications, as needed to implement the project. The EC will take the lead on preparation of engineering submittals and design documents and will provide focused construction quality control oversight as required by solid waste regulations for certain project aspects, and may also serve in an advisory capacity on other aspects of the project. The goal of the project is to identify a PFAS treatment technology that can effectively remove PFAS from the Four Hills landfill leachate to reduce the PFAS load to the City’s WWTP, while also identifying a cost-effective option for disposal or destruction of PFAS-concentrate removed by the treatment process.

IV. Required Services

The EC will provide services that include, but are not limited to:

• Solid waste and waste water/leachate treatment engineering services from State of New Hampshire licensed professionals, including construction phase quality assurance oversight for leachate system modifications.

• Preparation of engineering design and construction plans and specifications, and permit applications, and assisting in the preparation of a pilot test Workscope document for submission to the NHDES.

• Assist the City in interpreting PFAS pilot test operational data and effluent and air emission laboratory testing data.

• Providing construction and project cost estimates.

• Construction administration support services.

V. Scope of Services

General project phases are described below and may be changed prior to or during development of the Workscope document required by the NHDES CWSRF (see Task 2). As previously indicated, the EC will take the lead on preparation of engineering submittals and design documents and will provide construction quality control oversight as required by solid waste regulations for certain project aspects, but may serve in an advisory capacity on other aspects of the project. Anticipated City-, EC-, or 3rd Party-lead or team roles are listed in brackets below for each task.

• Task 1 - Finalize Selection of PFAS Removal Technology and Treatment Vendor o Review available analytical data for on-site leachate [City and EC].

o Foam fractionation has been selected by the City as the preferred technology to pilot test for removal of PFAS from the leachate; on-site solidification/fixation of PFAS concentrate removed from the leachate has been considered, however, the City will evaluate other on- or off-site PFAS concentrate treatment and disposal options as recommended by the EC [City and EC].

o Communicate/interview and solicit costs from various PFAS treatment/foam fractionation vendors to select PFAS treatment vendor for pilot program [City and EC].

• Task 2 - Pilot Test Engineering and Design o Prepare a PFAS Removal and Treatment/Disposal Workscope for review by the NHDES CWSRF program [EC-lead].

o Prepare application for modification of Solid Waste Permit under New Hampshire solid waste regulations associated with changes to the landfill’s leachate collection and conveyance system and, as needed, permit modification for placement of solidified PFAS concentrate in the landfill [EC-lead].

o Prepare application for modification to the landfill’s Title V air permit related to anticipated air emissions from PFAS treatment system, including updated air modeling as needed [EC-lead].

• Task 3 - Pre-Pilot Test Construction Activities o Prepare level pad for mobile pilot test treatment unit [City-lead].

o Modify landfill leachate conveyance piping, pursuant to Solid Waste Permit modification design documents prepared by the EC, to convey leachate to mobile treatment system [City-lead with EC providing CQA oversight].

o Receive and place mobile treatment unit on level pad and demobilize/load treatment system at close of pilot test [City-lead].

o Provide 480-volt, 3-phase power to mobile pilot treatment system [City-lead].

• Task 4A - Conduct Pilot Test – PFAS Removal from Leachate o Minimum of 30 days and up to 45 days of on-site foam fractionation pilot treatment system operation, including on-site vendor operator, training, and post-use system cleaning – 30 to 45 days of system operation is desired to evaluate potential long-term scaling and maintenance requirements of the system. [3rd Party Vendor with EC oversight/advice] o Pilot Test Laboratory Analytical Testing [3rd Party Laboratory with EC advice] PFAS in pre- and post-treatment leachate (min. weekly samples) Standard leachate water quality parameter tests pre- and post-treatment (min. weekly samples) VOC and PFAS testing in system off-gas/stack pre- and post-granular activated carbon treatment for air permitting purposes

