07 QASP HC1003125947.docx

DOCX document 40 KB Posted

Attached to
Pearl Harbor Wall Partition Federal contract opportunity
Solicitation number
HC101921R0007
Issued by
Defense Information Systems Agency

View the file

Other files for this federal contract opportunity

Other files attached to Pearl Harbor Wall Partition, newest first.
File Type Posted
HC101921R0007 Amend02 Extension.pdf PDF
18 RFP HC101921R0007 QA.pdf PDF
18 HC1019-21-R-0007-0001 AMENDMENT.pdf PDF
18 Site Survey revised.docx DOCX document
18 Site Survey.docx DOCX document
HC1003125947 PRICE QUOTE WORKSHEET.xlsx XLSX spreadsheet
HC1019-21-R-0007.pdf PDF
07 Auditorium Dimensions.JPG JPG image

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

1. Contract Title: Defense Information Systems Agency Pacific (DISA PAC) Auditorium Soundproof Wall Partition Slider Replacement

2. Purpose:

This QASP provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored?

· How monitoring will take place.

· Who will conduct the monitoring?

· How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.

This QASP is a “living document” and the Government may review and revise it on a regular basis. Updates will ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions will be provided to the contractor and Government officials implementing surveillance activities.

3. Roles and Responsibilities:

The following personnel will oversee and coordinate surveillance activities.

Contracting Officer (KO) – The KO will ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO will also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. The Contract Specialist is an extension of the KO; however, does not hold a warrant. Final contractual decisions must come from the KO.

Government Point of Contact (POC) and Alternate POC – The Government POCs are responsible for providing technical oversight of the contractor’s performance. The Government POCs use the QASP to conduct the oversight/surveillance process. The Government POCs will monitor, inspect, and maintain records regarding the project during contract performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The Government POCs are responsible for reporting early identification of performance problems to the KO. The QASP is the primary tool for documenting contractor performance. The Government POCs are not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.

4. Primary Method of Surveillance:

Periodic Inspection (daily and upon completion of the installation) is scheduled for Items 1 and 2. 100% Inspection is scheduled for Item 3. The Surveillance Matrix (Appendix 1) is the list of performance objectives and standards that must be performed by the contractor.

5. Performance Standards:

Performance Standard
Acceptable Quality Level (AQL)
Methods of Calculation
6.1 Task 1 – Removal and Disposal of Existing Divider(s)
Performance occurs with no required re-performance or re-work 100% of the time. Problems that occur are minor and are resolved in a satisfactory manner
Routine inspection and final inspection

6.2 Task 2 – Procure and Install New Dividers

Performance occurs with no required re-performance or re-work 100% of the time. Problems that occur are minor and are resolved in a satisfactory manner and in accordance with the warranty
Routine inspection, visual inspection, final walk-through, function test
6.2.2 Warranties
100% valid, written, verification documentation received

6. Documenting Performance:

Acceptable Performance.

The Government will document positive performance. Government acceptance of services in writing permits the contractor to invoice for the service fee.

Unacceptable performance.

Unacceptable contractor performance can be identified by customer complaints (Appendix 2) or upon routine inspections, visual inspections, final walk-through, and/or function testing. When unacceptable performance occurs, the Government POCs will inform the contractor and the KO. The Government POCs will document the discussion and provide a copy to the KO.

When the Government POCs determine formal written communication is required, the Government POCs will prepare a Corrective Action Report (CAR). The CAR is forwarded to the KO for dissemination to the contractor. A CAR template is attached to this QASP (Appendix 3).

The contractor shall acknowledge receipt of the CAR in writing. The CAR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CAR will also state how long after receipt the contractor has to present this corrective action plan to the KO and the Government POCs. The Government may withhold payment for services until corrective action is taken. The Government will review the contractor's corrective action plan to determine acceptability. Upon Government acceptance of the corrected services, the contractor will be permitted to invoice for the services.

Any CAR may become a part of the supporting documentation for contract payment deductions, CPARS, or other actions deemed necessary by the KO.

