1_-_Approved_FDOT_Utility_Permit_Package.pdf
PDF 23 MB Posted
- Attached to
- Regional Reuse System Phase 2 State and local contract opportunity
- Solicitation number
- 26-039
- Issued by
- Santa Rosa County, Florida
About this file
This is an FDOT Utility Permit Package issued by the Florida Department of Transportation in conjunction with Santa Rosa County for the Regional Reuse System Phase 2 project. The permit authorizes the construction, operation, and maintenance of a trenchless utility installation involving a 20-inch steel casing with a 12-inch C-900 carrier pipe designed to convey reclaimed water from Navarre Beach to Pepper Drive in Navarre, with the ultimate objective of diverting reclaimed water flow from Santa Rosa Sound. The project is located on State Road 30 in Santa Rosa County, spanning from mile post 18.90 to 18.95. The permit was approved on September 21, 2023, with permit number 2023-H-395-00298. Anticipated work commencement was required within sixty calendar days of approval, with an estimated completion timeframe of 600 calendar days. The work includes directional boring under roadway pavement, with all installation methods specified to utilize trenchless techniques rather than open-cut methods except where explicitly authorized. An FDOT representative was required to be present on the worksite prior to work commencement.
The permit incorporates comprehensive special instructions requiring the permittee (Santa Rosa County) to restore FDOT right-of-way to original or better condition upon completion, maintain clear state right-of-way for emergency evacuations during hurricane events, utilize state right-of-way for ingress and egress only, and ensure all vehicles and equipment display company identification with operating strobe lights. Multiple utility facility owners were notified of the proposed work on June 20, 2023, including AT&T Distribution, Cox Communications, Florida Power & Light, Holley Navarre Water System, MCI, Mediacom Southeast LLC, Midway Water System, Okaloosa Gas District, Quanta Telecommunication Services LLC, and Uniti Fiber LLC. The design documents, prepared by Jacobs Engineering for the 60 percent design review phase dated May 2023, include detailed plans and profiles for the reclaimed water main installation with standard construction details and traffic control provisions. No FDOT construction projects were ongoing or anticipated at the time of permit approval, and the work was not related to an approved utility work schedule.
View the file
Other files for this state and local contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rule 14-46.001 F.A.C.
FLORIDA DEPARTMENT OF TRANSPORTATION December 14, 2016
UTILITY PERMIT
PERMIT NO:__________________________________
STATE ROAD INFORMATION
County: Section: State Road No: Beginning Mile Post: Ending Mile Post:
APPLICANT INFORMATION
The Utility Agency Owner (UAO) shall be identified in this Applicant Information Box. When the UAO is a City or County and desires to have the Utility Builder make a joint permit applicant, as prescribed in Section 2.1(4) of the 2017 Utility Accommodation Manual (UAM), the Utility Builder shall also be identified in this Applicant Information Box. A Utility Builder alone cannot apply for a utility permit without the City or County adding them as a joint applicant.
Utility Agency/Owner (UAO) Utility Builder (only applicable when the UAO is a City or County) Name: _____________________________________ Name: ______________________________________
Contact Person: _____________________________________ Contact Person: ______________________________________ Address: _____________________________________ Address: ______________________________________
City: _____________________________________ City: ______________________________________ State: _____ State: _____ Zip: _________ Zip: _________
Telephone: _____________________________________ Telephone: ______________________________________ Email: ____________________________________ Email: ______________________________________
WORK DESCRIPTION
The Applicant(s) requests permission from the Florida Department of Transportation (FDOT) to construct, operate, and maintain the utilities as described below and as depicted in the incorporated documentation.
Utility Work No: ___________________________
Additional sheets are attached and are incorporated into this permit Yes No For FDEP certification, the FDOT agency report is attached in accordance with UAM Section 2.4.1 (13) Yes No
TRAFFIC CONTROL (TCP)
The TCP will comply with the following 600 series index(es) ________________________________________________________________________ A TCP has been attached and incorporated into this permit application in compliance with UAM Section 2.4.2.
MOT Technician’s contact information (may be supplied at the two (2) business day notification to FDOT):
Name: ________________________________ Telephone ________________________ Email: _______________________________
COMMENCEMENT OF WORK
The UAO and/or Utility Builder shall commence actual construction in good faith within sixty (60) calendar days after approval of the permit application. If the beginning date is more than sixty (60) calendar days from the date of approval, the UAO and/or Utility Builder must review the permit with the FDOT Approving Engineer listed to make sure no changes have occurred to the transportation facility that would affect the permit’s continued approval. The UAO and/or Utility Builder shall make good faith efforts to expedite the work and complete the work within the calendar days indicated.
Anticipated Start Date: ___________________ Calendar days needed to completed: ________
Santa Rosa
8509817100
Florida
SR 30
Santa Rosa County
10/7/2024
18.90
6051 Old Bagdad Highway
32583
The work involves a trenchless installation of a steel casing with a 12" C-900 carrier pipe for the purpose of conveying reclaimed water (RCW) from Navarre Beach to Pepper Drive in Navarre. The ultimate goal of this project is to remove the reclaimed water from flowing directly into Santa Rosa Sound.
2023-H-395-00298
58030000
Santa Rosa County
Milton michaels@santarosa.fl.gov
18.95
Approved 2023-H-395-00298
Heidi Taylor 9/21/2023
Florida Department of Transportation
UTILITY PERMIT
December 14, 2016
PERMIT NO:_________________________________
APPLICANT SIGNATURE
By the below signature(s) the UAO and/or Utility Builder agree(s) to construct, operate, and maintain the work as noted in the above Work Description, shown in plans and incorporated documents, in compliance with the UAM, all instructions noted in the FDOT Special Instructions Box, and special instructions incorporated into this permit. The UAO and/or Utility Builder declares, the location of all existing utilities that it owns or has an interest in, both aerial and underground, are accurately shown on the plans of the work areas. In accordance with UAM Section 2.8, the UAO and/or Utility Builder further declares that a letter of notification was delivered to the owners of other facilities within the work areas and that those listed below are the only facility owners known to be involved or potentially impacted by the proposed work.
Date Notified: Name of other facility owners (attach additional sheets if necessary).
Utility Agency/Owner Utility Builder (when applicable)
Signature: ____________________________ Date: ________________ Signature:___________________________ Date: _______________ Name (printed): _____________________________________________ Name (printed): __________________________________________ Title: ______________________________________________________ Title: ___________________________________________________
FDOT PROJECT INFORMATION
Pursuant to UAM Section 2.1(10), the utility work is within FDOT projects listed below and must have a Utility Work Schedule for each project approved prior to commencement of work within the FDOT project limits:
FDOT SPECIAL INSTRUCTIONS
In accordance with UAM Section 2.7, FDOT incorporates the below and attached special instructions into this permit.
Additional FDOT Special Instructions are attached and incorporated into this permit. Yes No
PERMIT APPROVAL
By signature below, FDOT gives permission to the UAO and /or Utility Builder to construct, operate, and maintain the utilities indicated in this Utility Permit in compliance with the UAM, all incorporated documents, and special instructions. Any changes to the approved work must be approved by the FDOT’s Approving Engineer and attached and incorporated into this permit in accordance with UAM Section 2.11.
Approving Engineer: _____________________________________________ Date: _______________ Name: _____________________________________________
Title:______________________________________________
Notification of Utility Work to be provided to: Telephone _____________________ or Email: _____________________________
An FDOT Representative is required to be present on the worksite prior to commencement of work. Yes No Rep. Name: _____________________________ Telephone _____________________ Email: _____________________________
9/21/2023
1) All areas under pavement will be required to be directional bored and NOT open cut/patched unless called out in the permit.
2) Permitted work does NOT include approved lane closures along State Highway.
If a lane closures is needed, submit a written request with proposed dates/times/project duration.
3) Permittee is responsible for restoring FDOT right-of-way to original or better condition after construction is complete. Permittee shall be re ... (see special instructions cont. page)
7/25/2023
(850) 981-3000 ext. ______ heidi.taylor@dot.state.fl.us
Heidi Taylor
Heidi Taylor (digital signature) seth.thomason@dot.state.fl.us
MICHAEL SCHMIDT (digital signature)
AT&T Distribution6/20/2023 Cox Communication, INC6/20/2023 Florida Power & Light - Gulf Breeze6/20/2023 Holley Navarre Water System6/20/2023
MCI6/20/2023
MICHAEL SCHMIDT
8509812704
Seth Thomason
MAINTENANCE MANAGER/PERMITS
2023-H-395-00298
There are NO FDOT constructions (proposed or underway).
This work is NOT related to an approved Utility Work Schedule.
Approved 2023-H-395-00298
Florida Department of Transportation
UTILITY PERMIT
December 14, 2016
PERMIT NO:_________________________________
CERTIFICATION
I, the undersigned UAO and/or Utility Builder, hereby CERTIFY that the utilities were constructed and inspected in compliance with the UAM all incorporated documents, and special instructions. Pursuant to UAM Section 2.11, all changes have been approved by the FDOT’s Approving Engineer and incorporated into this permit along with all other material certifications, test results, bore logs, approved plans changes, as-built plans or other required documentation.