• Task 4B - Conduct Pilot Test – On-Site Solidification/Fixation of PFAS Concentrate (or alternative on-or off-site PFAS concentrate disposal or destruction options) o Foam-Concentrate Solidification Batch Testing in Cement Slurry Mixes [City Lead with EC Advice, and 3rd Party Laboratory] Solidification of foam in cement slurry, post curing leaching tests, and burial in landfill (if supported by batch/leaching test results and allowed by permit modification by NHDES-

SWMB);

Laboratory PFAS leaching TCLP and Cement Strength Testing o On- or Off-Site Foam Pilot or Bench-Scale Destruction Testing [EC and City] If supported by project budget or warranted as an alternative to the cement solidification approach, identify bench-scale, or possibly small-scale on-site or off-site pilot trials of alternative foam destruction technologies, such as super-critical water oxidation, electro-chemical oxidation, or thermal plasma/pyrolysis.

• Task 5 - Pilot Test Data Analysis and Reporting o Analyze the foam fractionation PFAS removal effectiveness and foam management/destruction pilot and bench-scale testing and analytical results. Analysis will include the analytical data collected during foam fractionation system operation (system leachate influent/effluent samples, system air emission tests, and foam/cement sequestration leaching/strength tests. [EC and City, with input from Treatment Vendor] o Prepare a pilot test summary report recommending options for full-scale system operation. [EC-lead]

• Task 6 - Prepare Preliminary Design Plans for Full-Scale/Permanent PFAS Treatment System [EC-lead] o Provided the piloted technology and specific treatment system are considered successful and a fit for the landfill, prepare preliminary design plans for installing a full-time, permanent PFAS treatment system. The design plans will serve to assist in capital cost budgeting and project planning for full-scale system installation and operation.

VI. Project Schedule

EC selection is anticipated early October 2025 with contract signing by November 7, 2025. Task 1 can begin immediately upon contract signing. Task 2 should be completed as soon as possible thereafter as the solid waste permit modification application and air permitting review timelines may be 90 to 180 days or more with NHDES Solid Waste Management Bureau and Air Resources Division with a goal to submit solid waste and air permit modification applications by end of December 2025. The goal is to start construction (Task 3) in early summer 2026 and begin pilot testing (Tasks 4A and 4B) in summer and early fall 2026. It is anticipated that Task 5 and Task 6 will be completed by the close of 2026.

VII. Available Documents

Documents related to this RFQ are available on the are available on our website, www.nashuanh.gov, under Services, Bid Opportunities, Current Bids; and on the Bonfire website. Additional documents may be added as they become available.

VIII. Submission Requirements

1. How to Submit: The City is now accepting submittals electronically via Bonfire. Please review the electronic documents linked here, Bonfire Vendor Registration and Bonfire Vendor Submission for more information. We strongly recommend that you give yourself sufficient time and at least one (1) business day before due date to begin the uploading process and finalize your submission. Copies are also available on the City’s website in the Purchasing section within the Bids section.

If a vendor chooses to submit materials outside of Bonfire, they must submit one (1) paper copy and one digital copy on a USB drive sealed in envelope(s) and packages(s) clearly marked “RFQ0379- 091625”. Qualifications must be submitted in the format provided and addresses the item(s) specified in the RFQ package.

Regardless of the method of submission, qualifications must be received no later than Tuesday, September 16, 2025 at 2:00 PM, in the Purchasing Department; City Hall, 229 Main Street, Lower Level, Room 11, Nashua NH 03061. Postmarks or other timestamps will not be accepted in lieu of actual delivery. A vendor can use whatever delivery mechanism it chooses as long as it remains clear that the vendor is responsible for submissions prior to the date and time.

The time of receipt shall be considered when a qualification package has been officially documented by the Purchasing Department, in accordance with its established policies, as having been received at the location designated above. The City accepts no responsibility for mislabeled mail. Any and all damage that may occur due to shipping shall be the Vendor’s responsibility.

http://www.nashuanh.gov/

Complete specifications and related documentation are available on our website, www.nashuanh.gov, under Services, Bid Opportunities, Current Bids; and on the Bonfire website.