7. Mandatory or regulatory compliance items: The Government POCs must notify the Contracting Officer if there are any potential or actual non-compliance issues with federal statues, laws, or regulations, since the KO is the only person that can resolve these noncompliance issues related to law or regulations. The contractor shall provide initial proof of compliance with regulatory and compliance items contained in the contract. The Government POCs and KO will evaluate the initial submission and will conduct ad hoc reviews of the contractor's compliance throughout the remainder of the contract.

8. Acceptable Quality Level (AQL):

The AQL for this project is 100%.

9. Evaluation Method:

The Government POCs will conduct periodic inspections via visual surveillance during installation. Upon completion, the Government POCs will conduct a final walk-through (visual inspection) and conduct a function test. The visual inspection includes clean-up of the work site. The Government POCs and KO will also conduct 100% inspection of all elements of the warranty documentation to ensure compliance with the contract. All elements will be evaluated on an Acceptable/Complete or Unacceptable/Incomplete basis.

10. Performance Rating

The Government does not intend to provide a Contractor Performance Assessment Report (CPAR) evaluation; however, it reserves the right to initiate one if deemed in the best interest of the Government by the KO. In the unlikely event a CPAR evaluation is drafted, the following performance ratings may be used:

Rating
Definition
Note
Exceptional
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
Very Good
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government. There should have been no significant weaknesses identified.
Satisfactory
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract/order. There should have been NO significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be evaluated with a rating lower than Satisfactory solely for not performing beyond the requirements of the contract/order.
Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
To justify Marginal performance, identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter).
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
To justify an Unsatisfactory rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters).

Appendix 1 - Surveillance Matrix

Performance Standards Acceptable Quality Levels Methods of Calculation

Surveillance
Results/Ratings
Removal and Disposal of Existing Divider(s)
Performance occurs with no required re-performance or re-work 100% of the time. Problems that occur are minor and are resolved in a satisfactory manner
Periodic inspection:

Routine (daily) and final inspection Data will be collected informally daily from visual inspections during the installation period.

Final walk-through (visual) and function testing upon completion prior to turnover to the Government.

Acceptable/Complete Unacceptable/Incomplete

Procure and Install New Dividers
Performance occurs with no required re-performance or re-work 100% of the time. Problems that occur are minor and are resolved in a satisfactory manner and in accordance with the warranty
Periodic inspection: Routine (daily) inspection, visual inspection, final walk-through, function test
Data will be collected informally daily from visual inspections during the installation period.

Final walk-through (visual) and function testing upon completion prior to turnover to the Government.

Acceptable/Complete

Warranties
100% valid, written, verification documentation received
100% inspection of documentation
Data will be collected from review of the written warranty/contract

Acceptable/Complete

Appendix 2 – Customer Complaint Record

CUSTOMER COMPLAINT RECORD

DATE/TIME OF COMPLAINT

SOURCE OF COMPLAINT

ORGANIZATION

BUILDING NUMBER

INDIVIDUAL

PHONE NUMBER

NATURE OF COMPLAINT

CONTRACT REFERENCE

VALIDATION

DATE/TIME CONTRACTOR INFORMED OF COMPLAINT

ACTION TAKEN BY CONTRACTOR

RECEIVED/VALIDATED BY

Appendix 3 – Corrective Action Report

CORRECTIVE ACTION REPORT (CAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACTOR

2. CONTRACT NUMBER

3. TYPE OF SERVICES

4. FUNCTIONAL AREA

5. SUSPENSE DATE

6. CONTROL NUMBER

7. DEFICIENCY |_| MAJOR |_| MINOR

FINDING:

FINDING IMPACT:

Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.

8. QUALITY ASSURANCE PERSONNEL (COR)

TYPED NAME AND GRADE

SIGNATURE AND DATE

9. ISSUING AUTHORITY

TYPED NAME AND GRADE

SIGNATURE AND DATE

10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE

11. COR DETERMINATION

|_| ACCEPTED |_| REJECTED

12. CLOSE DATE

Enclosure 6, Page 1 of 2 Pages 17Jul2013/Version 2

Encl 4, QASP 11Feb2021/v4