I also CERTIFY that work began on ________________ and was completed on ________________ and that the area was left in as good or better condition than when the work began.
Utility Agency/Owner Utility Builder (when applicable)
Signature: ____________________________ Date _________________ Signature:___________________________ Date ________________ Name (printed): _____________________________________________ Name (printed): ____________________________________________ Title: ______________________________________________________ Title: ____________________________________________________
FINAL INSPECTION OF WORK
The work was inspected and found to be in non-compliance as noted below:
All issues of non-compliance listed above have been brought into compliance and/or FDOT has no outstanding issues that need to be addressed by the UAO and/or Utility Builder. However, this final inspection does not release the UAO and/or Utility Builder of their continuing responsibilities pursuant to Rule 14-46.001, the UAM, all incorporated documents, and special instructions.
FDOT Inspector: _____________________________________________ Date: _______________ Name: _____________________________________________
Title: ______________________________________________
2023-H-395-00298
Approved 2023-H-395-00298 continuation page
PERMIT NO.:
STATE ROAD INFORMATION:
NAME OF OTHER FACILITY OWNERS / DATE NOTIFIED:
FDOT PROJECT INFORMATION:
THE WORK WAS INSPECTED AND FOUND TO BE IN NON-COMPLIANCE AS NOTED BELOW:
Facility Name: Mediacom Southeast LLC, Date Notified: 6/20/2023, Facility Name: Midway Water System, Inc, Date Notified:
6/20/2023, Facility Name: Okaloosa Gas District, Date Notified: 6/20/2023, Facility Name: Quanta Telecommunication Services LLC, Date Notified: 6/20/2023, Facility Name: Uniti Fiber LLC, Date Notified: 6/20/2023
There are NO FDOT constructions (proposed or underway).
This work is NOT related to an approved Utility Work Schedule.
2023-H-395-00298
Approved 2023-H-395-00298
PERMIT NO.:
The complete special instructions could not fit in the space allotted on Page 2 of the Utility Permit so they are displayed below.
Special FDOT Instructions special instructions continuation page
1)All areas under pavement will be required to be directional bored and NOT open cut/patched unless called out in the permit.
2)Permitted work does NOT include approved lane closures along State Highway. If a lane closures is needed, submit a written request with proposed dates/times/project duration.
3)Permittee is responsible for restoring FDOT right-of-way to original or better condition after construction is complete.
Permittee shall be responsible to clean and grade ditch to the flow line of culverts and/or match adjacent existing conditions.
4)Permittee agrees to utilize State Right-of-Way for ingress/egress only. Permittee understands that State Right-of-Way is not to be used for parking and is to be kept clear of vehicles and obstacles.
5)All lanes must be open within 24 hours after notice, during an evacuation notice of a hurricane or other catastrophic event and shall remain open for the duration of the evacuation or event as directed by the local FDOT Maintenance Engineer or his designee.
6)All vehicles and equipment shall have legible company identification and operating strobe lights while present on State right-of-way.
2023-H-395-00298
Approved 2023-H-395-00298
Approved 2023-H-395-00298 this project, contact:
For information regarding
Prepared for the
Project No. D3620400
PHASE 2
REGIONAL REUSE SYSTEM
PHONE: 850-401-1236
PENSACOLA, FL 32502
SUITE 350
25 WEST CEDAR STREET,
SETH TATMAN
60% DESIGN DOCUMENTS
COUNTY COMMISSONERS
SANTA ROSA COUNTY BOARD OF
Drawings Volume 2 of 2
MAY 2023
PERMIT DRAWINGS
JUNE
Approved 2023-H-395-00298
FILENAME: PLOT DATE: PLOT TIME:2023\07\31 3:13:05 PM
T H
IS
D
O C
U M
E N
T
A N
D T
H E I
D E
A S A
N D D
E S
IG
N S I
N C
O R
P O
R A
T E
D H
E R
E
IN
A S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N A
L S
E R
V
IC
E
IS
T
H E P
R O
P E
R T
Y O
F R
E U
S E O
F D
O C
U M
E N
T S
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
A of
$PWPATH$PWURL
J A
C O
B S A
N D I S N
O T T
O B
E U
S E
D
IN
W
H O
L E O
R I
N P
A R
T F
O R A
N Y O
T H
E R P
R O J E
C T W
IT
H
O U
T T
H E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N O
F J
A C
O B
S
JACOBS 2022. ALL RIGHTS RESERVED.
D3620400
X
ANSI_D_D3620400.dgn
W
E S
T C
E D
A R S
T R
E E
T S
U
IT
E
P E
N S
A C
O L
A F
L
R E
G
IO
N A
L R
E U
S E P
H A
S E I I
L
IF
T S
T A
T
IO
N A
N D E
F F
L U
E N
T M
A
IN
S A
N T
A R
O S
A C
O U
N T
Y F
L
C O
M M
IS
S
IO
N
S A
N T
A R
O S
A C
O U
N T
Y F
L
D
E S
IG
N R
E V
IE
W
MAY 2023
G E
N E
R A
L
INDEX OF DRAWINGS
FOLLOW THE FOLLOWING GUIDELINE:
THE DRAWING NUMBERS FOR THIS PROJECT
A T L A
N T
IC
O
C E
A N
GULF
OF
M E X
IC
O
N
VICINITY MAP
NTS
NAVARRE, FLORIDA
(2 DIGITS)
SEQUENTIAL NUMBERING
SHEET TYPE (1 DIGIT)
DISCIPLINE DESIGNATOR
N - # # #
LOCATION MAP
NTS
GENERAL
CIVIL
PROCESS MECHANICAL
ELECTRICAL
INSTRUMENTATION AND CONTROL
RECLAIMED WATER MAIN
STRUCTURAL
D-203
D-202
D-201
G-012
G-011
G-010
G-009
G-008
G-007
G-006
G-005
G-004
G-003
G-002
G-001
INSTRUMENTATION AND CONTROL LEGEND SHEET 2
INSTRUMENTATION AND CONTROL LEGEND SHEET 1
ELECTRICAL LEGEND SHEET 3
ELECTRICAL LEGEND SHEET 2
ELECTRICAL LEGEND SHEET 1
HVAC LEGEND
PROCESS MECHANICAL LEGEND
STRUCTURAL NOTES SHEET 2
STRUCTURAL NOTES SHEET 1
ARCHITECTURAL LEGEND
GENERAL LEGEND AND CIVIL LEGEND AND NOTES
INDEX OF DRAWINGS
M S
T
IC
K L E
Y M S
T
IC
K L E
Y K
L D
IA
Z S T
A T
M A
N
IN
D
E X O
F D
R A
W
IN
G-001
G-001_D3620400.dgn
STANDARD DETAILS
STANDARD DETAILS
STANDARD DETAILS
STANDARD DETAILS
STANDARD DETAILS
GRADING PLAN AND SECTIONS RIB 12
GRADING PLAN AND SECTIONS RIB 11
GRADING PLAN AND SECTIONS RIB 10
GRADING PLAN AND SECTIONS RIB 9
GRADING PLAN AND SECTION RIB 8
RIB SITE DRAINAGE AREAS
RIB SITE AND YARD PIPING PLAN SHEET 2
RIB SITE AND YARD PIPING PLAN SHEET 1
EROSION CONTROL PLAN
EXISTING CONDITIONS AND SEDIMENTATION AND
ACCESS ROAD STA 0+00 TO STA 11+07
PLAN AND PROFILE STA 185+00 TO STA 195+00
PLAN AND PROFILE STA 178+00 TO STA 185+00
PLAN AND PROFILE STA 167+00 TO STA 178+00