Refer to document RFQ0379-091625 and related documents. Please note paper copies of bid documents are not available in the City’s Purchasing Office.

Qualifications will be opened publicly on the due date and time. Results of the proposal opening will be posted on the City’s website, www.nashuanh.gov, under Services; Bid Opportunities; Bid Results;

(Refer to Documents RFQ0379-091625) within twenty-four (24) hours of opening.

2. Required Documents All submissions should include the following:

A. Letter of Interest

a. Cover Letter: Include a Cover Letter, identifying the Consultant’s place of business, name and telephone number of the person to contact about the submission, and reference this RFQ.

The Cover Letter shall be signed by a representative of the Consultant that is authorized to enter into contracts.

b. Conflict of Interest: Include a statement on any current or potential conflicts of interest related to the performance of work at the City of Nashua, Four Hills Landfill. If there are such conflicts, provide a statement on means to address it

B. Statement of Qualifications: At a minimum the following should be discussed (note that NO pricing should be included in the submission):

a. Project Team. Submit a Statement of Qualifications that identifies specific staff to be assigned to this project, their specific roles, and their experience on similar projects, involving landfills and solid waste permitting in New Hampshire; air emission modeling for PFAS and VOCs and New Hampshire Title V air permitting; and PFAS treatment project, with a specific focus on foam fractionation for PFAS removal from leachate. Staff and subconsultants listed cannot be replaced without advanced written approval of the City.

Submit a project team organization chart and a statement of workforce availability identifying the approximate percentage of involvement each team member is anticipated to have on each anticipated task.

b. Project Approach. Include an understanding of the general approach for achieving the required tasks identified and expected during various phases of the project. Discuss a general scope of work to address items considered vital to project success. Demonstrate an understanding of the site conditions and permitting requirements and the challenges that may occur and how they would be addressed/resolved.

c. Project Schedule. Include an opinion on the feasibility of the proposed milestone schedule in Section VI above.

d. References. Provide three or more references that are knowledgeable about the consultant's experience on similar or related projects.

C. Addendums

a. Consultants should verify if any Addendums to this RFQ have been posted prior to submitting their Qualifications. A signed copy, to indicate receipt of each Addendum, must be included with a submittal.

IX. Selection

The following criteria will be used in evaluating RFQ responses. In preparing a Statement of Qualifications, the City recommends that the Consultant address the criteria clearly in their Cover Letter and demonstrate their ability to meet each criterion. Statements should be verifiable to the greatest extent possible.

1. Strength and duration of successful performance in the business of providing services as described herein (and for a minimum continuous period of not less than ten years).

2. Previous work experience: The Consultant has provided information that clearly indicates their experience with projects similar to the scope herein, and successfully relates that experience to services requested.

3. Strength of proposed project Personnel: The key personnel demonstrate sufficient experience, and on other similar projects. The project leaders have a high level of technical expertise in the nature of the work outlined in this RFQ.

4. Capability of the Firm: The Firm has, at their disposal, a sufficient labor pool from which an effective team of professionals can be developed, and whom have ample experience working together.

5. The Consultant has no conflict of interest or appearance of conflict of interest with any other party, or such relationships are not sufficient to warrant concern.

6. The Consultant has received positive references from all clients contacted by the City.

7. The degree of compliance with the requirements and requested format of this RFQ.

Upon review of the Statement of Qualifications, up to (3) respondents will be invited for selection interviews by the City’s Project Management Team. The interviews may be held virtually or in-person at the DPW administrative office located at 848 West Hollis Street in Nashua, New Hampshire. The intent of the interview will be for the Consultant to provide supplemental information, and for the City to familiarize themselves with the project team and further assess the firm’s capability. Consultants will be allowed a maximum of 20 minutes to provide additional information. While the interview is informal in nature, perspective consultants should be prepared to address:

1. Key Personnel: Consultants should introduce primary members of the firm, their backgrounds in this type of work and their rolls in the project.

