View the file

Other files for this federal contract opportunity

Other files attached to Drogue Severance Assembly, Initiator, Cartridge Actuated, newest first.
File Type Posted
Solicitation Amendment 0003.pdf PDF
Solicitation Amendment 0002.pdf PDF
Solicitation Amendment 0001.pdf PDF
11 CDRLs CLIN 0003-0004.pdf PDF
01 Air Spec CLINS 0005-0006.pdf PDF
08 JFQR 1377-01-083-8459ES.pdf PDF
08 JFQR DSA.pdf PDF
08 JFQR 01-203-8651.pdf PDF
09 Item Descriptions.pdf PDF
04 CADPAD Item Marking Instruction - Ver 1.6 20230306.pdf PDF
03 SOW Ammo Data Cards.pdf PDF
11 CDRLs CLIN 0002.pdf PDF
08 JFQR 01-645-7393.pdf PDF
08 JFQR 01-355-0088.pdf PDF
06 SPI F012717161.pdf PDF
01 AIR SPEC CLIN 0001.pdf PDF
10 EDLs.pdf PDF
Solicitation.pdf PDF
08 JFQR 1377-01-234-0706ES.pdf PDF
01 Air Specs CLINS 0003-0004.pdf PDF
12 Ship in Place and Temporary Storage of FMS Munitions Items.pdf PDF
06 SPI F01-167-6621.pdf PDF
06 SPI_F010838459.pdf PDF
02 REPSHIP.pdf PDF
11 CDRLs CLIN 0005-0006.pdf PDF
11 CDRLs CLIN 0001.pdf PDF
08 JFQR 01-203-1959.pdf PDF
06 SPI NSN 7393.pdf PDF
06 SPI F001383770.pdf PDF
05 SOW Packaging.pdf PDF
01 Air Spec CLIN 0002.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(ES7034)