PLAN AND PROFILE STA 157+00 TO STA 167+00
PLAN AND PROFILE STA 146+00 TO STA 157+00
PLAN AND PROFILE STA 140+00 TO STA 146+00
PLAN AND PROFILE STA 129+00 TO STA 140+00
PLAN AND PROFILE STA 122+00 TO STA 129+00
PLAN AND PROFILE STA 111+00 TO STA 122+00
PLAN AND PROFILE STA 101+00 TO STA 111+00
PLAN AND PROFILE STA 94+00 TO STA 101+00
PLAN AND PROFILE STA 84+00 TO STA 94+00
PLAN AND PROFILE STA 76+00 TO STA 84+00
PLAN AND PROFILE STA 66+00 TO STA 76+00
PLAN AND PROFILE STA 0+00 TO STA 70+00
RECLAIMED WATER MAIN KEY MAP
YARD PIPING AND DEMO PLAN
YARD PIPING AND DEMO PLAN
C-505
C-504
C-503
C-502
C-501
C-314
C-313
C-312
C-311
C-310
C-304
C-303
C-302
C-300
C-222
C-215
C-214
C-213
C-212
C-211
C-210
C-209
C-208
C-207
C-206
C-205
C-204
C-203
C-202
C-201
C-200
05-Y-202
05-Y-201
STANDARD DETAILS
STANDARD DETAILS
STANDARD DETAILS
STANDARD DETAILS
STANDARD DETAILS
STANDARD DETAILS
TERTIARY FILTERS SECTIONS
TERTIARY FILTERS PLAN VIEW
PUMP STATION SECTIONS
PUMP STATION PLAN VIEW
S-506
S-505
S-504
S-503
S-502
S-501
20-S-301
20-S-201
10-S-301
10-S-201
TERTIARY FILTRATION SECTIONS
TERTIARY FILTRATION PLAN
MANHOLES PLAN AND SECTION
PUMP STATION SECTIONS
PUMP STATION OVERALL PLAN
STANDARD DETAILS
MODIFIED ONE LINE DIAGRAM
ELECTRICAL AND GENERATOR BUILDING POWER PLAN
TERTIARY FILTERS POWER PLAN
PUMP STATION GROUDING PLAN
PUMP STATION POWER PLAN
ELECTRICAL SITE PLAN
DEMO SITE PLAN
N-001 P&ID REUSE PUMP STATION AND DIESEL ENGINE
95-E-501
80-E-201
50-E-201
20-E-201
10-E-202
10-E-201
05-E-201
05-E-101
US HWY 98 CROSSING
FDOT PERMIT TRENCHLESS INSTALLATION AND GENERAL NOTES
PLAN AND PROFILE STA 72+00 TO STA 78+00
STANDARD DETAILS
G-003 C-202 C-501
JUNE
PE
R
M
IT
D R
AW
IN
G S
R E
E
NI
G
NE LANOI
S S
E F
O R
P
ADIROL
F
ESNECIL
NA
MT
AT HTES MAILLI
W
STATE OF
No 94225
S
IG
N E
D A
N D S
E A
L E
D A
N D T
H E S
IG
N A
T U
R E M
U S
T B
E V
E R
IF
IE
D O
N A
N Y E
L E
C T
R O
N
IC
C
O P
IE
S
T H
E D
A T
E A
D J
A C
E N
T T
O T
H E S
E A
L P
R
IN
T E
D C
O P
IE
S O
F T
H
IS
D
O C
U M
E N
T A
R E N
O T C
O N
S
ID
E R
H
IS
I T
E M H
A S B
E E
N D
IG
IT
A L L
Y S
IG
N E
D A
N D S
E A
L E
D B
Y W
IL
L
IA
M S
E T
H T
A T
M A
N O
N
Approved 2023-H-395-00298
FILENAME: PLOT DATE: PLOT TIME:6/13/2023 2:16:15 PM
H
IS
D
O C
U M
E N
T
A N
D T
H E I
D E
A S A
N D D
E S
IG
N S I
N C
O R
P O
R A
T E
D H
E R
E
IN
A S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N A
L S
E R
V
IC
E
IS
T
H E P
R O
P E
R T
Y O
F R
E U
S E O
F D
O C
U M
E N
T S
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
A of pw://ProjectWiseAMER.jacobs.com:jacobs-americas-01/Documents/Santa&space;Rosa&space;County&space;FL/D3620400&space;-&space;Regional&space;Reuse&space;Phase&space;II-LS/4&space;Delivery/43&space;Sheets/CI/FDOT&space;Permit/G-002_D3620400$PWURL
J A
C O
B S A
N D I S N
O T T
O B
E U
S E
D
IN
W
H O
L E O
R I
N P
A R
T F
O R A
N Y O
T H
E R P
R O J E
C T W
IT
H
O U
T T
H E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N O
F J
A C
O B
S
JACOBS 2022. ALL RIGHTS RESERVED.
W
E S
T C
E D
A R S
T R
E E
T S
U
IT
E
P E
N S
A C
O L
A F
L
R E
G
IO
N A
L R
E U
S E P
H A
S E I I
L
IF
T S
T A
T
IO
N A
N D E
F F
L U
E N
T M
A
IN
S A
N T
A R
O S
A C
O U
N T
Y F
L
C O
M M
IS
S
IO
N
S A
N T
A R
O S
A C
O U
N T
Y F
L
D
E S
IG
N R
E V
IE
N E
R
L
T
IC
K L E
Y A K
A T
A S T
A T
M A
N C
IV
IL
L
E G
E N
D A
N D N
O T
E S
A N
D
G E
N E
R A
L L
E G
E N
D
1A
B
SECTION
SCALE
SCALE
DETAIL
1234-567
100-A-10010A1
100-S-3001
200-M-10B10A
SCALE
DRAWING TITLE
B
B
450-S-1002
B
450-S-1002
N
SECTION / DETAIL DESIGNATIONS
OR DETAIL IS TAKEN:
ON DRAWING WHERE SECTION
DESIGNATION
DETAIL (NUMERAL)
SECTION (LETTER) OR
ON SAME SHEET)
IF TAKEN AND SHOWN
(REPLACED WITH A LINE
DRAWING NUMBER
IS SHOWN:
ON DRAWING WHERE SECTION
DRAWING NUMBER(S)
WHERE TAKEN
IS SHOWN:
ON DRAWING WHERE DETAIL
WHERE TAKEN
DRAWING NUMBER(S)
REFERENCE (eg: ELEVATIONS)
TITLE IS REQUIRED WITH NO
ON DRAWING WHERE ONLY A
EXTENDS TO A FIXED LIMIT
IS ON THE SAME SHEET AND CUT
SECTION CALLOUT WHERE SECTION
EXTENDS THROUGHOUT ENTIRE SHEET
IS ON ANOTHER SHEET AND CUT
SECTION CALLOUT WHERE SECTION
WITH PROJECT NORTH
TO INCLUDE MAGNETIC NORTH ALONG
NORTH ARROW; CAN BE MODIFIED
KEYNOTE NUMBER
(NUMERAL)
DESIGNATION
DESIGN DETAIL
DETAIL DRAWING(S)
SHOWN ON DESIGN
DETAIL DESIGNATION IS NOT SHOWN
ALL DESIGN DETAILS ARE TYPICAL AND MUST BE USED IF DESIGN
AND REFERS TO THE DESIGN DETAILS FOUND IN THIS SET OF CONTRACT DOCUMENTS.
THE TERM STANDARD DETAIL, OR A FORM OF IT, IS SYNOMONOUS WITH DESIGN DETAIL
SPECIFICALLY REFERENCED OR NOT.
ACCORDANCE WITH THE DESIGN DETAILS SHOWN WHETHER THE DETAILS ARE
REQUIRED THROUGHOUT THE PROJECT. ALL ASSOCIATED WORK SHALL BE IN
THE DESIGN DETAILS REPRESENT THE CHARACTER AND NATURE OF THE WORK 3.
2.
1.
NOTES:
DESIGN DETAIL DESIGNATION
REVISION / ADDENDA NUMBER
GRID LINE INDICATOR
WHERE SHOWN
DRAWING NUMBER
GENERAL NOTE:
1.
CIVIL LEGEND
SPOT ELEVATION
CONTOUR LINE
DRAINAGEWAY OR DITCH
158.5
EMBANKMENT AND SLOPE3:1
SIGNOR
MANHOLE
POST OR GUARD POST
UTILITY POLE
CENTER LINE, BUILDING, ROAD, ETC.
LOCATION POINT - COORDINATES
STRUCTURE, BUILDING OR FACILITYN 1000.00
E 1000.00
LIGHT POLE
GUY ANCHOR
TREE
BRUSH/TREE LINE
STRUCTURE, BUILDING OR FACILITYOR
ASPHALT CONCRETE PAVEMENT
DEMOLITION
GUARD RAIL
OR
CHAIN LINK FENCE
CATCH BASIN OR INLET
TRENCH DRAIN
PROPERTY LINE
STAGING OR WORK AREA LIMITS
BORING LOCATION AND NUMBER
TEST PIT LOCATION AND NUMBER
PIEZOMETER LOCATION AND NUMBER
CURB
CURB AND GUTTER
SINGLE SWING GATE
DOUBLE SWING GATE
SLIDING GATE
B-1
TP-2
P-3T
SHOWN MAY BE USED ON THIS PROJECT.
THEREFORE, NOT ALL OF THE INFORMATION
THIS IS A STANDARD LEGEND SHEET.
SURVEY NOTES
CIVIL NOTES
EROSION AND SEDIMENT CONTROL NOTES
CONCRETE PAVEMENT/SIDEWALK
STABILIZATION OR RIPRAP
GRAVEL SURFACING OR LIMEROCK
SEDIMENT FENCE
BENCHMARK
SURVEY CONTROL POINT OR
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
ARROWS ARE DIRECTION OF FLOW
WETLAND BOUNDARIES
ROADWAY CROSS DRAIN
CONTRACTOR'S EXPENSE.
PERFORM THE WORK TO PRODUCE THE SAME LEVEL OF ACCURACY AS THE ORIGINAL MONUMENT(S) IN A TIMELY MANNER, AND AT THE
MAINTAIN, RELOCATE, OR REPLACE EXISTING SURVEY MONUMENTS, CONTROL POINTS, AND STAKES WHICH ARE DISTURBED OR DESTROYED.