2. Familiarity with the Four Hills Landfill: Consultants should be able to demonstrate they are familiar with Nashua, its operations and infrastructure, and available leachate testing data.

3. General Project Approach: Given a hypothetical project, Consultants should be able to provide a general discussion on what their typical project development process is and how they would be able to provide proposed services to the City.

4. Additional Information: Consultants are invited to provide any additional information or materials they feel are relevant to supporting Nashua and its infrastructure.

5. Questions and Answers: Consultants are invited to ask questions about Nashua, its infrastructure, operations, personnel, and expectations.

Final selection of a qualified firm will be made by the Selection Committee following interviews. The selected EC will then be required to submit a scope of work and cost proposal. Should the City determine an agreement cannot be reached, the next highest ranked respondent will be contacted and a scope of work and cost proposal will be requested.

Selection Criteria:

The following criteria and weight percentages will be used in rating responses to this Request for Qualifications:

Project Team and Commitment/Availability of Assigned Staff

• Project team experience and statement of commitment of workforce availability.

• Strong relative experience in completing similar tasks involving solid waste, air modeling and permitting, and PFAS remediation with a focus on leachate.

• On NHDES “Water Division – Wastewater Engineering Bureau, Roster of Pre-

Qualified Licensed Engineering Firms

35%

Project Approach

• Understanding of the general approach for achieving project success.

• Summary of items considered vital to project success.

• Understanding of the site conditions and permitting requirements and the challenges that may occur and how they would be addressed/resolved.

35%

Project Schedule

• Ability to meet proposed project timeline.

• If appropriate, outline an alternative project timeline with justification provided.

15%

Rating on Consultant’s Presentation

• Understanding of Nashua Infrastructure and the Four Hills Landfill

• Did the presentation provide detailed information on similar projects at other facilities?

• Did the consultant demonstrate an understanding of the project and the technology as it relates to the Four Hills Landfill?

15%

APPENDIX A

o NHDES Engineering Design Phase Contract o City of Nashua General Terms & Conditions

ENGINEERING DESIGN PHASE

CONTRACT FOR PROFESSIONAL SERVICES

FOR

TREATMENT WORKS PILOT TESTING

CITY/TOWN OF NASHUA, NEW HAMPSHIRE

This AGREEMENT made and entered into at HILLSBOROUGH County, New Hampshire, this ____ day of __________

20 , by and between City/Town of NASHUA, NEW HAMPSHIRE hereinafter called the OWNER, and

__________________________________________________ hereinafter called the ENGINEER.

WITNESSETH:

WHEREAS, the OWNER intends to conduct a pilot test to remove per- and poly-fluorinated alkyl substances (PFAS) from leachate to design and construct future Treatment Works.

Engineering assistance is required in conducting a pilot treatment/removal program for PFAS from landfill leachate at the City of Nashua Four Hills Landfill including pilot project design, selection of a pilot treatment technology and overseeing a PFAS/leachate pilot treatment vendor, providing ancillary engineering services related to solid waste and air emissions permitting, reviewing and analyzing the pilot test operations and analytical data, selecting one or more on- or off-site PFAS-concentrate destruction options, and completing preliminary full-scale treatment system design as warranted based upon the results of the pilot testing.

hereinafter called the PROJECT, and

WHEREAS, professional sanitary engineering services will be required for the preparation of plans and specifications and contract documents, and WHEREAS, such services are of a distinct professional nature and hence not subject to the bidding process, NOW THEREFORE, in consideration of these premises and of the mutual covenants herein set forth, the OWNER hereby employs the ENGINEER to furnish the following engineering services in connection with the proposed PROJECT;

and it is agreed by and between the OWNER and the ENGINEER as follows:

ENGINEERING DESIGN PHASE CONTRACT Page 2 of 7 For Professional Services for Treatment Works Pilot Testing

Rev. November 2022

I. SERVICES TO BE PERFORMED BY THE ENGINEER

A. Upon execution of this AGREEMENT, the ENGINEER agrees to proceed with all engineering, surveying, drafting, calculations, borings, and other work as required and necessary to assist in the performance of a leachate PFAS removal pilot test as further summarized in the develop and produce final plans, specifications, and associated contract documents involved in the construction of treatment works for: Leachate PFAS Removal and Destruction Pilot Test, Scope of Work attached as Exhibit A as recommended in an Engineering Report dated / / and/or modified by a Report dated / / . The ENGINEER further agrees that said services shall include, but shall not necessarily be limited to:

1. Plans, Specifications, and Contract Documents

a. As applicable, the preparation of detailed plans, specifications, and contract documents in accordance with the rules and regulations of the New Hampshire Department of Environmental Services, Water Division, hereinafter called the DIVISION, ready for the receipt of bids and the award of construction contracts for said construction; the work shall also include the preparation of estimates of the cost of construction based on the contract documents. Prepare applications with supporting and associated documents for Federal, State and other grant or loan programs. Assists the OWNER in securing grants or loans by State, Federal and other agency.

b. The furnishing of all the necessary subsurface investigations and field surveys required for the preparation and completion of approved plans, specifications, and contract documents.

c. The furnishing of ten (10) copies of the final plans, specifications, and contract documents to the OWNER;

three (3) copies of which are to be submitted to the DIVISION. Additional copies to be available at cost to the OWNER.

2. Site Acquisitions

a. Assistance to the OWNER including preparation of documents for the acquisition of lands, easements, and rights-of-way essential to the construction of the PROJECT.

II. THE OWNER'S RESPONSIBILITIES

A. Assist the ENGINEER by placing at his disposal all available information pertinent to the PROJECT, including previous reports and other data relative to the reports.

B. Make provisions for the ENGINEER to enter upon public and private lands, municipal facilities and industrial establishments as required to perform work under this AGREEMENT.

C. The OWNER also agrees to comply with DIVISION and Federal requirements (where applicable) and further agrees to acquire with the assistance of the ENGINEER all the necessary easements, options or outright purchases of land for the locations of said treatment works as shown on the contract plans. The provisions of this section shall be satisfied prior to submission of documents referred to in III (A) below. It is also understood that no approvals of reports or plans and specifications or other associated documents will be made by the DIVISION without fulfillment of this requirement.

III. TIME OF COMPLETION

A. The ENGINEER agrees that they will submit to the DIVISION for approval after modification or revision as recommended by the DIVISION and agreed to by the ENGINEER, the completed final plans, specifications, contract, and associated documents in compliance with the current issue of the DIVISION's standards of design within consecutive calendar days following the execution of this AGREEMENT, and deliver same to the OWNER within calendar days following the date of final approval by the DIVISION.

ENGINEERING DESIGN PHASE CONTRACT Page 3 of 7

Rev. November 2022

B. It is agreed by the parties to this contract that failure by the ENGINEER to complete the work within the time stipulated under III, A, above may be considered sufficient basis for the debarment of the ENGINEER from the DIVISION'S Roster of Prequalified Engineers as provided for under New Hampshire Code of Administrative Rules Env- Wq 603.08, or the Assessment of liquidated damages as provided for under RSA 485A: 4, XII.X

IV. COMPENSATION TO BE PAID THE ENGINEER

A. Method of Payments Amounts of Fees

1. Payment to the ENGINEER, for services rendered, shall be according to the following schedule:

Monthly billing based on hours and rates by labor category with mark-up and incidental expenses in accordance with the attached fee schedule.

2. The OWNER agrees to pay and the ENGINEER agrees to accept for all services under this AGREEMENT, a fee not to exceed Dollars($ ).