AND SITE FEATURES ARE SHOWN HEAVY-LINED.
EXISTING TOPOGRAPHY, STRUCTURES, AND SITE FEATURES ARE SHOWN SCREENED AND/OR LIGHT-LINED. NEW FINISH GRADE, STRUCTURES, ADJUST WORK PLAN ACCORDINGLY PRIOR TO BEGINNING CONSTRUCTION.
EXISTING CONDITIONS MAY VARY FROM THOSE SHOWN ON THESE PLANS. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND
POINTS TO ESTABLISH VERTICAL AND HORIZONTAL CONTROL. NOTIFY ENGINEER IMMEDIATELY IF DISCREPANCIES ARE ENCOUNTERED.
THE DRAWINGS INCLUDE A TABLE OF CONTROL POINTS AND BENCHMARKS. ON C-110 CONTRACTOR SHALL USE AT LEAST THREE OF THE
OF 1983 (1990 ADJUSTMENT).
THE PROJECT HORIZONTAL DATUM IS REFERENCED TO THE FLORIDA NORTH STATE PLANE COORDINATE SYSTEM, NORTH AMERICAN DATUM
THE PROJECT VERTICAL DATUM IS BASED ON THE NORTH AMERICAN DATUM OF 1988.
MAPPING (850-916-7382).
THE TOPOGRAPHIC SURVEY, DATED 03/16/2023; SERVING AS THE BASE MAP FOR THE PROJECT WAS PREPARED BY RUBEN SURVEYING &
7.
6.
5.
4.
3.
2.
1.
ACCORDANCE WITH LOCAL AND STATE REGULATIONS.
NO DEBRIS OR CONSTRUCTION MATERIALS WILL BE BURIED OR DISPOSED OF ONSITE. ALL SUCH MATERIAL SHALL BE DISPOSED OF IN
CABLES, ETC. AS A RESULT OF THE CONSTRUCTION ACTIVITIES.
THE CONTRACTOR SHALL REPAIR AND RESTORE EXISTING PAVEMENT, SIDEWALKS, CURBS, DRIVEWAYS, PIPES, IRRIGATION LINES, CONDUIT, SIMILAR STRUCTURES WITHIN PAVED AREAS TO MATCH FLUSH WITH FINISHED GRADE.
CONTRACTOR TO ADJUST ALL EXISTING UTILITY CASTINGS INCLUDING VALVE BOXES, MANHOLES, HAND HOLES, PULL BOXES, INLETS AND
CONTRACTOR SHALL NOT DISTURB AREAS OUTSIDE EXISTING RIGHTS-OF-WAY OR TEMPORARY CONSTRUCTION EASEMENTS.
ALL PIPES SHALL HAVE A CONSTANT SLOPE BETWEEN INVERT ELEVATIONS UNLESS A FITTING IS SHOWN.
UNLESS OTHERWISE SHOWN ALL PIPING SHALL HAVE A MINIMUM OF 3 FEET COVER.
LOCATION PRIOR TO EXCAVATION. PROTECT ALL EXISTING UTILITIES DURING CONSTRUCTION.
EXISTING UNDERGROUND UTILITIES OBTAINED FROM AS-BUILTS AND FROM FIELD SURVEY. CONTRACTOR SHALL FIELD VERIFY DEPTH AND
SHOWN.
ELEVATIONS GIVEN ARE TO FINISH GRADE UNLESS OTHERWISE SHOWN. SLOPE UNIFORMLY BETWEEN CONTOURS AND SPOT ELEVATIONS AS
ARE TO THE OUTERWALL OR EDGE OF PAD. COORDINATES FOR STORMWATER INLETS AND MANHOLES ARE TO THE CENTER OF STRUCTURE.
COORDINATES AND DIMENSIONS SHOWN FOR ROADWAY IMPROVEMENTS ARE TO THE EDGE OF PAVEMENT. COORDINATES FOR STRUCTURES
FOR OBTAINING ADDITIONAL WORK AREAS AS NECESSARY TO COMPLETE CONSTRUCTION.
THE TEMPORARY ENTRANCE ROAD AND CONTRACTOR STAGING AREA AFTER CONSTRUCTION IS COMPLETE. CONTRACTOR IS RESPONSIBLE
PROVIDE TEMPORARY FENCING AS NECESSARY TO MAINTAIN SECURITY AT ALL TIMES. CONTRACTOR SHALL RESTORE AND SEED AND MULCH
WORK AREAS SHOWN SHALL BE FOR CONTRACTOR'S EMPLOYEE PARKING, CONTRACTOR'S TRAILERS AND ON-SITE STORAGE OF MATERIALS.
EXISTING LEGEND.
SURVING & MAPPING FOR
PREPARED BYRUBEN
TOPOGRAPHIC SURVEY
ARESHOWN SCREENED. SEE
OTHER AS-BUILT SITE FEATURES
EXISTING TOPOGRAPHY AND
G-002
G-002_D3620400.dgn
TREAT THE SEDIMENT.
FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR
EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE
REACHED ONE-HALF THE HEIGHT OF THE FENCE.
AND TO SEE THAT THE FENCE POSTS ARE FIRMLY IN THE GROUND. BUILT UP SEDIMENT SHALL BE REMOVED FROM SILT FENCE WHEN IT HAS
SILT FENCE SHALL BE INSPECTED FOR DEPTH OF SEDIMENT, TEARS, TO SEE IF THE FABRIC IS SECURELY ATTACHED TO THE FENCE POSTS, CONTRACTOR SHALL INSPECT EROSION AND SEDIMENT CONTROL MEASURES EACH DAY TO ENSURE THAT THEY ARE WORKING PROPERLY.
REPLACED IF FOUND TO BE DEFECTIVE.
EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED AFTER EACH RAIN EVENT, AND SHALL BE IMMEDIATELY REPAIRED OR
ACHIEVED.
EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED AT ALL TIMES UNTIL PERMANENT STABILIZATION OF THE SITE IS
FEDERAL REGULATIONS.
ALL SPILLS WILL BE CLEANED UP IMMEDIATELY UPON DISCOVERY. ALL SPILLS WILL BE REPORTED AS REQUIRED BY LOCAL, STATE AND
SAWDUST AND PROPERLY LABELED PLASTIC AND METAL WASTE CONTAINERS.
MATERIALS AND EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO BROOMS, DUSTPANS, MAPS, RAGS, GLOVES, GOGGLES, CAT LITTER, SAND, TO SITE PERSONNEL. MATERIAL AND EQUIPMENT NECESSARY FOR SPILL CLEANUP WILL BE KEPT IN THE MATERIAL STORAGE AREAS. TYPICAL
LOCAL, STATE AND MANUFACTURER'S METHODS FOR SPILL CLEANUP WILL BE CLEARLY POSTED AND PROCEDURES WILL BE MADE AVAILABLE
STRUCTURAL PRACTICES SHOULD BE PLACED ON UPLAND SOILS TO THE DEGREE ATTAINABLE.
INCLUDE SILT FENCES, EARTH DIKES, DRAINAGE SWALES, SEDIMENT TRAPS, CHECK DAMS, AND STORM DRAIN INLET PROTECTION.
RUNOFF AND THE DISCHARGE OF POLLUTANTS FROM EXPOSED AREAS OF THE SITE TO THE DEGREE ATTAINABLE. SUCH PRACTICES MAY
STRUCTURAL PRACTICES SHALL BE IMPLEMENTED TO DIVERT FLOWS FROM EXPOSED SOILS AND STORM DRAINS OR OTHERWISE LIMIT
THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED.
TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF
STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE
TREES, AND OTHER APPROPRIATE MEASURES.
STABILIZATION MEASURES MAY INCLUDE: TEMPORARY SEEDING, PERMANENT SEEDING, MULCHING, SOD STABILIZATION, PROTECTION OF
SITE WORK SHALL ENSURE THAT EXISTING VEGETATION IS PRESERVED AND THAT DISTURBED PORTIONS OF THE SITE ARE STABILIZED.
SHALL INFORM THE OWNER AND ENGINEER AND IMPLEMENT ADDITIONAL CONTROL MEASURES AS REQUIRED.
IF ADDITIONAL EROSION CONTROL MEASURES ARE REQUIRED TO PREVENT OFFSITE MIGRATION OF STORMWATER RUNOFF, THE CONTRACTOR
STORMWATER, EROSION, AND SEDIMENT CONTROL INSPECTOR'S MANUAL.
CONTRACTOR SHALL IMPLEMENT, INSPECT, AND DOCUMENT EROSION CONTROL MEASURES IN ACCORDANCE WITH THE FLORIDA
62-621.300[4][B]), AND PROCESSING FEE.
PERMIT DOCUMENTATION INCLUDING A SITE SPECIFIC STORMWATER POLLUTION PREVENT PLAN, NOTICE OF INTENT (FDEP FORM
CONSTRUCTION ACTIVITIES (FDEP DOCUMENT 62-621.300[4][A]). THE CONTRACTOR SHALL PREPARE AND SUBMIT THE SUPPORTING GENERIC
CONTRACTOR SHALL PREPARE AND OBTAIN APPROVAL FOR A GENERIC PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
S T
A T
M A
N
PE
R
M
IT
D R
AW
IN
G S
JUNE
R E
E
NI
G
NE LANOI
S S
E F
O R
P
ADIROL
F
ESNECIL
NA
MT
AT HTES MAILLI
W
STATE OF
No 94225
S
IG
N E
D A
N D S
E A
L E
D A
N D T
H E S
IG
N A
T U
R E M
U S
T B
E V
E R
IF
IE
D O
N A
N Y E
L E
C T
R O
N
IC
C
O P
IE
S
T H
E D
A T
E A
D J
A C
E N
T T
O T
H E S
E A
L P
R
IN
T E
D C
O P
IE
S O
F T
H
IS
D
O C
U M
E N
T A
R E N
O T C
O N
S
ID
E R
IS
I T
E M H
A S B
E E
N D
IG
IT
A L L
Y S
IG
N E
D A
N D S
E A
L E
D B
Y W
IL
L
IA
M S
E T
H T
A T
M A
N O
N
Approved 2023-H-395-00298
FILENAME: PLOT DATE: PLOT TIME:6/13/2023 2:16:14 PM
H
IS
D
O C
U M
E N
T
A N
D T
H E I
D E
A S A
N D D
E S
IG
N S I
N C
O R
P O
R A
T E
D H
E R
E
IN
A S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N A
L S
E R
V
IC
E
IS
T
H E P
R O
P E
R T
Y O
F R
E U
S E O
F D
O C
U M
E N
T S
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
A of pw://ProjectWiseAMER.jacobs.com:jacobs-americas-01/Documents/Santa&space;Rosa&space;County&space;FL/D3620400&space;-&space;Regional&space;Reuse&space;Phase&space;II-LS/4&space;Delivery/43&space;Sheets/CI/FDOT&space;Permit/G-003_D3620400$PWURL
J A
C O
B S A
N D I S N
O T T
O B
E U
S E
D
IN
W
H O
L E O
R I
N P
A R
T F
O R A
N Y O
T H
E R P
R O J E
C T W
IT
H
O U
T T
H E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N O
F J
A C
O B
S
JACOBS 2022. ALL RIGHTS RESERVED.
W
E S
T C
E D
A R S
T R
E E
T S
U
IT
E
P E
N S
A C
O L
A F
L
R E
G
IO
N A
L R
E U
S E P
H A
S E I I
L
IF
T S
T A
T
IO
N A
N D E
F F
L U
E N
T M
A
IN
S A
N T
A R
O S
A C
O U
N T
Y F
L
C O
M M
IS
S
IO
N
S A
N T
A R
O S
A C
O U
N T
Y F
L
D
E S
IG
N R
E V
IE
N E
R
L
T
IC
K L E
Y A K
A T
A S T
A T
M A
N
G-002
G-003_D3620400.dgn
S T
A T
M A
N
NOTES FOR INSTALLATION OF MAIN WITHIN FDOT ROW USING THE HDD METHOD
REAMER SHALL MEET REQUIREMENTS OF 2017 UAM 3.16.9.1.
COMPLETED.
WHEN BORING UNDER A ROADWAY PAVEMENT, INSTALL THE PRODUCT INTO A BORE HOLE WITHIN THE SAME DAY THAT THE PRE BORE IS
KEEP DRILLING PIPE IN THE BORE HOLE UNTIL THE FINAL PRODUCT IS PULLED BACK INTO PLACE.
PREVENT HEAVING DURING PULL BACK.
UTILIZE RELIEF HOLES AS NECESSARY TO RELIEVE EXCESS PRESSURE DOWN HOLE.
DETERMINE ORIENTATION AND TRACKING OF THE DRILL BIT.
FAILED.
PHYSICALLY EXPOSED BEGINNING AND END POINTS OF THE BORE AND OTHER EXPOSED POINTS ALONG THE PATH AND INDICATE IF THE BORE
E) A PLAN VIEW OF THE BORE PATH SHOWING DEPTHS AND OFFSET DIMENSIONS TO AN ACCURACY OF WITHIN ONE (1) INCH OF THE
MATERIALS USED TO FILL THE ANNULAR VOID BETWEEN THE BORE AND THE UTILITY DIAMETER, OR UTILITIES PLACED OUT OF SERVICE.
D) THE DETECTION METHOD USED, BORE DIAMETER, UTILITY DIAMETER, DRILLING FLUID COMPOSITION, COMPOSITION OF ANY OTHER
C) A TIE TO A PERMANENT STRUCTURE OR A STATION WHEN WITHIN AN FDOT CONSTRUCTION PROJECT.
B) NAME OF PERSON COLLECTING DATA, INCLUDING TITLE, POSITION AND COMPANY NAME.
IDENTIFICATION (FPID) NUMBER.
CONSTRUCTION PROJECT INCLUDE THE FINANCIAL PROJECT A) UTILITY PERMIT NUMBER. IF THE UTILITY WORK WAS DONE DURING AN FDOT
SHALL INCLUDE ALL OF THE FOLLOWING:
SUBMIT A BORE LOG TO FDOT WITHIN SEVEN (7) DAYS OF THE COMPLETION OF EACH SUCCESSFUL OR FAILED BORE PATH. THE BORE LOG
DIRECTIONAL DRILLING UNDER ROADWAY PAVEMENT MAINTAIN THE DEPTHS IN UAM SECTION 3.16.9.1.
MAINTAIN THE DEPTH OF THE UTILITY EQUAL TO OR GREATER THAN THOSE IN UAM SECTION 3.16.4, ADDITIONALLY WHEN USING HORIZONTAL
BORINGS.
PLAN SHOWING HOW DAMAGE TO THE ROADWAY OR A FAILED OPERATION WILL BE REMEDIED BEFORE PROCEEDING WITH ANY FURTHER
NOTIFY FDOT IMMEDIATELY OF ANY FAILED BORE OR HUMPING/SAGGING OF THE ROADWAY. SUBMIT, FOR APPROVAL BY FDOT, A REMEDIATION
CLEAN THE WORK SITE OF ALL EXCESS SLURRY OR SPOILS WITHIN FORTY-EIGHT (48) HOURS OF COMPLETING INSTALLATION OF THE UTILITY.
DURING DRILLING OPERATIONS.
CONTAIN DRILLING FLUIDS IN SLURRY PITS, ENTRY OR EXIT POINTS UNTIL THEY ARE RECYCLED OR REMOVED FROM THE SITE OR VACUUMED
GROUNDWATER AND EARTH PRESSURES.
CONTROL THE PUMPING RATE, PRESSURES, VISCOSITY AND DENSITY TO PROVIDE REMOVAL OF SOIL CUTTINGS AND TO BALANCE
OBSERVATION HOLES WHEN USED.
PRIOR TO STARTING DRILLING OPERATIONS, IDENTIFY ANY AREAS OF EXCAVATION SUCH AS ENTRY POINTS, SLURRY PITS, RELIEF AND/OR
APPROVAL BY FDOT.
PRIOR TO UTILIZING WATER AND BEFORE CHANGING WATER SOURCES IDENTIFY THE SOURCE OF WATER FOR MIXING DRILLING FLUIDS FOR
BORE PATH.
DRILLING FLUIDS ARE ENVIRONMENTALLY SAFE AND NOT HARMFUL OR CORROSIVE TO ANY OF THE UNDERGROUND FACILITIES ALONG THE
PRIOR TO STARTING DRILLING OPERATIONS, IDENTIFY TO FDOT ALL DRILLING FLUIDS TO BE USED AND PROVIDE A CERTIFICATION THAT THESE
CONTRACTOR SHALL BE REQUIRED TO DO ALL OF THE FOLLOWING:
15.
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
GENERAL NOTES FOR INSTALLATION OF MAIN WITHIN FDOT ROW
6.
5.
4.
3.
2.
1.
BACKFILL ABOVE THE PIPE ZONE ALONG WITH SURFACE RESTORATION SHALL MEET THE REQUIREMENTS OF THE FDOT DESIGN MANUAL.
CONTRACTOR SHALL NOTIFY SUNSHINE 811 PRIOR TO ANY EXCAVATION.
AND RESTORATION SHALL BE PERFORMED IN ACCORDANCE WITH THE FDOT DESIGN MANUAL.
CONTRACTOR SHALL RESTORE RIGHT OF WAY WITHIN 72-HOURS IN AN ONGOING BASIS AFTER INSTALLATION OF PIPE SEGMENTS. BACKFILL
INSTALLATION.
ALL PROPOSED UTILITY IMPROVEMENTS TO BE INSTALLED VIA OPEN CUT SHALL BE ELECTRONICALLY DETECTABLE UPON COMPLETED
CONTRACTOR SHALL NOT EXCAVATE CLOSER THAN 8 FEET FROM THE EXISTING US HWY 98 EDGE OF PAVEMENT.
PROVIDED CONTINUOUS ACCESS TO THEIR PROPERTY AT ALL TIMES.
BE NOTIFIED IN ADVANCE USING DOOR-HANGER TYPE NOTICES OR ON-SITE SIGNS AS APPROPRIATE AND APPROVED. OWNERS SHALL BE
CONTRACTOR SHALL CONTACT ANY PROPERTY OWNERS AT LEAST 7 DAYS PRIOR TO OPEN CUTTING A DRIVEWAY. PROPERTY OWNERS SHALL
A N
D G
E N
E R
A L N
O T
E S
T R
E N
C H
L E
S S I
N S
T A
L L
A T
IO
N
F D
O T P
E R
M
IT
PE
R
M
IT
D R
AW
IN
G S
JUNE
R E
E
NI
G
NE LANOI
S S
E F
O R
P
ADIROL
F
ESNECIL
NA
MT
AT HTES MAILLI
W
STATE OF
No 94225
S
IG
N E
D A
N D S
E A
L E
D A
N D T
H E S
IG
N A
T U
R E M
U S
T B
E V
E R
IF
IE
D O
N A
N Y E
L E
C T
R O
N
IC
C
O P
IE
S
T H
E D
A T
E A
D J
A C
E N
T T
O T
H E S
E A
L P
R
IN
T E
D C
O P
IE
S O
F T
H
IS
D
O C
U M
E N
T A
R E N
O T C
O N
S
ID
E R
IS
I T
E M H
A S B
E E
N D
IG
IT
A L L
Y S
IG
N E
D A
N D S
E A
L E
D B
Y W
IL
L
IA
M S
E T
H T
A T
M A
N O
N
Approved 2023-H-395-00298
75+10 75+50 76+00 76+5076+70
20" STL CASING W/
12" C-900 CARRIER
R/W R/W R/W
R/W R/W R/W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R/WR/W
R/W R/W R/W
R/W
JE-B1075+00 76+00 77+00
PRESCOTT RICHARD HANSEL
0.4' 9.0'
5.6' 7.9' 10.6' 12.3'
16.5' 6.4'
6.4' 6.1' 11.1'
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
R /W
FILENAME: PLOT DATE: PLOT TIME:$PLOTDATE $PLOTTIME
JACOBS 2022. ALL RIGHTS RESERVED.
JA
C
O B
S A
N D
IS
N
O T
TO
B
E U
S E
D , I
N W
H O
LE
O
R
IN
P A
R T, F O
R A
N Y
O
TH
E R
P R
O
JE
C T
W
IT
H O
U T
TH
E
W R
IT
TE
N A
U
TH
O R
IZ
A
TI
O
N O
F
JA
C O
B S
TH
IS
D
O C
U M
E N
T, A
N D
T H
E
ID
E A
S A
N D
D E
S
IG
N S
IN
C
O R
P O
R A
TE
D
H E
R E
IN
, A
S A
N
IN
S
TR
U M
E N
T O
F P
R O
FE
S
S
IO
N A
L S
E R
V
IC
E , I
S T
H E
P R
O P
E R
TY
O
F R
E U
S E
O F
D O
C U
M E
N
TS
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
TE
N
O
D S
G N
D R
R E
V
IS
IO
N
C H
K A
P V
D B
Y A
P V
D
SHEET
DWG
A
R E
G
IO
N A
L R
E U
S E
P H
A S
E
II
LI
FT
S
TA
TI
O
N A
N D
E
FF
LU
E
N T
M A
IN
S A
N
TA
R O
S A
C O
U N
TY
(F
L) C
O M
M
IS
S
IO
N of
$PWPATH$PWURL
MAY 2023
D3620400
XX 60
D E
S
IG
N R
E V
IE
W
W
E S
T C
E D
A R
S
TR
E E
T, S
U
IT
E
P
E N
S A
C O
LA
, F
L
S A
N
TA
R O
S A
C O
U N
TY
, F
L
C
IV
IL
P
LA
N A
N D
P R
O
FI
LE
S
TA
0+
T O
S
TA
0+
C-202
ZFDOT05-C-202_D3620400.dwg
0 40' 80' 120'
1"=40'
PLAN
1" = 40'-0"
N
INSTALLED BY TRENCHLESS METHOD
12" RCW
S R
1. COORDINATE WITH ALL PROPERTY OWNERS TO MAINTAIN
ACCESS TO THEIR PROPERTY AS NEEDED. TEMPORARY
CLOSURE OF ROADWAY MAY BE REQUIRED TO INSTALL 12"
RCW. IF ACCESS CANNOT BE MAINTAINED, PROVIDE
ALTERNATE ACCOMMODATIONS UNTIL ACCESS CAN BE
RESTORED. SEE 01_31_13 FOR PROJECT COORDINATION.
2. RESURFACE FULL LENGTH OF BLUE TIP DRIVE UP TO STATE
RIGHT-OF-WAY WITHIN TWO WEEKS OF COMPLETED
INSTALLATION OF 12" RCW.
3. WORK AREA LIMITED TO ROW FOR BLUE TIP DRIVE.
CONTRACTOR IS REQUIRED TO ACQUIRE AND COORDINATE
ADDITIONAL WORK AREA IF NEEDED. CONTRACTOR SHALL
NOT IMPEDE THE FLOW OF TRAFFIC ALONG US HWY 98.
4. PROPOSED WORK SHAFT. CONTRACTOR TO DETERMINE THE
ACTUAL SIZE AND SHAPE AS REASONABLY NEEDED FOR
CONSTRUCTION.
5. 20" STEEL CASING. INSTALL USING HORIZONTAL AUGER
BORING.
6. EXTEND STEEL CASING A MINIMUM OF 2-FT INTO THE WORK
SHAFT.
7. CONTRACTOR IS RESPONSIBLE FOR REPAIR AND
RESURFACING OF ROADWAY IN THE EVENT OF DAMAGE TO
PAVEMENT OR SUB BASE.
8. ALL WORK TO BE COMPLETED OUTSIDE OF FDOT ROW.
GENERAL NOTES
GAS
STA 75+22.7
2.5' DEPTH
UTILITY LINE
STA 75+09.5
3.0' DEPTH
CABLE LINE
STA 75+15.8
2.5' DEPTH
CABLE LINE
STA 75+18.2
2.5' DEPTH
CABLE LINE
STA 76+53.3
5.0' DEPTH
UTILITY LINE
STA 76+63.5
13.0' DEPTH
FDOT ROW
12" RCW
20" STL CASING
FOR 12" RCW
FDOT ROW
STL CASING
STA 75+12
4.8' DEPTH
STL CASING
STA 76+74
6.8' DEPTH
STL CASING AT CL
STA 75+75
5.8' DEPTH
PE
R
M
IT
D R
AW
IN
G S
JUNE
R E
E
NI
G
NE LANOI
S S
E F
O R
P
ADIROL
F
ESNECIL
NA
MT
AT HTES MAILLI
W
STATE OF
No 94225
S
IG
N E
D A
N D S
E A
L E
D A
N D T
H E S
IG
N A
T U
R E M
U S
T B
E V
E R
IF
IE
D O
N A
N Y E
L E
C T
R O
N
IC
C
O P
IE
S
T H
E D
A T
E A
D J
A C
E N
T T
O T
H E S
E A
L P
R
IN
T E
D C
O P
IE
S O
F T
H
IS
D
O C
U M
E N
T A
R E N
O T C
O N
S
ID
E R
IS
I T
E M H
A S B
E E
N D
IG
IT
A L L
Y S
IG
N E
D A
N D S
E A
L E
D B
Y W
IL
L
IA
M S
E T
H T
A T
M A
N O
N
8. ALL OPEN CUT WORK THE BE COMPLETED OUTSIDE OF FDOT
ROW
Approved 2023-H-395-00298
FILENAME: PLOT DATE: PLOT TIME:6/13/2023 2:16:17 PM
H
IS
D
O C
U M
E N
T
A N
D T
H E I
D E
A S A
N D D
E S
IG
N S I
N C
O R
P O
R A
T E
D H
E R
E
IN
A S A
N I
N S
T R
U M
E N
T O
F P
R O
F E
S S
IO
N A
L S
E R
V
IC
E
IS
T
H E P
R O
P E
R T
Y O
F R
E U
S E O
F D
O C
U M
E N
T S
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D A
T E
N O
D S
G N
D R
R E
V
IS
IO
N
C H
K
A P
V D
B Y
A P
V D
SHEET
DWG
A of pw://ProjectWiseAMER.jacobs.com:jacobs-americas-01/Documents/Santa&space;Rosa&space;County&space;FL/D3620400&space;-&space;Regional&space;Reuse&space;Phase&space;II-LS/4&space;Delivery/43&space;Sheets/CI/FDOT&space;Permit/05-C-501_D3620400$PWURL
J A
C O
B S A
N D I S N
O T T
O B
E U
S E
D
IN
W
H O
L E O
R I
N P
A R
T F
O R A
N Y O
T H
E R P
R O J E
C T W
IT
H
O U
T T
H E W
R
IT
T E
N A
U T
H O
R
IZ
A T
IO
N O
F J
A C
O B
S
JACOBS 2022. ALL RIGHTS RESERVED.
W
E S
T C
E D
A R S
T R
E E
T S
U
IT
E
P E
N S
A C
O L
A F
L
R E
G
IO
N A
L R
E U
S E P
H A
S E I I
L
IF
T S
T A
T
IO
N A
N D E
F F
L U
E N
T M
A
IN
S A
N T
A R
O S
A C
O U
N T
Y F
L
C O
M M
IS
S
IO
N
S A
N T
A R
O S
A C
O U
N T
Y F
L
D
E S
IG
N R
E V
IE
T
IC
K L E
Y
C-501
A N
D A
R D D
E T
A
IL
C
IV
IL
05-C-501_D3620400.dgn
NTS
ASPHALT PAVEMENT SECTION
MINIMUM LBR 40
AS DETERMINED BY FM T-180, METHOD D,
12" TYPE B STATBILIZATION, 98% MAX DENSITY
8" LIMEROCK OR 9" GAB
3" SP 12.5
1-1/4" FC 9.5
NTS
TYPICAL TRENCH
MIN WIDTH
PIPE ZONE
PIPE OD+1'-6"
PIPE ZONE
ABOVE
BACKFILL
TRENCH
SEE PLANS
RESTORATION,
OR SURFACE
NEW SURFACING,
12" MIN
DIAMETER
PIPE OUTSIDE
WHERE REQD
STABILIZATION
TRENCH
SPECIFIED
TAPE AS
MARKING
COVER (SEEDING)
DEPTH OF
NOTES:
REQUIREMENTS WILL VARY BASED UPON THE LOCATION.
SHALL MEET THERE REQUIREMENTS OF FDOT.
TRENCH BACKFILL ABOVE THE PIPE ZONE 1.
BASE COURSE
AC PAVEMENT
LEVELING COURSE
ASPHALT SURFACING
1'-0" MIN
SEE NOTE 1
d /3 d d /3
EXISTING CONCRETE
PCC CONCRETE SURFACING
1'-0" MIN
NOTES:
SURFACE RESTORATION
NTS
ABOVE PIPE ZONE
TRENCH BACKFILL
EDGE, TYP
JACKHAMMERED
COURSE
COMPACTED BASE
ABOVE PIPE ZONE
TRENCH BACKFILL
PRIOR TO PAVING
SAW CUT JUST
SAWCUT, TYP
TRENCHING
CUT PRIOR TO
AC PAVEMENT SECTION
CONCRETE
EXISTING ASPHALT
IF SPECIFIED
PRIME COAT,
COAT, IF SPECIFIED
SEAL AND COVER
SEE NOTE 2
PCC CONCRETE,
SECTION
CONC PAVEMENT
RESTORATION REQUIREMENTS
SEE SPECIFICATION FOR ASPHALT, CONCRETE, AND GRAVEL SURFACING
FOR GRAVEL SEE 3215-260.
TYPES AND LOCATIONS.
CONSTRUCT JOINTS ACROSS NEW CONCRETE TO MATCH EXISTING JOINT
OR EDGE OF CONCRETE, REPLACE ENTIRE CONCRETE TO THE JOINT OR EDGE.
IF LOCATION OF TRENCH SAW CUT IS WITHIN 2 FEET OF AN EXISTING JOINT
4.
3.
2.
1. AREA DRAIN
CURB INLET
NTS
NOTE:
EQUIVALANT FORM OF INLET PROTECTION.
CONTRACTOR MAY ELECT TO USE AN
BIOFILTER INLET BARRIER
PHASING OF DEVELOPMENT
WITH UTILITY WORK AND WITH
MAY BE USED SHORT TERM
SECTION
PLAN
RECOMMENDATIONS
PER MANUFACTURER
6' MAX SPACING,
SPECIFIED
CASING, AS
SPECIFIED
PIPELINE, AS
TYP
STEEL BAND,
STAINLESS
AS SPECIFIED, TYP
CASING SPACER
LENGTH OF CASING
AS INDICATED ON PLANS
TYP
AS SPECIFIED,
END SEAL
LINER
SPACER SHELL AND
INSULATED CASING
SPECIFIED
CASING, AS
TYP
RUNNER,
BUTT WELDED JOINTS
STEEL CASING WITH
AS SPECIFIED
CASING BACKFILL,
NOTES:
PIPE IS AT THE ELEVATIONS SHOWN ON THE PLAN AND PROFILE.
TO THE CASING SPACER RISER AND RUNNER DIMENSIONS SO THAT THE CARRIER
THE PLAN AND PROFILE. INSTALL THE CASING AT THE ELEVATIONS CORRESPONDING
ALLOW INSTALLATION OF THE CARRIER PIPE AT THE ELEVATIONS SHOWN ON
MINIMUM CLEARANCE BETWEEN THE CONDUIT AND THE CASING, AND TO
PROVIDE 2" MINIMUM CLEARANCE BETWEEN THE PIPE AND THE CASING, 2"
RECOMMENDED BY THE CASING SPACER MANUFACTURER, AS REQUIRED TO
1. THE DIMENSIONS OF CASING SPACER RISERS AND RUNNERS SHALL BE AS
CASED UNDERCROSSING
NTS
S T
A T
M A
N A K
A T
A S T
A T
M A
N
PE
R
M
IT
D R
AW
IN
G S
JUNE
R E
E
NI
G
NE LANOI
S S
E F
O R
P
ADIROL
F
ESNECIL
NA
MT
AT HTES MAILLI
W
STATE OF
No 94225
S
IG
N E
D A
N D S
E A
L E
D A
N D T
H E S
IG
N A
T U
R E M
U S
T B
E V
E R
IF
IE
D O
N A
N Y E
L E
C T
R O
N
IC
C
O P
IE
S
T H
E D
A T
E A
D J
A C
E N
T T
O T
H E S
E A
L P
R
IN
T E
D C
O P
IE
S O
F T
H
IS
D
O C
U M
E N
T A
R E N
O T C
O N
S
ID
E R
IS
I T
E M H
A S B
E E
N D
IG
IT
A L L
Y S
IG
N E
D A
N D S
E A
L E
D B
Y W
IL
L
IA
M S
E T
H T
A T
M A
N O
N
Approved 2023-H-395-00298
/2
/2
:3
:5
A
M
R E
V
IS
IO
N DESCRIPTION:
REVISION
LAST
ofSTANDARD PLANS
FY 2023-24 SHEETINDEX
111102-600
GENERAL INFORMATION FOR TRAFFIC
CONTROL THROUGH WORK ZONES11/01/20
GENERAL NOTES:
SHEET TABLE OF CONTENTS
L =
WS²
Road Type
1,500
45 360
42550
55 495
57060
65 645
70 730
BUFFER LENGTH "B"
TAPER LENGTH "L"
40 305
30 200
25 155
35 250 õ 40
L = WSö 45
Min. Spacing (feet)
Length (feet)
Min.
Length (feet)
Min.
Speed (mph)
Work Zone
Speed (mph)
Work Zone but not less than 155 feet.
the greatest length possible, geometric constraints, use cannot be attained due to
Note: When Buffer Length "B"
Work Zone Speed õ 40 mph
Arterials and Collectors with
Work Zone Speed ö 45 mph
Arterials and Collectors with
Limited Access Roadways * with the MUTCD and as approved by the Engineer.
mph, the minimum spacing may be reduced in accordance
* For Limited access roadways with work zone speed õ 55
Taper Tangent Taper Tangent
25 50
25 50
50 100
CHANNELIZING DEVICE SPACING
Vertical Panels, or Drums
Type II Barricades, Type I Barricades, ö 50 õ 45
(mph)
Speed
Zone
Work Max. Spacing (feet)
TABLE 2TABLE 1
TABLE 3 TABLE 4
Tubular Markers
Temporary
Cones or
3. Except for emergencies, any road closure on State Highway System must comply with Section 335.15, F.S.
Department criteria for any changes and document the reason for the change.
signals, signs, pavement markings, and channelizing devices. Comply with MUTCD or applicable approved by the Engineer. Devices include, but are not limited to, flaggers, portable temporary
Adjust device location or number thereof as recommended by the Worksite Traffic Supervisor and through 102-680 are Department-specific typical applications of commonly encountered situations.
2. Use this Index in accordance with the Plans and Indexes 102-601 through 102-680. Indexes 102-601 provided in the MUTCD.
(City/County) having jurisdiction may adopt requirements based on the minimum requirements
State Highways. For highways, roads and streets off the State Highway System, the local agency
State Highway System. Certain requirements in this Index are based on the high volume nature of construction and maintenance operations and utility work on highways, roads and streets on the preparation of traffic control plans and for the execution of traffic control in work zones, for
1. This Index contains information specific to the Federal and State guidelines and standards for the
WORK ZONE SIGN SPACING "X"
Temporary Barrier Notes
Channelizing Devices Notes
Speed Reduction Signing
General Notes, TTC Tables
MarkingsPavement
Channelizing Devices Consistency
Channelizing Devices
Closures Lane
VehiclesOverweight/Oversize
Of
Zones Work
Length
Superelevation
Lane
ControlFlagger
WorkSurvey4
High-Visibility
Widths
Apparel Safety
For
Devices Control
WorkOverhead
Traffic
Temporary
Definitions
Railroads
Clear
Widths Zone
Hazard
DistanceSight
GroundAbove
Boards Arrow
Drop-Offs8
Warning
Attenuators Mounted
Advanced
Signals
In
AsphaltTemporary
Separator
Entrance
Zones Work
Business
Truck
Supports Sign
Commonly6
Zone
Signs
Zones
Work5
Used Zones Work
Manholes/Crosswalks/Joints
In and Warning Signs Regulatory
S = speed in mph in feet
Where: W = width of offset
Approved 2023-H-395-00298
/2
/2
:3
:0
A
M
R E
V
IS
IO
N DESCRIPTION:
REVISION
LAST
ofSTANDARD PLANS
FY 2023-24 SHEETINDEX
112102-600
GENERAL INFORMATION FOR TRAFFIC
CONTROL THROUGH WORK ZONES11/01/20
DEFINITIONS:
Regulatory Speed (In Work Zones) other similar features.
crash cushion requirements, marker spacings, superelevation and rates, flare rates, lengths of need, clear zone widths, taper lengths, as the minimum design speed to determine runout lengths, departure must be shown or noted in the plans. This speed should be used indicated by the regulatory speed limit signs. The work zone speed
The maximum permitted travel speed posted for the work zone is
Advisory Speed
The maximum recommended travel speed through a curve or a hazardous area.
Travel Way from through traffic.
to separate speed change, turning, passing and climbing maneuvers
b. Auxiliary Lane: The designated widths of roadway pavement marked traffic occupying other traffic lanes.
carry through traffic and to separate it from opposing traffic or
a. Travel Lane: The designated widths of roadway pavement marked to for use as a lane for the movement of vehicular traffic.
of shoulders and any other permanent or temporary surface intended control through work zones, travel way may include the temporary use
The portion of the roadway for the movement of vehicles. For traffic
Detour, Lane Shift, and Diversion permanent roadway and within the limits of the right of way.
redirection of traffic onto a temporary roadway, usually adjacent to the onto a different section of the permanent pavement. A diversion is the temporary traffic control zone. A lane shift is the redirection of traffic
A detour is the redirection of traffic onto another roadway to bypass the
Aboveground Hazard firm and unyielding or doesn't meet breakaway requirements.
safety criteria, i.e., anything that is greater than 4" in height and is located within the clear zone which does not meet the Department's traffic control devices that encroaches upon the travel way or that is
An aboveground hazard is any object, material or equipment other than
TEMPORARY TRAFFIC CONTROL DEVICES:
shielded by a barrier or crash cushion when not in use.
in use and shall be moved outside the travel way and clear zone or be shall be delineated with a channelizing device placed at each corner when
Trailer, Portable Regulatory Signs, and any other trailer mounted device
3. Arrow Boards, Portable Changeable Message Signs, Radar Speed Display work when work is suspended.
on the shoulder, sidewalk, or other roadway facility not affected by the shall be removed or covered. Do not store temporary traffic control devices of time, temporary traffic control devices that are no longer appropriate when they are no longer needed. When work is suspended for short periods
2. All temporary traffic control devices shall be removed as soon as practical marked on the device in a readily visible location.
Products List (APL). Ensure the appropriate APL number is permanently
1. All temporary traffic control devices shall be ON the Department's Approved
Work is only allowed over a traffic lane when one of the following options is used:
OPTION 1 (OVERHEAD WORK USING A MODIFIED LANE CLOSURE)
flagmen and/or a traffic control officer.
g. Volume or complexity of the roadway may dictate additional devices, signs, the lane using a minimum 100 foot taper.
f. Traffic control devices are placed in advance of the vehicle/equipment closing
e. Aerial lift equipment is placed directly below the work area to close the lane.
flashing, oscillating, or strobe lights operating.
d. Aerial lift equipment in the work area has high-intensity, rotating,
c. Speed limit is 45 mph or less.
b. Work operations are 60 minutes or less.
limited to signals, signs, lighting and utilities.
a. Work operation is located in a signalized intersection and conditions are met:
Overhead work using a modified lane closure is allowed if all of the following
OPTION 2 (OVERHEAD WORK ABOVE AN OPEN TRAFFIC LANE)
OPTION 3 (OVERHEAD WORK ADJACENT TO AN OPEN TRAFFIC LANE)
OVERHEAD WORK: OVERHEAD WORK: (Cont.)
ENCROACHMENT BELOW THE OVERHEAD WORK AREA)
OPTION 4 (OVERHEAD WORK MAINTAINING TRAFFIC WITH NO
e. Structure demolition.
d. Railing construction located at edge of deck.
c. Concrete placement.
b. Form and falsework placement and removal.
a. Beam, girder, segment, and bent/pier cap placement.
to, but not limited to, the following construction activities:
appropriate index drawing or detailed in the plans. This option applies area directly below the overhead work operations in accordance with the
Traffic shall be detoured, shifted, diverted or paced as to not encroach in the
(CONDUCTOR/CABLE PULLING ABOVE AN OPEN TRAFFIC LANE)OPTION 5
during the pulling operation.
by a traffic control officer and police vehicle with blue lights flashing messages, "Overhead Work Ahead" and "Be Prepared to Stop" followed
Changeable Message Sign upstream of the work area with alternating
b. During pulling operations, advance warning consisting of no less than a rope across the roadway.
a. The temporary traffic control set up for the initial pulling of the pull required. The temporary traffic control plan shall include:
On Limited Access facilities, a site specific temporary traffic control plan is conductors/cables at no time fall below the minimum vertical clearance.
the travel way. The utility shall take precautions to ensure that pull ropes and activities, materials or equipment within the minimal vertical clearance above over open lane(s) of traffic with no encroachment by any part of the work
Continuous pulling operations of secured cable and/or conductors are allowed temporary traffic control plan.
tension shall be done in accordance with the appropriate Index or
Overhead cable and/or de-energized conductor installations initial pull to proper
RAILROADS:
lane closure or taper locations, signal timing, etc.
as a minimum: traffic volumes, distance from the tracks to the intersections, traffic controls to reduce queuing on the tracks. The evaluation should include
Railroad crossings affected by a construction project should be evaluated for
SIGHT DISTANCE:
ABOVEGROUND HAZARD:
restrict intersection sight distance.
the intersection safely. Construction equipment and materials shall not distances for the road user to perceive potential conflicts and to traverse
2. Intersections: Traffic control devices at intersections must provide sight tapers should not be hidden behind curves.
should begin well in advance of the view obstruction. The beginning of distance is a problem (e.g., a sharp vertical or horizontal curve), the taper
1. Tapers: Transition tapers should be obvious to drivers. If restricted sight should be based on the regulatory speed posted during construction.
2. For aboveground hazards within a work zone the clear zone required crash cushion.
outside the travel way and clear zone or be shielded by a barrier or equipment that constitute an aboveground hazard must be stored/placed control procedures. During nonworking hours, all objects, materials and during working hours and treated with appropriate work zone traffic
1. Aboveground hazards (see definitions) are to be considered work areas clearance. The greater clearance required prevails as the rule.
h. Other Governmental Agencies, Rail facilities, or Codes may require a greater objects from falling into open lanes of traffic.
g. Adequate precautions are taken to prevent parts, tools, equipment and other flagmen and/or a traffic control officer.
f. Volume or complexity of the roadway may dictate additional devices, signs, oscillating, or strobe lights operating.
e. Aerial lift equipment in the work area has high-intensity, rotating, flashing, area bounded by 2 feet outside the edge of travel way and 18 feet high.
d. No encroachment by any part of the work activities and equipment within an
c. Speed limit is 45 mph or less.
b. Work operations are 60 minutes or less.
appurtenances.
a. Work operation is located on a utility pole, light pole, signal pole, or their are met:
Overhead work above a open traffic lane is allowed if all of the following conditions clearance. The greater clearance required prevails as the rule.
h. Other Governmental Agencies, Rail facilities, or Codes may require a greater objects from falling into open lanes of traffic.
g. Adequate precautions are taken to prevent parts, tools, equipment and other flagmen and/or a traffic control officer.
f. Volume or complexity of the roadway may dictate additional devices, signs, oscillating, or strobe lights operating.
e. Aerial lift equipment in the work area has high-intensity, rotating, flashing, or less).
traffic lane (except as allowed in Option 2 for work operations of 60 minutes encroachment by any part of the work activities and…