3. If separate documents are required for additional construction contracts on this PROJECT, an additional fee as approved by the DIVISION shall be paid to the ENGINEER.

4. Prior to formal approval of contract documents by the DIVISION, the ENGINEER shall make such revisions in them as recommended by the DIVISION and agreed to by the ENGINEER without additional compensation. After formal approval, if it becomes necessary to revise the contract documents for reasons beyond the control of the ENGINEER, payment for such revision or revisions shall be made to the ENGINEER subject to approval by the

DIVISION.

B. Limits of All Payments

1. The ENGINEER hereby assures the OWNER and agrees that the following fee for his services (exclusive of surveys, borings, and certain special services which follow) in connection with the preparation of final plans, specifications, and contract documents and other work as generally described under I(A) is adequate to complete the assignment and shall not exceed Dollars($ ).

2. It is also agreed that payment to the ENGINEER for services in relation to engineering surveys, including layout and logging of borings, probings or seismic surveys, together with plats and project related special services shall be at actual cost. Actual cost shall include compensation to the ENGINEER for his work performed on these services. The ENGINEER further agrees that the work proposed under this item is enough to satisfactorily complete the contract documents and that the moneys to be paid under this item are adequate for the work proposed and shall not exceed Dollars($ ).

3. It is again agreed that payment to the ENGINEER for services in relation to subsurface exploration, including borings, probings or seismic surveys, shall be at actual cost as defined in IV (B) 2.The ENGINEER further agrees that the work proposed under this item is enough to satisfactorily complete the contract documents and that the moneys to be paid under this item are adequate for the work proposed and shall not exceed Dollars($ ).

4. It is also agreed that payment to the ENGINEER for services in relation to cadastral surveys and other work associated with the acquisition of lands, easements, and rights-of-way essential to the construction of the PROJECT shall be at actual cost as defined in IV (B) 2. The ENGINEER further agrees that the work proposed under this item is enough to provide adequate sites, easements, and rights-of-way to permit the unencumbered construction, operation, and maintenance of the completed project without interference in any way. The ENGINEER also assures the OWNER that the moneys to be paid under this item are adequate for the work proposed and shall not exceed Dollars($ ).

ENGINEERING DESIGN PHASE CONTRACT Page 4 of 7

Rev. November 2022

V. Additional Covenants A. The ENGINEER agrees to provide in active charge of this PROJECT for the life of the contract a Project Engineer who is a permanent employee of the ENGINEER and who is a “qualified sanitary engineer” as defined under the DIVISION'S “Rules and Regulations for the Prequalification of Consulting Engineers.” The Project Engineer shall be1

(name and address)

Any proposed change in identity of the Project Engineer on the PROJECT shall first be approved by the DIVISION before transfer of responsibility is made. Failure of the ENGINEER to abide by the above covenant may be considered basis for debarment of the ENGINEER from the DIVISION'S Roster of Prequalified Consulting Engineers as provided for under New Hampshire Code of Administrative Rules Env-Wq 603.08.

B. The ENGINEER agrees to be solely responsible for all bills or claims for payment for services rendered by others and for all services and materials employed in their work, and to indemnify and save harmless the OWNER, and all of the OWNER'S officers, agents and employees against all suits, claims or liability of every name and nature arising out of or in consequence of the negligent acts or failures to act of the ENGINEER or others employed by them in the performance of the work covered by this AGREEMENT.

C. The ENGINEER further agrees to procure and maintain at their expense such workmen's compensation insurance as is required by the statutes and public liability insurance in amounts adequate to provide reasonable protection from claims for bodily injury, death or property damage which may result from their performance and the performance of his employees under this AGREEMENT.

D. All documents, including original drawings, design calculations, work sheets, field notes, estimates, and other data shall remain the property of the OWNER, and shall be transmitted to the OWNER in clean and orderly condition on demand; however, these may be left in the possession of the ENGINEER at the OWNER'S discretion.

E. The ENGINEER shall not sublet, assign or transfer any part of the ENGINEER's services or obligations (except surveys and borings and other special services) under this AGREEMENT without the prior approval and written consent of the OWNER.

F. It is further agreed that the ENGINEER will assist the OWNER or their authorized agent in providing the DIVISION with clear documentation certifying that the necessary easements, options or outright purchases of land have been secured to provide for location of treatment works and other associated structures and equipment as shown on the contract plans or described in the specifications. Similar documentation will be submitted on approvals from the State Department of Transportation and/or other state agencies regarding location of treatment works within rights-of-way and other lands under their jurisdiction.

VI. TERMINATION

A. The OWNER shall have the right at any time for any reason whatsoever to interrupt or terminate any part of or all of the work required of the ENGINEER under this AGREEMENT, with a seven (7) day written notice of such interruption or termination transmitted to the ENGINEER by the OWNER. In the event of termination of any part of or all of this AGREEMENT, without fault on the part of the ENGINEER, the ENGINEER shall be entitled to compensation for all work performed to the satisfaction of the DIVISION and the OWNER, and pursuant to this AGREEMENT .In order that the ENGINEER shall receive payment under termination notice of any part of the work, all plans, drawings, tracings, field notes, estimates, specifications, proposals, sketches, diagrams, and calculations ,together with all other materials and data collected or prepared in connection with the PROJECT shall be transmitted to the OWNER in a form acceptable to the OWNER and DIVISION.

1 Resume clearly describing the candidate’s qualifications for the assignment is appended for convenience of reference.

ENGINEERING DESIGN PHASE CONTRACT Page 5 of 7

Rev. November 2022

IN WITNESS WHEREOF, the parties hereto have affixed their hand and seals at _______________ County, New Hampshire, the day, month, and year first above written.

ENGINEER:

By: ___________________________________ Date: ___________ (Authorized Representative2)

OWNER:

CITY OF NASHUA, NEW HAMPSHIRE

By: ___________________________________ Date: ___________ (Authorized Representative2)

APPROVED:3

DEPARTMENT OF ENVIRONMENTAL SERVICES: Water Division

By: ___________________________________ Date: ___________ (Authorized Representative2)

Approved as to form:

Town Counsel

At a meeting of the Partners/Directors of ______________________________, held on ___________, at which all the Partners/Directors were present, except __________________________________________________, it was

VOTES: That all contracts may be signed by any one of the following:

A true copy Attest: ______________________________

Place of Business: ______________________________

Date of this Contract: ______________________________

I hereby certify that I am the Clerk of ______________________________, that ______________________________ is the duly elected ______________________________, and that the above vote has not been amended or rescinded and remains in full force and effect as of this date.

Clerk ______________________________

2 Signatures should be supported by appropriate document.

3 It is agreed that as an act in furtherance of its statutory authority to approve engineering agreements for treatment works, the DIVISION's approval does not impose any contractual obligation or liability on the State of New Hampshire, the Department of Environmental Services or the Division.

ENGINEERING DESIGN PHASE CONTRACT Page 6 of 7

Rev. November 2022

Cost or Price Summary Format for Sub-agreements Under NH SAG and SRF

Part I: General Grantee/Loanee Name: Grant/Loan #:

Contractor/Subcontractor Name: Proposal Date:

Contractor/Subcontractor Address: Services Furnished:

Street name and number City/Town State ZIP

Part II: Cost Summary Direct Labor (Specify labor categories) Hours Hourly

Rate Estimated (Est.) Cost Totals

Direct Labor Total Indirect Costs (Specify indirect cost pools.) Rate X Base = Est. Cost

Indirect Costs Total Other Direct Costs Est. Cost Travel Transportation Per Diem Travel Costs Total Equipment Materials, Supplies (Specify categories.) Qty. Cost Est. Cost

Equipment Subtotal Subcontracts Est. Cost

Subcontractors…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .