These are comprehensive construction bid drawings for the Skyline US-34 Trailhead project prepared by J-U-B Engineers for the City of Loveland Parks and Recreation Department in Larimer County, Colorado. The project involves constructing a new trailhead facility located directly north of US Highway 34 on the western edge of Loveland city limits. The site plan includes a 17-space asphalt parking lot, an asphalt access road, a 10-foot concrete multi-use trail starting point, a concrete median, a water quality structure to manage runoff, and additional site amenities such as bike racks, picnic tables, and a vault toilet. The total project area covers approximately 1.736 acres, with 1.391 acres of proposed ground disturbance.
The construction drawings detail extensive site infrastructure, including stormwater management, erosion control measures, grading plans, and specific technical details for elements like pavement sections, soil riprap, concrete structures, and site furnishings. The project budget encompasses multiple line items totaling various quantities, such as 730 tons of hot mix asphalt, 1,684 tons of aggregate base course, 236 square yards of concrete sidewalk, and 321 square feet of concrete median cover material. The engineering documents indicate careful consideration of environmental impacts, with specific native seed mixes for revegetation, erosion control strategies, and compliance with local and state stormwater discharge regulations. The project is scheduled for bid in September 2024, with construction drawings prepared by J-U-B Engineers and civil engineering services provided by Shawn Fetzer, PE.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 04 BID 2025-0008 Special Provisions_2025-1-22.pdf | ||
| 01 BID 2025-0008 Bid Document Skyline Trail Head FINAL rev-DK.pdf | ||
| 02 BID 2025-0008 Unit Price Bid Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
LOCATION
TO LOVELAND
US-34/EISENHOWER BLVD.
TO ESTES PARK
BIG THOMPSON
RIVER
W. 22ND ST.
C
AS
C
AD
E
AV
E.
R O
SS
U
M D
R
SECTION 8
SECTION 9
SECTION 16
SECTION 17
N . N
AM
AQ
U A
AV
E.
DESIGN BY:
DRAWN BY:
CHECKED BY:
B Y
A P
R
D A
T E
D E
S C
R
IP
T
IO
N
R
EU
SE
O F
D R
A W
IN
G
S J-
U -B
S H
AL
L
R
ET
AI
N
A
LL
C O
M M
O N
L
AW
, S
TA
TU
TO
R Y, C O
PY
R
IG
H
T
AN
D O
TH
ER
R
ES
ER
VE
D R
IG
H
TS
O
F
TH
ES
E
D R
AW
IN
G S, A N
D T
H E
SA
M
E
SH
AL
L
N O
T
BE
R
EU
SE
D
W
IT
H O
U T
J- U
-B 'S
P R
IO
R
W R
IT
TE
N C
O N
SE
N
T.
AN
Y R
EU
SE
W
IT
H O
U T
W R
IT
TE
N C
O N
SE
N
T
BY
J -U
-B W
IL
L
BE
A
T C
LI
EN
T' S
SO
LE
R
IS
K
AN
D W
IT
H
O U
T
LI
AB
IL
IT
Y
O R
L
EG
AL
E
XP
O
SU
R
E
TO
J -U
-B
N O
R E
V
IS
IO
N
JUB PROJ. # :
INCH, SCALE ACCORDINGLY
AT FULL SIZE, IF NOT ONE
ONE INCH
FILE :
J-U-B ENGINEERS, INC.
J- U
-B E
N G
IN
E
E R
S , I
N C w w w .ju b.
co m
J-U-B ENGINEERS, INC.
C O
N S
T R
U C
T
IO
N
P R
E
LI
M
IN
A R
Y
N O
T F
O R
P
LA
N S
DRAWING:
SHEET: OF
F or t C ol lin s, C O
E . H ar m on y
R d.
P ho ne : 9
.3
.3
S ui te
00SHEET LIST TABLE
Subset
Sheet Number(s) Drawing Number
TITLE 1 C-001
LEGEND &
ABBREVIATIONS 2 C-002
GENERAL NOTES 3 C-003
TABULATIONS 4 C-004
EXISTING TOPOGRAPHY 5 C-005
SITE OVERVIEW 6 C-006
GEOMETRICS 7 C-007
SITE PLAN 8 C-008
GRADING PLAN 9 C-009
STORMWATER
MANAGEMENT
10 - 15 C-010 TO C-015
DETAILS 16 - 20 C-016 TO C-020
LAST UPDATED: 9/24/2024
07-23-018_JJ_C-001
\\J U
B .C
O M
\C E
N T
R A
L\ C
LI
E
N T
S \C
O \L
O V
E
LA
N D
C
IT
Y \P
R O
JE
C
T S
\0 7-
-0
_P
A R
K S
T R
A
IL
H E
A D
S \D
E S
IG
N
\C A
D \S
H E
E T
\J J\
-2
3-
8_
JJ
_C -0
.D
W G
P lo t D at e:
/2 9/
:5
P
M P lo tte d B y:
K yl e
R itc hi e
D at e C re at ed :8
/1 /2
SK
YL
IN
E
U S-
T
R
AI
LH
EA
D C
IT
Y
O F
LO
V
E
LA
N D
P A
R K
S
R E
C R
E A
TI
O
N
T
IT
LE
07-23-018
KRITCHIE
KRITCHIE
SFETZER
C-001 1 20
CITY OF LOVELAND
PARKS & RECREATION DEPARTMENT
SKYLINE US-34 TRAILHEAD
PROJECT LOCATION MAP
1,000 2,000
SCALE IN FEET
BID PLANS
SEPTEMBER 2024
N
T. 5 N.
R. 69 W.
PROJECT TEAM
OWNER:
CITY OF LOVELAND PARKS AND RECREATION
MARIKA KOPP
500 E. THRID ST., SUITE 200
LOVELAND, CO 80537
CIVIL ENGINEER:
J-U-B ENGINEERS
SHAWN FETZER, PE
2809 E. HARMONY RD., SUITE 300
FORT COLLINS, CO 80528
SURVEYOR:
KING SURVEYORS
CHAD DILKA, PLS
650 EAST GARDEN DRIVE
WINDSOR, CO 80525
GEOTECHNICAL:
EARTH ENGINEERING CONSULTANTS
DAVID RICHER, PE
4396 GREENFIELD DRIVE
WINDSOR, CO 80550
REVIEWED BY:
LARIMER COUNTY ENGINEERING DATE
THE LARIMER COUNTY REVIEW CONSTITUTES COMPLIANCE WITH THESE STANDARDS.
REVIEW BY THE COUNTY DOES NOT CONSTITUTE APPROVAL OF THE PLAN DESIGN.
THIS REVIEW DOES NOT CONSTITUTE REVIEW/APPROVAL OF ANY PRIVATE ON-SITE
IMPROVEMENTS WHIC MAY BE SHOWN. THESE PLANS ARE INTENDED TO BE FOR
COUNTY REVIEW OF PUBLIC IMPROVEMENTS ADJACENT TO THE PROPERTY.
CONSTRUCTION OF THE ON-SITE IMPROVEMENTS CANNOT COMMENCE UNTIL AL
REQUIRED TRAFFIC WORKSHEET OR STUDY(S), FINAL DEVELOPMENT PLAN(S),
SPECIAL REVIEW(S), AND BUILDING PERMIT(S) ARE COMPLETE, APPROVED AND ON
FILE WITH LARIMER COUNTY.
REVIEWED BY:
PUBLIC WORKS - TRANSPORTATION DEVELOPMENT DIVISION
BY: DATE:
LOVELAND FIRE RESCUE AUTHORITY
BY: DATE:
WATER AND POWER DEPARTMENT - WATER/WASTEWATER
BY: DATE:
WATER AND POWER DEPARTMENT - POWER
BY: DATE:
PUBLIC WORKS DEPARTMENT - STORMWATER DIVSION
BY: DATE:
PARKS AND RECREATION DEPARTMENT
BY: DATE:
DEVELOPMENT SERVICES DEPARTMENT - CURRENT PLANNING DIVISION
BY: DATE:
VERTICAL DATUM:
NATIONAL GEODETIC VERTICAL DATUM 1929 (NGVD29) & GEIOD18.
BENCHMARK: CITY OF LOVELAND BENCHMARK "95 13" ELEV=5058.66'
HORIZONTAL DATUM:
COLORADO STATE PLANE COORDINATES NAD 83(2011) DATUM. (NAD83 COLORADO STATE
PLANES, NORTH ZONE, US FOOT - CODE: CO83-NF)
HORIZONTAL CONTROL BASED UPON TRIMBLE VRS NETWORK.
ABBREVIATIONS
ASSY ASSEMBLY
> ANGLE
@ AT (MEASUREMENTS)
BLDG BUILDING
BM BENCH MARK
BOW BACK OF WALK
BSC BITUMINOUS SURFACE COURSE
BSW BACK OF SIDEWALK
BVC BEGIN VERTICAL CURVE
BW BOTH WAYS
C CHANNEL (STRUCTURAL)
C/L CENTER LINE
CIP COMPLETE IN PLACE
CMP CORRUGATED METAL PIPE
CO CLEANOUT
CONC CONCRETE
CONT CONTINUOUS
CPLG COUPLING
CU FT CUBIC FEET
CU YD CUBIC YARD
DEG OR ° DEGREE
DET DETAIL
DIA OR Ø DIAMETER
DIP DUCTILE IRON PIPE
DIST DISTRIBUTION
DWG DRAWING
EA EACH
EG EDGE OF GRAVEL
ELB ELBOW
ELEV or EL ELEVATION
EVC END VERTICAL CURVE
EW EACH WAY
EXIST OR EX EXISTING
FG FINISH GRADE
FH FIRE HYDRANT
FLG FLANGE
FT OR ' FEET
GV GATE VALVE
HCL HORIZONTAL CONTROL LINE
HERPC HORIZONTAL ELLIPTICAL
REINFORCED CONCRETE PIPE
HMA HOT MIX ASPHALT
HORIZ HORIZONTAL
HP HIGH POINT
ID INSIDE DIAMETER
IN OR " INCH
LB OR # POUND
LF LINEAL FEET
LN LINEAL
LVC LENGTH OF VERTICAL CURVE
MAX MAXIMUM
MIN MINIMUM
NO OR # NUMBER
PCR POUND PER CUBIC FOOT
PE POLYETHYLENE
PGL PROFILE GRADE LINE
PSI POUND PER SQUARE INCH
PL PLATE
PL PROPERTY LINE
PVC POLYVINYL-CHLORIDE
PVI POINT OF VERTICAL INFLECTION
PVMT PAVEMENT
R RADIUS
RCP REINFORCED CONCRETE PIPE
RCEP REINFORCED CONCRETE
ELLIPTICAL PIPE
RP RADIUS POINT
R&R REMOVE & REPLACE
REM REMOVE
REQ'D REQUIRED
REV REVISION
R/W or ROW RIGHT-OF-WAY
S SLOPE
SPEC SPECIFICATION
STA STATION
STD STANDARD
STL STEEL
ST STL STAINLESS STEEL
TBC TOP BACK OF CURB
TYP TYPICAL
TFC TOP FACE OF CONCRETE
W/ WITH
W/O WITHOUT
W/REQ'D WHERE REQUIIRED
WL WATER LINE
YR YEAR
WATER (GENERAL)
WATER (SPECIFIED SIZE)
WATER SERVICE
W
X"W
WSWS
W
X"W
WSWS
DOMESTIC WATER
IRRIGATION IRRIRR
IRRIGATION
NATURAL GAS
NATURAL GAS SERVICE
G
GG
G
GG
NATURAL GAS
FENCE (3-STRAND)
MAJOR CONTOUR
MINOR CONTOUR
CUT LIMITS
FILL LIMITS
DITCH
EDGE OF WATER
TOP OF SLOPE
TOE OF SLOPE
HIGH WATER
STORM SWALE
XX
TOP
TOE
WETLAND WET
SITE
TOP
TOE
WET
CUT
FILL
FENCE (DOWEL)
ROAD SHOULDER
ROAD CENTERLINE
ROAD ASPHALT
ROAD GRAVEL
TOP BACK OF CURB
LIP OF GUTTER
EP
EG
ROADWAY
OVERHEAD POWER
UNDERGROUND POWER
OVERHEAD TELEPHONE
UNDERGROUND TELEPHONE
FIBER OPTIC
CABLE TELEVISION
OHP
UP
OHT
UT
F/O
CTV
OHP
UP
OHT
UT
F/O
CTV
UNDERGROUND POWER, TEL,
CABLE TV
P,T,CTV
UNDERGROUND POWER, TEL,
CABLE TV, GAS
P,T,CTV,G
POWER / COMMUNICATIONS
P,T,CTV
P,T,CTV,G
X
DT-90X
DETAIL
NUMBER
SHEET
NUMBER
DETAIL CALLOUT
SURVEY
1/2" PIN
CONTROL PT
CAP
(ALUMINUM)
CTRL PT 12"
REBAR
CTRL PT 5 8"
REBAR
CTRL PT
PK NAIL
CTRL PT
60D NAIL
5/8" PIN
CONTROL PT
60D
PK
BENCHMARK
NAIL
WELL
TREE
(STUMP)
TREE
(SHRUB)
TREE
(CONIFEROUS)
TREE
(DECIDUOUS)
SIGN
BOX
ROCK
GATE
FLAGPOLE
BOLLARD
TEST
HOLE
SITE
BORE HOLE
SPOT
ELEVATION
POST
TELE.
MANHOLE
TELE.
POLE
TELE.
PEDESTAL
TV
PEDESTAL
COMMUNICATIONS
GUY
WIRE
MANHOLE
(GENERIC)
THRUST
BL0CK
UTILITIES
VAULT
VALVE
(GENERIC)
UTILITY
POLE
VERTICAL
PIPE
WATER
MANHOLE
WATER
METER
WATER
VALVE
FIRE
HYDRANT
DOMESTIC WATER
IRRIGATION
VALVE BOX
IRRIGATION
VALVE
IRRIGATION
SS
MANHOLE
SEWER
STUB
CLEANOUT
SANITARY SEWER
GAS
VALVE
GAS
METER
NATURAL GAS
SD
MANHOLE
CATCH
BASIN
FLARE END
STORM DRAIN
ARROW
LEFT
ARROW
RIGHT
ROAD MARKINGS
PIPE
END
OBJECT
BREAK LINE
TYPICAL DETAILS
WATER
SURFACE
POWER
POLE
POWER
STUB
ELEC.
MANHOLE
JUNCTION
BOX
STREET
LIGHT
ELEC.
METER
ELEC.
TRANS.
GUY WIRE
POWER
STREET LIGHT
W/ ARM
ELEC.
SERVICE
EXISTING
LINE
LINE
DESCRIPTION
PROPOSED
LINE
EXISTING
SYMBOL
SYMBOL
DESCRIPTION
PROPOSED
SYMBOL
STORM DRAIN (GENERAL)
STORM DRAIN
SD
X"SD
SD
X"SD
STORM DRAIN
SANITARY SEWER SSSS
SANITARY SEWER
EXISTING
SYMBOL
SYMBOL
DESCRIPTION
PROPOSED
SYMBOL
EXISTING
SYMBOL
SYMBOL
DESCRIPTION
PROPOSED
SYMBOL
PROPERTY LINE
RIGHT OF WAY
TEMPORARY EASEMENT
PERMANENT EASEMENT
R/W
P/L
R/W
P/L
T/E
P/E
T/E
P/E
SECTION LINE
QUARTER SECTION LINE
BOUNDARY
RIGHT OF WAY, ABANDONED AB R/W
RIGHT OF WAY, RESERVED RES R/W
DESIGN BY:
DRAWN BY:
CHECKED BY:
B Y
A P
R
D A
T E
D E
S C
R
IP
T
SE
O F
D R
A W
IN
G
S J-
U -B
S H
AL
L
R
ET
AI
N
A
LL
C O
M M
O N
L
AW
, S
TA
TU
TO
R Y, C O
PY
R
IG
H
T
AN
D O
TH
ER
R
ES
ER
VE
D R
IG
H
TS
O
F
TH
ES
E
D R
AW
IN
G S, A N
D T
H E
SA
M
E
SH
AL
L
N O
T
BE
R
EU
SE
D
W
IT
H O
U T
J- U
-B 'S
P R
IO
R
W R
IT
TE
N C
O N
SE
N
T.
AN
Y R
EU
SE
W
IT
H O
U T
W R
IT
TE
N C
O N
SE
N
T
BY
J -U
-B W
IL
L
BE
A
T C
LI
EN
T' S
SO
LE
R
IS
K
AN
D W
IT
H
O U
T
LI
AB
IL
IT
Y
O R
L
EG
AL
E
XP
O
SU
R
E
TO
J -U
-B
N O
R E
V
IS
IO
N
JUB PROJ. # :
INCH, SCALE ACCORDINGLY
AT FULL SIZE, IF NOT ONE
ONE INCH
FILE :
J-U-B ENGINEERS, INC.
J- U
-B E
N G
IN
E
E R
S , I
N C w w w .ju b.
co m
J-U-B ENGINEERS, INC.
C O
N S
T R
U C
T
IO
N
P R
E
LI
M
IN
A R
Y
N O
T F
O R
P
LA
N S
DRAWING:
SHEET: OF
F or t C ol lin s, C O
E . H ar m on y
R d.
P ho ne : 9
.3
.3
S ui te
LAST UPDATED: 5/13/2024
07-23-018_JJ_C-002
\\J U
B \C
E N
T R
A L\
C
LI
E N
T S
\C O
\L O
V E
LA
N
D C
IT
Y
\P R
O
JE
C T
S \0
7-
-0
_P A
R K
S T
R A
IL
H
E A
D S
\D E
S
IG
N \C
A D
\S H
E E
T \J
J\
-2 3-
8_
JJ
_C
-0
.D W
G
P lo t D at e:
/1 7/
:2
A
M P lo tte d B y:
A m y
Lo bs in ge r D at e
C re at ed
:5 /1
3/
SK
YL
IN
E
U S-
T
R
AI
LH
EA
D C
IT
Y
O F
LO
V
E
LA
N D
P A
R K
S A
N D
R E
C R
E A
TI
O
N
LE
G
E N
D
A B
B R
E V
IA
T
IO
N
S
07-23-018
KRITCHIE
KRITCHIE
SFETZER
C-002 2 20
DESIGN BY:
DRAWN BY:
CHECKED BY:
B Y
A P
R
D A
T E
D E
S C
R
IP
T
SE
O F
D R
A W
IN
G
S J-
U -B
S H
AL
L
R
ET
AI
N
A
LL
C O
M M
O N
L
AW
, S
TA
TU
TO
R Y, C O
PY
R
IG
H
T
AN
D O
TH
ER
R
ES
ER
VE
D R
IG
H
TS
O
F
TH
ES
E
D R
AW
IN
G S, A N
D T
H E
SA
M
E
SH
AL
L
N O
T
BE
R
EU
SE
D
W
IT
H O
U T
J- U
-B 'S
P R
IO
R
W R
IT
TE
N C
O N
SE
N
T.
AN
Y R
EU
SE
W
IT
H O
U T
W R
IT
TE
N C
O N
SE
N
T
BY
J -U
-B W
IL
L
BE
A
T C
LI
EN
T' S
SO
LE
R
IS
K
AN
D W
IT
H
O U
T
LI
AB
IL
IT
Y
O R
L
EG
AL
E
XP
O
SU
R
E
TO
J -U
-B
N O
R E
V
IS
IO
N
JUB PROJ. # :
INCH, SCALE ACCORDINGLY
AT FULL SIZE, IF NOT ONE
ONE INCH
FILE :
J-U-B ENGINEERS, INC.
J- U
-B E
N G
IN
E
E R
S , I
N C w w w .ju b.
co m
J-U-B ENGINEERS, INC.
C O
N S
T R
U C
T
IO
N
P R
E
LI
M
IN
A R
Y
N O
T F
O R
P
LA
N S
DRAWING:
SHEET: OF
F or t C ol lin s, C O
E . H ar m on y
R d.
P ho ne : 9
.3
.3
S ui te
LAST UPDATED: 5/13/2024
07-23-018_JJ_C-003
\\J U
B \C
E N
T R
A L\
C
LI
E N
T S
\C O
\L O
V E
LA
N
D C
IT
Y
\P R
O
JE
C T
S \0
7-
-0
_P A
R K
S T
R A
IL
H
E A
D S
\D E
S
IG
N \C
A D
\S H
E E
T \J
J\
-2 3-
8_
JJ
_C
-0
.D W
G
P lo t D at e:
/1 7/
:2
A
M P lo tte d B y:
A m y
Lo bs in ge r D at e
C re at ed
:5 /1
3/
SK
YL
IN
E
U S-
T
R
AI
LH
EA
D C
IT
Y
O F
LO
V
E
LA
N D
P A
R K
S
R E
C R
E A
TI
O
N
G E
N E
R A
L N
O T
E S
07-23-018
KRITCHIE
KRITCHIE
SFETZER
C-003 3 20
GENERAL NOTES
1. ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL MEET
OR EXCEED THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LARIMER COUNTY URBAN
AREA STREET STANDARDS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE
IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE
STANDARDS, THE MOST RESTRICTIVE STANDARD SHALL APPLY. ALL WORK SHALL BE INSPECTED
AND APPROVED BY THE CITY OF LOVELAND.
2. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF
EXISTING UTILITIES, AS SHOWN ON THESE PLANS, IS BASED ON RECORDS OF THE VARIOUS
UTILITY COMPANIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE
INFORMATION IS NOT TO BE RELIED UPON AS BEING EXACT OR COMPLETE. THE ENGINEER
SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) AT 1-800-922-1987, AT LEAST TEN (10) WORKING DAYS PRIOR TO BEGINNING EXCAVATION OR GRADING, TO HAVE
ALL REGISTERED UTILITY LOCATIONS MARKED. OTHER UNREGISTERED UTILITY ENTITIES (I.E.
DITCH/IRRIGATION COMPANY) ARE TO BE LOCATED BY CONTACTING THE RESPECTIVE
REPRESENTATIVE. UTILITY SERVICE LATERALS ARE ALSO TO BE LOCATED PRIOR TO BEGINNING
EXCAVATION OR GRADING. IT SHALL BE THE RESPONSIBILITY O F THE CONTRACTOR TO
RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS
SHOWN ON THESE PLANS.
3. NO WORK MAY COMMENCE WITHIN ANY IMPROVED PUBLIC RIGHT-OF-WAY UNTIL A
RIGHT-OF-WAY PERMIT OR DEVELOPMENT CONSTRUCTION PERMIT IS OBTAINED, IF APPLICABLE.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FOR ALL
APPLICABLE AGENCIES. THE CONTRACTOR SHALL NOTIFY THE CITY OF LOVELAND ENGINEER
AND LARIMER COUNTY ENGINEERING DEPARTMENT AT LEAST TWO (2) WORKING DAYS PRIOR TO
THE START OF ANY EARTH DISTURBING ACTIVITY, OR CONSTRUCTION ON ANY AND ALL PUBLIC
IMPROVEMENTS. IF THE CITY OF LOVELAND & LARIMER COUNTY ENGINEER IS NOT AVAILABLE
AFTER PROPER NOTICE OF CONSTRUCTION ACTIVITY HAS BEEN PROVIDED, THE CONTRACTOR
MAY COMMENCE WORK IN THE ENGINEERS ABSENCE. HOWEVER, THE CITY OF LOVELAND &
LARIMER COUNTY RESERVES THE RIGHT NOT TO ACCEPT THE IMPROVEMENT IF SUBSEQUENT
INSPECTION & TESTING REVEALS AN IMPROPER INSTALLATION.
5. ALL UTILITY INSTALLATIONS WITHIN OR ACROSS THE ROADBED OF NEW RESIDENTIAL ROADS
MUST BE COMPLETED PRIOR TO THE FINAL STAGES O F ROAD CONSTRUCTION. FOR THE
PURPOSES OF THESE STANDARDS, ANY WORK EXCEPT C/G ABOVE THE SUB-GRADE IS
CONSIDERED FINAL STAGE WORK. ALL SERVICE LINES MUST BE STUBBED TO THE PROPERTY
LINES AND MARKED SO AS TO REDUCE THE EXCAVATION NECESSARY FOR BUILDING
CONNECTIONS.
6. THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE CITY OF LOVELAND, AND ALL
UTILITY COMPANIES INVOLVED, WITH REGARD TO RELOCATIONS, ADJUSTMENTS, EXTENSIONS
AND REARRANGEMENTS OF EXISTING UTILITIES DURING CONSTRUCTION, AND TO ASSURE THAT
THE WORK IS ACCOMPLISHED IN A TIMELY FASHION AND WITH A MINIMUM DISRUPTION OF
SERVICE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING, IN ADVANCE, ALL
PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE AS WELL AS THE UTILITY
COMPANIES.
7. NO WORK MAY COMMENCE WITHIN ANY PUBLIC STORM WATER, SANITARY SEWER OR POTABLE
WATER SYSTEM UNTIL THE CONTRACTOR NOTIFIES THE UTILITY PROVIDER. NOTIFICATION
SHALL BE A MINIMUM OF TWO (2) WORKING DAYS PRIOR TO COMMENCEMENT OF ANY WORK. AT
THE DISCRETION OF THE WATER UTILITY PROVIDER, A PRE-CONSTRUCTION MEETING MAY BE
REQUIRED PRIOR TO COMMENCEMENT OF ANY WORK.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING
CONSTRUCTION AND FOR COORDINATING WITH THE APPROPRIATE UTILITY COMPANY FOR ANY
UTILITY CROSSINGS REQUIRED.
9. THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES
ALONG THE ROUTE OF THE WORK BEFORE COMMENCING NEW CONSTRUCTION. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR UNKNOWN UNDERGROUND UTILITIES.
10. WHEN APPLICABLE, THE CONTRACTOR SHALL HAVE, ONSITE AT ALL TIMES, THE NOTICE OF
INTENT (NOI), A BEST MANAGEMENT PRACTICES MAINTENANCE FOLDER, AN UP TO DATE
STORMWATER MANAGEMENT PLAN (SWMP) THAT ACCURATELY REPRESENTS CURRENT FIELD
CONDITIONS, ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE
APPROPRIATE STANDARDS AND SPECIFICATIONS, AND A COPY OF ANY PERMITS AND
EXTENSION AGREEMENTS NEED ED FOR THE JOB.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY. REFER TO
OSHA PUBLICATION 2226, EXCAVATING AND TRENCHING.
12. IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD
INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE
CONTRACTOR SHALL CONTACT THE DESIGNER AND THE CITY OF LOVELAND ENGINEER
IMMEDIATELY.
13. ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF
SAID STANDARD, UNLESS SPECIFICALLY STATED OTHERWISE.
14. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION TRAFFIC CONTROL PLAN, IN ACCORDANCE
WITH MUTCD, TO THE APPROPRIATE RIGHT-OF-WAY AUTHORITY (CDOT & CITY OF LOVELAND),
FOR APPROVAL, PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN, OR AFFECTING, THE
RIGHT-OF-WAY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL
TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY THE CONSTRUCTION ACTIVITIES.
15. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY
FOR THE COMPLETION OF THE INTENDED IMPROVEMENTS, SHOWN ON THESE DRAWINGS, OR
DESIGNATED TO BE PROVIDED, INSTALLED, OR CONSTRUCTED, UNLESS SPECIFICALLY NOTED
OTHERWISE.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSURING THAT NO MUD OR DEBRIS SHALL BE
TRACKED ONTO THE EXISTING PUBLIC STREET SYSTEM. MUD AND DEBRIS MUST BE REMOVED
BY THE END OF EACH WORKING DAY BY AN APPROPRIATE MECHANICAL METHOD (I.E. MACHINE
BROOM SWEEP, LIGHT DUTY FRONT-END LOADER, ETC.) OR AS APPROVED BY THE CITY OF
LOVELAND STREET INSPECTOR.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET
OF RECORD DRAWINGS KEPT ON THE CONSTRUCTION SITE, AND AVAILABLE TO THE CITY OF
LOVELAND’S INSPECTOR AT ALL TIMES.
18. DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. IF
PERTINENT DIMENSIONS ARE NOT SHOWN, CONTACT THE DESIGNER FOR CLARIFICATION, AND
ANNOTATE THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS.
19. THE CONTRACTOR SHALL COMPLY WITH ALL TERMS AND CONDITIONS OF THE COLORADO
PERMIT FOR STORM WATER DISCHARGES (SDP), THE STORM WATER MANAGEMENT PLAN
(SWMP), AND THE EROSION CONTROL PLAN.
20. ALL STRUCTURAL EROSION CONTROL MEASURES SHALL BE INSTALLED, AT THE LIMITS OF
CONSTRUCTION AND AT AREAS WITH DISTURBED SOIL, ON OR OFF-SITE, PRIOR TO ANY OTHER
GROUND-DISTURBING ACTIVITY. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED IN
GOOD REPAIR BY THE CONTRACTOR, UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS IS
STABILIZED WITH HARD SURFACE OR LANDSCAPING. TO MITIGATE EROSION, THE CONTRACTOR
SHALL USE STANDARD EROSION CONTROL TECHNIQUES DESCRIBED IN THE "URBAN STORM
DRAINAGE CRITERIA MANUAL, VOLUME 3 – BEST MANAGEMENT PRACTICES"AS PUBLISHED BY
THE URBAN DRAINAGE AND FLOOD CONTROL DISTRICT (UDFCD).
21. THE CONTRACTOR SHALL SEQUENCE INSTALLATION OF UTILITIES IN SUCH A MANNER AS TO
MINIMIZE POTENTIAL UTILITY CONFLICTS. IN GENERAL, STORM SEWER AND SANITARY SEWER
SHOULD BE CONSTRUCTED PRIOR TO INSTALLATION OF THE WATER LINES AND DRY UTILITIES.
22. THERE SHALL BE NO SITE CONSTRUCTION ACTIVITIES ON SATURDAYS, UNLESS SPECIFICALLY APPROVED BY THE CITY OF LOVELAND ENGINEER, AND NO SITE CONSTRUCTION ACTIVITIES ON
SUNDAYS OR HOLIDAYS, UNLESS THERE IS PRIOR WRITTEN APPROVAL BY THE CITY OF
LOVELAND.
23. UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A
CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED BEFORE CONSTRUCTION, OR TO
THE GRADES AND CONDITION AS REQUIRED BY THESE PLANS.
24. EXISTING FENCES, TREES, STREETS, SIDEWALKS, CURBS AND GUTTERS, LANDSCAPING,
STRUCTURES, AND IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO
CONSTRUCTION OF THIS PROJECT SHALL BE REPLACED OR RESTORED IN LIKE KIND AT THE
CONTRACTOR’S EXPENSE, UNLESS OTHERWISE INDICATED ON THESE PLANS.
25. OVERLOT GRADING CONSTRUCTION MUST COMPLY WITH THE STATE OF COLORADO PERMITTING
PROCESS FOR “STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY.
CONTACT THE COLORADO DEPARTMENT OF PUBLIC HEALTH & ENVIRONMENT (CDPHE), WATER
QUALITY CONTROL DIVISION AT (303) 692-3500.
26. A STATE CONSTRUCTION DE-WATERING WASTEWATER DISCHARGE PERMIT IS REQUIRED IF
DEWATERING IS REQUIRED IN ORDER TO INSTALL UTILITIES OR WATER IS DISCHARGED INTO A
STORM SEWER, CHANNEL, IRRIGATION DITCH OR ANY WATERS OF THE UNITED STATES.
CONTACT THE COLORADO DEPARTMENT OF PUBLIC HEALTH & ENVIRONMENT (CDPHE), WATER
QUALITY CONTROL DIVISION AT (303) 692-3500.
27. THE CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING AND VERIFYING ELEVATIONS OF ALL EXISTING SEWER MAINS, WATER MAINS, CURBS, GUTTERS AND OTHER UTILITIES AT THE POINTS OF CONNECTION SHOWN ON THE PLANS, AND AT ANY UTILITY CROSSINGS PRIOR TO INSTALLING ANY OF THE NEW IMPROVEMENTS. IF A CONFLICT EXISTS AND/OR A DESIGN MODIFICATION IS
REQUIRED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE
DESIGN. DESIGN MODIFICATION(S) MUST BE APPROVED BY THE CITY OF LOVELAND PRIOR TO
BEGINNING CONSTRUCTION.
28. AFTER ACCEPTANCE BY THE CITY OF LOVELAND, PUBLIC IMPROVEMENTS DEPICTED IN THESE
PLANS SHALL BE GUARANTEED TO BE FREE FROM MATERIAL AND WORKMANSHIP DEFECTS FOR
A PERIOD OF TWO YEARS FROM THE DATE OF ACCEPTANCE.
29. THESE PUBLIC IMPROVEMENT CONSTRUCTION PLANS SHALL BE VALID FOR A PERIOD OF THREE
YEARS FROM THE DATE OF APPROVAL BY THE CITY OF LOVELAND ENGINEER. USE OF THESE
PLANS AFTER THE EXPIRATION DATE WILL REQUIRE A NEW REVIEW AND APPROVAL PROCESS
BY THE CITY OF LOVELAND PRIOR TO COMMENCEMENT OF ANY WORK SHOWN IN THESE PLANS.
30. PAVING SHALL NOT START UNTIL A SOILS REPORT AND PAVEMENT DESIGN IS ACCEPTED BY THE
CITY OF LOVELAND ENGINEER AND SUB-GRADE COMPACTION TESTS ARE TAKEN AND ACCEPTED
BY THE CITY OF LOVELAND ENGINEER.
31. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING SOILS TESTS WITHIN THE PUBLIC RIGHT-OF-WAY AFTER RIGHT-OF-WAY GRADING AND ALL UTILITY TRENCH WORK IS COMPLETE. IF
THE FINAL SOILS/PAVEMENT DESIGN REPORT DOES NOT CORRESPOND WITH THE RESULTS OF
THE ORIGINAL GEOTECHNICAL REPORT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR A
RE-DESIGN OF THE SUBJECT PAVEMENT SECTION OR, THE CONTRACTOR MAY USE THE CITY OF
LOVELAND'S DEFAULT PAVEMENT THICKNESS SECTION(S). REGARDLESS OF THE OPTION USED,
ALL FINAL SOILS/PAVEMENT DESIGN REPORTS SHALL BE PREPARED BY A LICENSED
PROFESSIONAL ENGINEER. THE FINAL REPORT SHALL BE SUBMITTED TO THE INSPECTOR A
MINIMUM OF TEN (10) WORKING DAYS PRIOR TO PLACEMENT OF BASE AND ASPHALT.
PLACEMENT OF BASE AND ASPHALT SHALL NOT OCCUR UNTIL THE ENGINEERING DIVISION
APPROVES THE FINAL REPORT.
32. ALL ROAD CONSTRUCTION IN AREAS DESIGNATED AS WILD FIRE HAZARD AREAS SHALL BE DONE
IN ACCORDANCE WITH THE CONSTRUCTION CRITERIA AS ESTABLISHED IN THE WILD FIRE
HAZARD AREA MITIGATION REGULATIONS IN FORCE AT THE TIME OF FINAL PLAT APPROVAL.
33. PORTIONS OF LARIMER COUNTY ARE WITHIN OVERLAY DISTRICTS. THE LARIMER COUNTY FLOOD
PLAIN RESOLUTION SHOULD BE REFERRED TO FOR ADDITIONAL CRITERIA FOR ROADS WITHIN
THESE DISTRICTS.
34. ALL STATIONING IS BASED ON CENTERLINE OF ROADWAYS UNLESS OTHERWISE NOTED.
CHECKED BY:
B Y
A P
R
D A
T E
D E
S C
R
IP
T
SE
O F
D R
A W
IN
G
S J-
U -B
S H
AL
L
R
ET
AI
N
A
LL
C O
M M
O N
L
AW
, S
TA
TU
TO
R Y, C O
PY
R
IG
H
T
AN
D O
TH
ER
R
ES
ER
VE
D R
IG
H
TS
O
F
TH
ES
E
D R
AW
IN
G S, A N
D T
H E
SA
M
E
SH
AL
L
N O
T
BE
R
EU
SE
D
W
IT
H O
U T
J- U
-B 'S
P R
IO
R
W R
IT
TE
N C
O N
SE
N
T.
AN
Y R
EU
SE
W
IT
H O
U T
W R
IT
TE
N C
O N
SE
N
T
BY
J -U
-B W
IL
L
BE
A
T C
LI
EN
T' S
SO
LE
R
IS
K
AN
D W
IT
H
O U
T
LI
AB
IL
IT
Y
O R
L
EG
AL
E
XP
O
SU
R
E
TO
J -U
-B
N O
R E
V
IS
IO
N
JUB PROJ. # :
INCH, SCALE ACCORDINGLY
AT FULL SIZE, IF NOT ONE
ONE INCH
FILE :
J-U-B ENGINEERS, INC.
J- U
-B E
N G
IN
E
E R
S , I
N C w w w .ju b.
co m
J-U-B ENGINEERS, INC.
C O
N S
T R
U C
T
IO
N
P R
E
LI
M
IN
A R
Y
N O
T F
O R
P
LA
N S
DRAWING:
SHEET: OF
F or t C ol lin s, C O
E . H ar m on y
R d.
P ho ne : 9
.3
.3
S ui te
LAST UPDATED: 10/17/2024
07-23-018_JJ_C-004
\\J U
B \C
E N
T R
A L\
C
LI
E N
T S
\C O
\L O
V E
LA
N
D C
IT
Y
\P R
O
JE
C T
S \0
7-
-0
_P A
R K
S T
R A
IL
H
E A
D S
\D E
S
IG
N \C
A D
\S H
E E
T \J
J\
-2 3-
8_
JJ
_C
-0
.D W
G
P lo t D at e:
/1 7/
:2
A
M P lo tte d B y:
A m y
Lo bs in ge r D at e
C re at ed
:1 0/
/2
SK
YL
IN
E
U S-
T
R
AI
LH
EA
D C
IT
Y
O F
LO
V
E
LA
N D
P A
R K
S
R E
C R
E A
TI
O
N
T A
B U
LA
T
IO
N
S
07-23-018
KRITCHIE
KRITCHIE
SFETZER
C-004 4 20
SURFACE ITEMS
LOCATION
AREA
(SF)
HOT MIX
ASPHALT
(GRADING SX)
(75) (PG 58-28)
AGGREGATE
BASE
COURSE
(CLASS 6)
RECONDITIONING
CONCRETE
SIDEWALK
(6-INCH)
CURB &
GUTTER
TYPE 2
(SECTION
I-M)
MEDIAN COVER
MATERIAL (4 INCH
PATTERNED
CONCRETE)
CRUSHER
FINES NOTES:
TON TON SY SY LF SF CY
SKYLINE TRAILHEAD
PARKING LOT & ACCESS ROAD 26513 664 1424 3128
INCLUDES ADDITIONAL ASPHALT,
A.B.C. AND RECONDITIONING FOR
SAFETY EDGE
JAMOKA JOES ACCESS CONTROL 1609 107 361 283 321
SIDEWALK AND PAD AROUND VAULT TOILET 2123 236 236
PICNIC AREA 1033 115 19
SUBTOTALS 664 1531 3839 236 283 321 19
10% IRREGULARITIES 66 153 384 - - - 2
TOTALS 31278 730 1684 4223 236 283 321 21
SCALE:A SOFT SPOT REPAIR DETAIL
NONE
18" -
6" MINUS
MATERIAL
GEO-GRID
BX110, OR
APPROVED
EQUIVALENT
4" HOT MIX
ASPHALT SECTION
IF THE CONTRACTOR ENCOUNTERS SUBGRADE THAT IS DETERMINED BY THE ENGINEER
TO BE UNSTABLE, CONTRACTOR SHALL EXCAVATE 18" BELOW PROPOSED AGGREGATE
BASE COURSE. CONTRACTOR SHALL THEN INSTALL GEO-GRID ON SUBGRADE, PLACE &
COMPACT 6" MINUS AGGREGATE TO BOTTOM OF AGGREGATE BASE COURSE LAYER AND
INSTALL AN ADDITIONAL GEO-GRID LAYER BEFORE PROCEEDING WITH PLACEMENT OF
REMAINING PLANNED PAVEMENT SECTION. WORK SHALL INCLUDE EXCAVATION,
HAULING AND DISPOSING OF UNSUITABLE MATERIAL, FURNISHING AND PLACING
GEO-GRID FABRIC, AND FURNISHING AND PLACING IMPORTED MATERIAL SHOWN IN SOFT
SPOT REPAIR DETAIL ‘A’ WILL BE ALL INCLUSIVE UNDER ITEM, 203-00050 - UNSUITABLE
MATERIAL (CY). ENGINEER SHALL DETERMINE LIMITS IN THE FIELD.
6" AGGREGATE
BASE COURSE
EARTHWORK NOTES
1. EARTHWORK QUANTITIES ARE IN-PLACE MEASUREMENTS. NO SHRINK OR SWELL
FACTORS WERE APPLIED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
INTERPRET THE SOIL CONDITION AND APPLY COMPACTION AND/OR SWELL
FACTORS.
2. EARTHWORK QUANTITIES HAVE BEEN ADJUSTED TO ACCOUNT FOR 4 INCHES OF
TOPSOIL PLACED ON ALL DISTURBED AREAS NOT SURFACED.
3. SOIL R-VALUES SHALL BE AS FOLLOWS:
EMBANKMENT WITHIN PARKING LOT PRISM AND ACCESS ROAD ≥ 10
A.B.C CLASS 6 ≥ 78
ANY EXCAVATION ON THE PROJECT WILL BE ALLOWED FOR USE AS EMBANKMENT
MATERIAL IF THE MATERIAL MEETS, OR CAN BE CONDITIONED TO MEET THE
MINIMUM R-VALUES OUTLINED ABOVE.
4. REFER TO GEOTECHNICAL REPORT NO. 1232020 PREPARED BY EARTH
ENGINEERING CONSULTANTS ON APRIL 28, 2023 FOR COMPLETE
RECOMMENDATIONS REGARDING PAVEMENT, SUB-BASE AND SUB-GRADE
PREPARATION.
SUMMARY OF EARTHWORK QUANTITIES
EXCAVATION MATERIAL
UNCLASSIFIED EXCAVATION (FOR INFORMATION ONLY) CUBIC
YARDS
SURFACED AREAS 822
LANDSCAPE* 520
TOTAL EXCAVATION 1,342
EMBANKMENT MATERIAL
EMBANKMENT MATERIAL (CIP) CUBIC YARDS
SURFACED AREAS 1,217
LANDSCAPE* 1,104
TOTAL EMBANKMENT (CIP) 2,321
TOPSOIL (IMPORT) CUBIC YARDS
SURFACED AREAS 0
LANDSCAPE* 300
TOTAL TOPSOIL (IMPORT) 300
SUMMARY OF APPROXIMATE QUANTITIES
CONTRACT
ITEM NO.
CONTRACT
SECTION
NO.
CONTRACT ITEM UNIT
PROJECT TOTALS
PLAN AS CONST.
1 201-00000 Clearing & Grubbing LS 1 2 202-00010 Removal of Tree EACH 12 3 202-00080 Removal of Post EACH 3 4 202-00220 Removal of Asphalt Mat SY 55 5 202-01000 Removal of Fence LF 705 6 203-00060 Embankment Material (Complete in Place) CY 2,321
7 203-00050 Unsuitable Material CY 50 8 203-02330 Laborer HR 20 9 207-00205 Topsoil CY 300
10 208-00023 Erosion Log Type 3 (12 Inch) LF 1,100
11 208-00020 Silt Fence LF 250 12 208-00045 Concrete Washout Structure EACH 1 13 208-00075 Pre-fabricated Vehicle Tracking Pad EACH 1 14 208-00103 Removal and Disposal of Sediment (Labor) HR 20 15 208-00105 Removal and Disposal of Sediment (Equipment) HR 10 16 208-00106 Sweeping (Sediment Removal) HR 11 17 208-00207 Erosion Control Management DAY 10 18 210-00010 Reset Mailbox Structure EACH 1 19 210-04050 Adjust Valve Box EACH 2 20 212-00006 Seeding (Native) ACRE 1 21 212-00032 Soil Conditioning ACRE 1 22 213-00002 Mulching (Weed Free Hay) ACRE 1 23 213-00061 Mulch Tackifier LB 128 24 216-00041 Soil Retention Blanket (Straw/Coconut) (Biodegradable Class 1) SY 840 25 216-00301 Turf Reinforcement Mat SY 50 26 217-00015 Noxious Weed Management HR 20 27 304-06000 Aggregate Base Course (Class 6) TON 1,684
28 304-09006 Crusher Fines CY 21 29 306-01000 Reconditioning SY 4,223
30 403-34721 Hot Mix Asphalt (Grading SX) (75) (PG 58-28) TON 730 31 403-40005 Asphalt Speed Hump EACH 1 32 506-00218 Riprap (18 Inch) CY 17 33 506-00406 Soil Riprap (6 Inch) CY 131 34 603-01305 30 Inch Reinforced Concrete Pipe (Complete In Place) LF 87 35 603-05030 30 Inch Reinforced Concrete End Section EACH 1 36 604 Vault Toilet - No Electric EACH 1 37 604-20000 Outlet Structure EACH 1 38 607-11460 Fence Wood Railing LF 205 39 607-11525 Fence (Plastic) LF 450 40 607-60610 Vehicle Gate EACH 1 41 608-00006 Concrete Sidewalk (6 Inch) SY 236 42 609-21011 Curb and Gutter Type 2 (Section I-M) LF 283 43 610-00024 Median Cover Material (4 Inch Patterened Concrete) SF 321 44 613-30005 Light Standard and Luminaire (Solar) EACH 2 45 614-00010 Sign Panel (Class I) SF 41 46 614-00216 Steel Sign Post (2x2 Inch Tubing) LF 172 47 614-00218 Steel Sign Post (2.25x2.25 Inch Tubing) LF 42 48 620-00020 Sanitary Facility EACH 1 49 622-00010 Bicycle Rack EACH 1 50 622-00050 OL Kiosk (Install Only) EACH 1 51 622-00200 Table EACH 2 52 622-00351 Dog Waste Bag Holder EACH 1 53 622-00352 Trash Receptacle (Bear Resistant) EACH 1 54 622-00550 Wheel Stop (Concrete) EACH 17 55 625-00000 Construction Surveying LS 1 56 626-00000 Mobilization LS 1 57 627-00001 Pavement Marking Paint GAL 5 58 627-30405 Preformed Thermoplastic Pavement Marking (Word-Symbol) SF 60 59 630-00016 Traffic Control LS 1
60 700-70010 F/A Minor Contract Revisions FA 1
*INCLUDES AREA OF SOIL RIPRAP
50655064
50955091
5092 50 93 5094
US HIGHWAY 34/
EISENHOWER BLVD.
LOUDEN DITCH
2', TYP.
60.00' INGRESS-EGRESS, UTILITY
& DITCH ACCESS EASEMENT
FOUND #4 REBAR
W/ GPC LS 34995
FOUND #4 REBAR
W/ GPC LS 34995
PRESERVE TREE(S), REMOVE
ONLY IF NECESSARY FOR
CONSTRUCTION
PRESERVE TREE, REMOVE
ONLY IF NECESSARY FOR
CONSTRUCTION
REMOVAL OF
FENCE (±170 LF)
REMOVAL OF
FENCE (±170 LF)
REMOVAL OF
FENCE (±365 LF)
REMOVAL OF
ASPHALT MAT (±55 SY)
SAWCUT
RESET MAILBOX
STRUCTURE
REMOVAL
OF POST
PROTECT
HYDRANT IN-PLACE
CP A
5092.17 N=1392322.91 E=3100762.58
CP D
5082.58 N=1392126.04 E=3101090.07
CP C
5070.82 N=1391925.62 E=3101093.71
CP F
5066.46 N=1391752.42 E=3100987.18
CP E
5067.04 N=1391676.87 E=3100758.19
CP B
5063.50 N=1391841.01
E=3100857.15 PROTECT CULVERT
IN-PLACE
N:1391791.01 E:3100863.82
N:1391694.28 E:3100634.20
ADJUST VALVE
BOX
ADJUST VALVE
BOX
EXISTING UTILITY POLE TO
BE RELOCATED BY OTHERS
PRIOR TO CONSTRUCTION
PROTECT
UTILITY POLE
IN-PLACE
SALVAGE ADDRESS
SIGN FOR REUSE
DESIGN BY:
DRAWN BY:
CHECKED BY:
B Y
A P
R
D A
T E
D E
S C
R
IP
T
SE
O F
D R
A W
IN
G
S J-
U -B
S H
AL
L
R
ET
AI
N
A
LL
C O
M M
O N
L
AW
, S
TA
TU
TO
R Y, C O
PY
R
IG
H
T
AN
D O
TH
ER
R
ES
ER
VE
D R
IG
H
TS
O
F
TH
ES
E
D R
AW
IN
G S, A N
D T
H E
SA
M
E
SH
AL
L
N O
T
BE
R
EU
SE
D
W
IT
H O
U T
J- U
-B 'S
P R
IO
R
W R
IT
TE
N C
O N
SE
N
T.
AN
Y R
EU
SE
W
IT
H O
U T
W R
IT
TE
N C
O N
SE
N
T
BY
J -U
-B W
IL
L
BE
A
T C
LI
EN
T' S
SO
LE
R
IS
K
AN
D W
IT
H
O U
T
LI
AB
IL
IT
Y
O R
L
EG
AL
E
XP
O
SU
R
E
TO
J -U
-B
N O
R E
V
IS
IO
N
JUB PROJ. # :
INCH, SCALE ACCORDINGLY
AT FULL SIZE, IF NOT ONE
ONE INCH
FILE :
J-U-B ENGINEERS, INC.
J- U
-B E
N G
IN
E
E R
S , I
N C w w w .ju b.
co m
J-U-B ENGINEERS, INC.
C O
N S
T R
U C
T
IO
N
P R
E
LI
M
IN
A R
Y
N O
T F
O R
P
LA
N S
DRAWING:
SHEET: OF
F or t C ol lin s, C O
E . H ar m on y
R d.
P ho ne : 9
.3
.3
S ui te
VERTICAL DATUM:
NATIONAL GEODETIC VERTICAL DATUM 1929 (NGVD29) & GEIOD18.
BENCHMARK: CITY OF LOVELAND BENCHMARK "95 13" ELEV=5058.66'
HORIZONTAL DATUM:
COLORADO STATE PLANE COORDINATES NAD 83(2011) DATUM. (NAD83 COLORADO STATE
PLANES, NORTH ZONE, US FOOT - CODE: CO83-NF)
HORIZONTAL CONTROL BASED UPON TRIMBLE VRS NETWORK.
NOTE:
1. THIS DRAWING IS SCALED TO GROUND/PROJECT COORDINATES. TO REDUCE TO STATE
PLANE COORDINATES, SCALE AT 0.99972035 (1.00027973) ABOUT THE ORIGIN (0,0).
2. ALL PROPERTY PINS, INTERSECTION MONUMENTS, AND SECTION CORNERS DISTURBED
DURING CONSTRUCTION MUST BE REFERENCED AND REPLACED UNDER THE SUPERVISION
OF A LICENSED SURVEYOR.
3. THIS AUTOCAD DRAWING CONTAINS INFORMATION THAT IS NOT VISIBLE ON THE PLOTTED
COPY. TO OBTAIN ALL THE INFORMATION THAT IS AVAILABLE IN THIS DRAWING, ALL THE
AUTOCAD LAYERS MUST BE TURNED ON AND THAWED.
4. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE
AREA OF THE WORK BEFORE COMMENCING NEW CONSTRUCTION. THE CONTRACTOR SHALL
BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE
FOR ALL UNKNOWN UNDERGROUND UTILITIES.
5. ALL PROJECT CONTROL LISTED HEREON IS PROVIDED AS A COURTESY. IT IS THE
RESPONSIBILITY OF THE RECIPIENT TO VERIFY THE ACCURACY OF THE COORDINATES AND
ELEVATIONS SHOWN PRIOR TO USING THEM FOR ANY PURPOSES.
LAST UPDATED: 8/28/2024
07-23-018_JJ_C-005
\\J U
B \C
E N
T R
A L\
C
LI
E N
T S
\C O
\L O
V E
LA
N
D C
IT
Y
\P R
O
JE
C T
S \0
7-
-0
_P A
R K
S T
R A
IL
H
E A
D S
\D E
S
IG
N \C
A D
\S H
E E
T \J
J\
-2 3-
8_
JJ
_C
-0
.D W
G
P lo t D at e:
/1 7/
:2
A
M P lo tte d B y:
A m y
Lo bs in ge r D at e
C re at ed
:8 /2
8/
SK
YL
IN
E
U S-
T
R
AI
LH
EA
D C
IT
Y
O F
LO
V
E
LA
N D
P A
R K
S
R E
C R
E A
TI
O
N
E X
IS
T
IN
G
T O
P O
G R
A P
H Y
A N
D R
E M
O V
A
LS
07-23-018
KRITCHIE
KRITCHIE
SFETZER
C-005 5 20
REMOVAL OF
ASPHALT MAT
REMOVAL NOTES:
1. COST OF PAVEMENT SAWCUTS SHALL BE INCIDENTAL TO OTHER PAY ITEMS.
REMOVAL OF FENCE
REMOVAL OF TREE
OR STUMP
LEGEND:
PROPOSED CUT LINE
PROPOSED FILL LINE
CUT
FILL
N
SCALE IN FEET
36'
86'
R 114'
R30'
R30
R40
R40'
R40
R40'
R15'
R20'
4.00'
FL-FL
R 60'
R 60'
28.00'
100+00
1+
102+00
103+00 103+44
BP: 100+00.00
N:1391768.71 E:3100790.75
EP: 103+43.63
N:1391953.11 E:3100975.90
PC: 100+31.19
PC: 101+05.37
PC: 102+24.03
PT: 100+47.68
PT: 101+59.09
PT: 102+40.24
N22°30'45.80"W 31.19'
N03°36'45.57"W 57.68'
N66°25'20.16"E 64.94' N84°59'59.89"E 103.38'
L=16.49 D=018°54'00"
R=50.00'
L=53.72 D=070°02'06"
R=43.95'
L=16.21 D=018°34'40"
R=50.00'
N:1391791.01 E:3100863.82
N:1391808.03 E:3100789.48
N:1391871.94 E:3100785.44
N:1391901.32 E:3100803.38
N:1391927.29 E:3100862.87
N:1391930.15 E:3100874.13
N:1391934.89 E:3100928.25
N:1391909.55 E:3100960.51
N:1391875.61 E:3100999.86
N:1391875.51 E:3101019.79
N:1391915.51 E:3101059.98
N:1392001.77 E:3101059.98
N:1392041.77 E:3101020.06
N:1392041.81 E:3101000.06
N:1392001.81 E:3100959.98
N:1392022.59 E:3100941.35
N:1392036.06 E:3100939.19
N:1392056.48 E:3100931.20
N:1392065.95 E:3100934.33
N:1392009.90 E:3101004.98
N:1392013.80 E:3101014.98
N:1392001.68 E:3101035.98
N:1391917.97 E:3100983.98
N:1391981.52 E:3101014.98
N:1391981.52 E:3101004.98
N:1392066.02 E:3100978.36
N:1392046.61 E:3100960.42
N:1392052.05 E:3100944.28
N:1392040.63 E:3100990.28
N:1391993.26 E:3100959.98
N:1391963.38 E:3100932.59
N:1391958.05 E:3100871.69
N:1391952.95 E:3100851.67
N:1391924.39 E:3100786.22
N:1391849.18 E:3100758.82
N:1391793.37 E:3100756.72 N:1391784.82
E:3100817.75
N:1391706.76 E:3100657.97
N:1391710.43 E:3100656.38
N:1391748.09 E:3100752.76
N:1391751.78 E:3100751.22
N:1391772.69 E:3100759.88
N:1391774.22 E:3100763.57
N:1391777.50 E:3100762.21
N:1391775.97 E:3100758.52
N:1392059.91 E:3100952.42
N:1392089.14 E:3100961.22
N:1392015.84 E:3101035.98
N:1391903.84 E:3101035.98
N:1391903.80 E:3100983.98
N:1392015.88 E:3100983.98
N:1392036.65 E:3100980.31
N:1392090.66 E:3100971.04
N:1392072.49 E:3100965.14
R95'
R10'
R105'
R
.0 0'
R30.00'
N:1391964.27 E:3100786.54
N:1391963.98 E:3100744.69
N:1391917.11 E:3100755.09
N:1391694.28 E:3100634.20
R2.00'
8' 38' 8'
DESIGN BY:
DRAWN BY:
CHECKED BY:
B Y
A P
R
D A
T E
D E
S C
R
IP
T
SE
O F
D R
A W
IN
G
S J-
U -B
S H
AL
L
R
ET
AI
N
A
LL
C O
M M
O N
L
AW
, S
TA
TU
TO
R Y, C O
PY
R
IG
H
T
AN
D O
TH
ER
R
ES
ER
VE
D R
IG
H
TS
O
F
TH
ES
E
D R
AW
IN
G S, A N
D T
H E
SA
M
E
SH
AL
L
N O
T
BE
R
EU
SE
D
W
IT
H O
U T
J- U
-B 'S
P R
IO
R
W R
IT
TE
N C
O N
SE
N
T.
AN
Y R
EU
SE
W
IT
H O
U T
W R
IT
TE
N C
O N
SE
N
T
BY
J -U
-B W
IL
L
BE
A
T C
LI
EN
T' S
SO
LE
R
IS
K
AN
D W
IT
H
O U
T
LI
AB
IL
IT
Y
O R
L
EG
AL
E
XP
O
SU
R
E
TO
J -U
-B
N O
R E
V
IS
IO
N
JUB PROJ. # :
INCH, SCALE ACCORDINGLY
AT FULL SIZE, IF NOT ONE
ONE INCH
FILE :
J-U-B ENGINEERS, INC.
J- U
-B E
N G
IN
E
E R
S , I
N C w w w .ju b.
co m
J-U-B ENGINEERS, INC.
C O
N S
T R
U C
T
IO
N
P R
E
LI
M
IN
A R
Y
N O
T F
O R
P
LA
N S
DRAWING:
SHEET: OF
F or t C ol lin s, C O
E . H ar m on y
R d.
P ho ne : 9
.3
.3
S ui te
LAST UPDATED: 5/16/2024
07-23-018_JJ_C-006
\\J U
B \C
E N
T R
A L\
C
LI
E N
T S
\C O
\L O
V E
LA
N
D C
IT
Y
\P R
O
JE
C T
S \0
7-
-0
_P A
R K
S T
R A
IL
H
E A
D S
\D E
S
IG
N \C
A D
\S H
E E
T \J
J\
-2 3-
8_
JJ
_C
-0
.D W
G
P lo t D at e:
/1 7/
:2
A
M P lo tte d B y:
A m y
Lo bs in ge r
D at e C re at ed :5
/1 6/
SK
YL
IN
E
U S-
T
R
AI
LH
EA
D C
IT
Y
O F
LO
V
E
LA
N D
P A
R K
S
R E
C R
E A
TI
O
N
G E
O M
E T
R
IC
S
07-23-018
KRITCHIE
KRITCHIE
SFETZER
C-006 6 20
N
200 40
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
US - 34
RO
SSUM
DR.
LO
UD
EN
D
IT
CH
OWNER:
MONOSSO KENNETH
DALE/SALLY ANN
PARCEL:
9508400038
OWNER:
WILLIAMS CHRISTINE M
PARCEL:
9508400006
OWNER:
CITY OF LOVELAND
PARCEL:
9508118901
OWNER:
WILLIAMS CHRISTINE M
PARCEL:
9508400006
OWNER:
CITY OF LOVELAND
PARCEL:
9508400944
OWNER:
CITY OF LOVELAND
PARCEL:
9508400904
OWNER:
4409 W EISENHOWER LTD
LIABILITY CO
PARCEL:
9508400034
OWNER:
RUTLEDGE MARVIN
DOUGLAS/SHEILA H
PARCEL:
9517106004
EDGE OF EXISTING
CONCRETE DRIVEWAY
JAMOKA JOES
DRIVE-THRU
COFFEE SHOP
PROPOSED VEHICLE GATE
EXISTING RIGHT - OF - WAY
PROPOSED PARKING AREA
PROPOSED
VAULT TOILET
EXISTING DITCH
ACCESS ROAD
PROPOSED FENCE,
TIE INTO EXISTING
PROPOSED
ASPHALT
ACCESS ROAD
EXISTING
BRIDGE
PROPOSED ACCESS
CONTROL MEDIAN
DESIGN BY:
DRAWN BY:
CHECKED BY:
B Y
A P
R
D A
T E
D E
S C
R
IP
T
SE
O F
D R
A W
IN
G
S J-
U -B
S H
AL
L
R
ET
AI
N
A
LL
C O
M M
O N
L
AW
, S
TA
TU
TO
R Y, C O
PY
R
IG
H
T
AN
D O
TH
ER
R
ES
ER
VE
D R
IG
H
TS
O
F
TH
ES
E
D R
AW
IN
G S, A N
D T
H E
SA
M
E
SH
AL
L
N O
T
BE
R
EU
SE
D
W
IT
H O
U T
J- U
-B 'S
P R
IO
R
W R
IT
TE
N C
O N
SE
N
T.
AN
Y R
EU
SE
W
IT
H O
U T
W R
IT
TE
N C
O N
SE
N
T
BY
J -U
-B W
IL
L
BE
A
T C
LI
EN
T' S
SO
LE
R
IS
K
AN
D W
IT
H
O U
T
LI
AB
IL
IT
Y
O R
L
EG
AL
E
XP
O
SU
R
E
TO
J -U
-B
N O
R E
V
IS
IO
N
JUB PROJ. # :
INCH, SCALE ACCORDINGLY
AT FULL SIZE, IF NOT ONE
ONE INCH
FILE :
J-U-B ENGINEERS, INC.
J- U
-B E
N G
IN
E
E R
S , I
N C w w w .ju b.
co m
J-U-B ENGINEERS, INC.
C O
N S
T R
U C
T
IO
N
P R
E
LI
M
IN
A R
Y
N O
T F
O R
P
LA
N S
DRAWING:
SHEET: OF
F or t C ol lin s, C O
E . H ar m on y
R d.
P ho ne : 9
.3
.3
S ui te
LAST UPDATED: 5/16/2024
07-23-018_JJ_C-007
\\J U
B \C
E N
T R
A L\
C
LI
E N
T S
\C O
\L O
V E
LA
N
D C
IT
Y
\P R
O
JE
C T
S \0
7-
-0
_P A
R K
S T
R A
IL
H
E A
D S
\D E
S
IG
N \C
A D
\S H
E E
T \J
J\
-2 3-
8_
JJ
_C
-0
.D W
G
P lo t D at e:
/1 7/
:2
A
M P lo tte d B y:
A m y
Lo bs in ge r D at e
C re at ed
:5 /1
3/
SK
YL
IN
E
U S-
T
R
AI
LH
EA
D C
IT
Y
O F
LO
V
E
LA
N D
P A
R K
S
R E
C R
E A
TI
O
N
S
IT
E O
V E
R V
IE
W
07-23-018
KRITCHIE
KRITCHIE
SFETZER
C-007 7 20
N
PROPOSED CONCRETE
WHEEL STOP, TYP.
PROPOSED
VAULT TOILET
PROPOSED OL KIOSK (INSTALL ONLY),
ANIMAL PROOF TRASH CAN, DOG
WASTE BAG HOLDER
US HIGHWAY 34/
EISENHOWER BLVD.
PROPOSED
PICNIC TABLE
PROPOSED CULVERT
CROSSING A, SEE
PROFILE BELOW
0+
1+
-0+13 0+00 0+50 1+001+02
STR-A2
WATER QUALITY
OUTLET STRUCTURE
(SEE DWG C-020 FOR DETAIL)
STA: 0+87.26
N: 1391986.29 E: 3100894.22
17 CY RIPRAP
(15'L X 10'W X 3'D)
(SEE NOTE #5)
FE
S-
A1
ST
A:
+0 0.
IN
V O
U T:
6.
0"
(N
ST
R
-A
ST
A:
+8
7.
IN
V
IN
: 5
8.
0" (S
CULVERT CROSSING A
INV. ELEV:
5056.56
INV. ELEV:
5058.67
87 LF 30" RCP @ 2.06%
PROPOSED
GRADE
EXISTING
GROUND
RESET MAILBOX
STRUCTURE
R7-8 (12" X 18") R7-8p (18" X 9")
ACCESSIBLE
VAN
R6-2(R) (18" x24")
R5-1 (30" X 30")
PROPOSED
VEHICLE GATE
PROPOSED WOOD
RAILING FENCE
CONTRACTOR SHALL UTILIZE MUTCD TYPICAL
APPLICATION 6 FOR SHOULDER WORK WITH
MINOR ENCROACHMENT (TA-6) AND MAINTAIN
ACCESS TO ADJACENT PROPERTIES DURING
CONSTRUCTION. COST FOR ALL TRAFFIC
CONTROL LABOR AND EQUIPMENT SHALL BE
INCLUDED IN LUMP SUM PAY ITEM: 630-00016 -
TRAFFIC CONTROL
PROPOSED
BIKE RACK
FES-A1
30" REINFORCED
CONCRETE END SECTION
STA: 0+00.00
N: 1391900.68 E: 3100911.11
28.00'
PROPOSED WOOD
RAILING FENCE
P.I.P FIRE HYDRANT
PROPOSED
SOLAR LIGHT
SPEED HUMP
PER LCUASS
DETAIL 1801F
R1-1 (30'' x 30'')
R1-1 (30'' x 30'')
STOP
STOP
ONE
WAY
DO NOT
ENTER
10'
10.50' SETBACK FROM
PROPERTY LINE
131 CY SOIL
RIPRAP (SEE DWG
C-018 FOR DETAIL)
PROPOSED
SOLAR LIGHT
THERMOPLASTIC
CHEVRONS
PROPOSED DOUBLE
YELLOW STRIPING
(2x4" WITH 4"GAP)
PROPOSED 8" SOLID
WHITE STRIPE
"NO TRESPASSING" (12"x18") R5-11 (30'' x 24'')
AUTHORIZED
VEHICLES
ONLY
PRIVATE
PROPERTY
NO
TRESPASSING
PROPOSED DOUBLE
YELLOW STRIPING
(2x4" WITH 4"GAP)
PROPOSED
THERMOPLASTIC
RIGHT-TURN ARROW
PROPOSED
THERMOPLASTIC
THRU/LEFT ARROW
DESIGN BY:
DRAWN BY:
CHECKED BY:
B Y
A P
R
D A
T E
D E
S C
R
IP
T
SE
O F
D R
A W
IN
G
S J-
U -B
S H
AL
L
R
ET
AI
N
A
LL
C O
M M
O N
L
AW
, S
TA
TU
TO
R Y, C O
PY
R
IG
H
T
AN
D O
TH
ER
R
ES
ER
VE
D R
IG
H
TS
O
F
TH
ES
E
D R
AW
IN
G S, A N
D T
H E
SA
M
E
SH
AL
L
N O
T
BE
R
EU
SE
D
W
IT
H O
U T
J- U
-B 'S
P R
IO
R
W R
IT
TE
N C
O N
SE
N
T.
AN
Y R
EU
SE
W
IT
H O
U T
W R
IT
TE
N C
O N
SE
N
T
BY
J -U
-B W
IL
L
BE
A
T C
LI
EN
T' S
SO
LE
R
IS
K
AN
D W
IT
H
O U
T
LI
AB
IL
IT
Y
O R
L
EG
AL
E
XP
O
SU
R
E
TO
J -U
-B
N O
R E
V
IS
IO
N
JUB PROJ. # :
INCH, SCALE ACCORDINGLY
AT FULL SIZE, IF NOT ONE
ONE INCH
FILE :
J-U-B ENGINEERS, INC.
J- U
-B E
N G
IN
E
E R
S , I
N C w w w .ju b.
co m
J-U-B ENGINEERS, INC.
C O
N S
T R
U C
T
IO
N
P R
E
LI
M
IN
A R
Y
N O
T F
O R
P
LA
N S
DRAWING:
SHEET: OF
F or t C ol lin s, C O
E . H ar m on y
R d.
P ho ne : 9
.3
.3
S ui te
LAST UPDATED: 8/28/2024
07-23-018_JJ_C-008
\\J U
B \C
E N
T R
A L\
C
LI
E N
T S
\C O
\L O
V E
LA
N
D C
IT
Y
\P R
O
JE
C T
S \0
7-
-0
_P A
R K
S T
R A
IL
H
E A
D S
\D E
S
IG
N \C
A D
\S H
E E
T \J
J\
-2 3-
8_
JJ
_C
-0
.D W
G
P lo t D at e:
/1 7/
:2
A
M P lo tte d B y:
A m y
Lo bs in ge r D at e
C re at ed
:8 /2
8/
SK
YL
IN
E
U S-
T
R
AI
LH
EA
D C
IT
Y
O F
LO
V
E
LA
N D
P A
R K
S
R E
C R
E A
TI
O
N
S
IT
E P
LA
N
07-23-018
KRITCHIE
KRITCHIE
SFETZER
C-008 8 20
KEYED NOTES:
PROPOSED AGGREGATE BASE COURSE, SEE SECTION A
PROPOSED HOT MIX ASPHALT PAVEMENT, SEE SECTION B
PROPOSED 6" CRUSHER FINES SURFACING, SEE SECTION C
PROPOSED 6" CONCRETE SIDEWALK
PROPOSED TURF REINFORCEMENT MAT
PROPOSED CURB & GUTTER TYPE 2, SECTION IM, SEE DETAIL ON
DRAWING C-018
PROPOSED CONCRETE MEDIAN COVER MATERIAL, SEE DETAIL ON
DRAWING C-017
PROPOSED PAVEMENT SAFETY EDGE, SEE DETAIL ON DRAWING
C-016
PROPOSED PARKING LOT STRIPING, TYPICAL 4" WIDE SOLID WHITE
PROPOSED FIRE LANE NO PARKING SIGN, PER LCUASS DETAIL 1418,
SEE DRAWING C-018
NOTES
1. SEE DRAWING C-005 FOR EXISTING TOPOGRAPHY AND REMOVALS.
2. SEE DRAWING C-006 FOR PROJECT GEOMETRICS
3. SEE DRAWING C-009 FOR PROJECT GRADING.
4. SEE DRAWING C-014 TO C-015 FOR EROSION CONTROL MEASURES..
5. NOMINAL STONE SIZE OF RIPRAP (d50) IS 18 INCHES, PER CDOT
TABLE 506-2. RIPRAP SHALL BE UNDERLAIN BY MIRAFI FW 402
GEOTEXTILE (OR APPROVED EQUIVALENT) AND 6" OF TYPE II
GRANULAR BEDDING. COST OF GEOTEXTILE AND BEDDING MATERIAL
SHALL BE INCLUDED IN THE COST OF THE RIPRAP.
PROPOSED LIMITS OF FILL
PROPOSED HOT MIX
ASPHALT PAVEMENT
PROPOSED LIMITS OF CUT
PROPOSED RIPRAP
LEGEND:
PROPOSED
AGGREGATE BASE
COURSE
8" AGGREGATE BASE COURSE
(CLASS 6)
9" SCARIFY, MOISTURE
CONDITION & RE-COMPACT
PAVEMENT SECTIONS:
9" AGGREGATE BASE COURSE
(CLASS 6)
9" SCARIFY, MOISTURE
CONDITION & RE-COMPACT
2" HMA (GRADING SX) (75) (PG 58-28)
2" HMA (GRADING SX) (75) (PG 58-28)
N
SCALE IN FEET
VERT
HORZ
200 40
PROPOSED CONCRETE
SIDEWALK
A
B
C
PROPOSED CRUSHER
FINES
6" CRUSHER FINES
9" SCARIFY, MOISTURE
CONDITION & RE-COMPACT
PROPOSED CONCRETE
MEDIAN COVER
PROPOSED TURF
REINFORCEMENT MAT
100+00 100+50 101+00 101+50 102+00 102+50 103+00 103+50
-4.27% -1.04% -0.16% -2.89% -8.50% 0.00% 8.50% 1.86%
PVI:100+00.00
ELEV: 5069.78
PV
I:1
+2
4.
EL
EV
: 5
6.
PV
I:1
+4
0.
EL
EV
: 5
5.
PV
I:1
+4
8.
EL
EV
: 5
5.
PV
I:1
+8
6.
EL
EV
: 5
5.
PV
I:1
+9
4.
EL
EV
: 5
5.
PV
I:1
+0
7.
EL
EV
: 5
6.
BV
C
S:
+2
7.
BV
C
E:
6.
EV
C
S:
+5
3.
EV
C
E:
6.
BV
C
S:
+0
5.
BV
C
E:
9.
EV
C
S:
+0
2.
EV
C
E:
6.
96 LP STA: 101+53.93
LP ELEV: 5066.55
PVI STA:101+40.74
PVI ELEV:5066.57
K:30.00
LVC:26.37
EXISTING
GROUND
PROPOSED
GRADE
ACCESS ROAD CENTERLINE PROFILE
5069.60
5069.525069.10
5067.83
5066.25
5066.25 5066.72
5066.26
5066.66
MATCH EXISTING
(5066.89)
5068.04
5070.01
FL:5069.46FL: 5069.09
FL: 5069.31
FL: 5069.03
FL: 5067.30
FL: 5067.68
5068.89
5067.59
5067.09
5066.84
5066.16 5065.68
5065.72
5066.34
5066.60
5067.52
5068.03
5068.21
5068.41
5067.78
5067.75 5067.885067.56
5068.35 5067.91
5067.71 5068.30
5067.68
5067.87
5068.59
5068.75
5069.295068.35
5067.07
5068.51
5068.22
100+00
1+
102+00
103+00 103+44
.9
7%
35.53%
30.37%
.9
4%
.6
1%
26.98%
2.
27.66%
30.96%
28.77%
.1
4%
27.86%
2.
2.24%
2.99%
2.37%
4.12%
2.54%
3.20%
1.92%
2.2 5%
10.03%
15.77%
26.64%
25.53%
19.82%
4.
2.05%
2.
ACCESS ROAD
CENTERLINE
ALIGNMENT
US HIGHWAY 34/
EISENHOWER BLVD.
5068.15
5068.71
5068.21
5069.26
5068.11 5068.72 5068.72
5067.86 5067.64
5067.37
5067.32
5068.31 5068.46
TRANSITION CROSS
SLOPE OF ROADWAY
1.96%
1.97%
MATCH EXISTING
(5067.91)
5068.13
2.03%
2.40%
5065.84
DESIGN BY:
DRAWN BY:
CHECKED BY:
B Y
A P
R
D A
T E
D E
S C
R
IP
T
SE
O F
D R
A W
IN
G
S J-
U -B
S H
AL
L
R
ET
AI
N
A
LL
C O
M M
O N
L
AW
, S
TA
TU
TO
R Y, C O
PY
R
IG
H
T
AN
D O
TH
ER
R
ES
ER
VE
D R
IG
H
TS
O
F
TH
ES
E
D R
AW
IN
G S, A N
D T
H E
SA
M
E
SH
AL
L
N O
T
BE
R
EU
SE
D
W
IT
H O
U T
J- U
-B 'S
P R
IO
R
W R
IT
TE
N C
O N
SE
N
T.
AN
Y R
EU
SE
W
IT
H O
U T
W R
IT
TE
N C
O N
SE
N
T
BY
J -U
-B W
IL
L
BE
A
T C
LI
EN
T' S
SO
LE
R
IS
K
AN
D W
IT
H
O U
T
LI
AB
IL
IT
Y
O R
L
EG
AL
E
XP
O
SU
R
E
TO
J -U
-B
N O
R E
V
IS
IO
N
JUB PROJ. # :
INCH, SCALE ACCORDINGLY
AT FULL SIZE, IF NOT ONE
ONE INCH
FILE :
J-U-B ENGINEERS, INC.
J- U
-B E
N G
IN
E
E R
S , I
N C w w w .ju b.
co m
J-U-B ENGINEERS, INC.
C O
N S
T R
U C
T
IO
N
P R
E
LI
M
IN
A R
Y
N O
T F
O R
P
LA
N S
DRAWING:
SHEET: OF
F or t C ol lin s, C O
E . H ar m on y
R d.
P ho ne : 9
.3
.3
S ui te
LEGEND:
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
FILL
CUT
XXXX.XX FINISHED GRADE ELEVATION
N
SCALE IN FEET
VERT
HORZ
200 40
LAST UPDATED: 5/13/2024
07-23-018_JJ_C-009
\\J U
B \C
E N
T R
A L\
C
LI
E N
T S
\C O
\L O
V E
LA
N
D C
IT
Y
\P R
O
JE
C T
S \0
7-
-0
_P A
R K
S T
R A
IL
H
E A
D S
\D E
S
IG
N \C
A D
\S H
E E
T \J
J\
-2 3-
8_
JJ
_C
-0
.D W
G
P lo t D at e:
/1 7/
:2
A
M P lo tte d B y:
A m y
Lo bs in ge r D at e
C re at ed
:5 /1
3/
SK
YL
IN
E
U S-
T
R
AI
LH
EA
D C
IT
Y
O F
LO
V
E
LA
N D
P A
R K
S
R E
C R
E A
TI
O
N
G R
A D
IN
G
P
LA
N
07-23-018
KRITCHIE
KRITCHIE
SFETZER
C-009 9 20
NOTES
1. SEE DRAWING C-005 FOR EXISTING TOPOGRAPHY
AND REMOVALS.
2. SEE DRAWING C-006 FOR PROJECT GEOMETRICS
Discharge Description Location (Site Map #) Method Statement (Location)
Uncontaminated Spring
Concrete Wash Water (in-ground washout structure)#
Landscape Irrigation Return Flows Discharges from Diversions of State Waters Emergency Fire Fighting
1. SITE DESCRIPTION
The Contractor shall comply with all contractual requirements and all requirements associate with CDPS-SCP on this project. The SWMP Administrator for Construction shall update the SWMP to reflect current project site conditions.
A. PROJECT SITE LOCATION: The project is located directly north of US Highway 34 on the western edge of the Loveland, CO city limits. More specifically, the project can be found at the southeast quarter of Section 8, Township 5 North, Range 69 west of the 6th P.M., County of Larimer, State of Colorado. The construction office can be found at: _________________________________________________________ (To be determined by contractor)
B. PROJECT SITE DESCRIPTION: The project site is located on land owned by the City of Loveland, with access to the site provided by an existing gravel road that connects to US-34 within the highway right-of-way. Proposed improvements to the site include a 17-space asphalt parking lot and accompanying asphalt access road, the starting point of a 10' concrete multi-use trail, concrete median, and a water quality structure to detain runoff and pass flows beneath the access road. Additional site amenities will include bike racks, picnic tables and a vault toilet.
C. PROPOSED SEQUENCING FOR MAJOR CONSTRUCTION ACTIVITIES: The general sequence of activities will include installation of the necessary control measures within the work zone, removal of trees, clearing and grubbing open areas, site grading subgrade preparation, placement of a vault toilet, concrete flatwork installation, hot bituminous paving, placement of aggregate base course, installation of signage and striping, installation of site amenities and final site stabilization including landscape and seeding.
D. ACRES OF DISTURBANCE:
1. Total area of construction site (LOC (PERMITTED AREA)): 1.736 acres
2. Total area of proposed disturbance (LDA): 1.391 acres
3. Total area of seeding: 0.64 acres (Includes additional 10% for irregularities)
4. Total area of pre-project impervious surface: 488 sq. ft.
5. Total area of final impervious surface: 29,646 sq. ft.
EXISTING SOIL DATA: According to the USDA National Resources Conservation Services' Web Soil Survey, the site area with proposed improvements consists of the following soil types:
Connerton-Sylvandale complex - Hydrologic soil group B, K Factor Rating .20 and Wind Erodibility Group Rating 3.
E. EXISTING VEGETATION, INCLUDING PERCENT COVER:
The SWMP Administrator for construction will conduct the Vegetation Transects. If the site is disturbed, an Adequate Reference Site(s) may be utilized, refer to the permit.
Pre-Construction Date of survey: ______________ Percent Existing Vegetative Cover: ______________ Description of existing vegetation: Vegetation in the project site mainly consists of cultivated wheat crop surrounded by native grasses and shrubs.
Method for determining percent vegetative cover:
Include a map or table showing transect locations, photos documenting pre-Construction vegetative cover, and methodology used to determine existing vegetative cover to SWMP tab 17:
Post-Construction Date of survey: ______________ Percent Vegetative Cover: ______________ Description of existing vegetation: Date of CDPS-SCP Closure: ______________ The method used to determine pre-construction percent cover shall be used to determine post construction percent cover.
Include map or table showing transect locations, photos documenting post-Construction vegetative cover, and methodology used to determine existing vegetative cover to SWMP tab 17:
F. POTENTIAL POLLUTANTS SOURCES: Refer to Potential Pollutant Sources in SWMP Section 4A. The SWMP Administrator for Construction shall prepare a list of all potential pollutants and their locations in accordance with subsection 107.25.
G. RECEIVING WATER:
1. Outfall locations: The project site currently drains through a culvert beneath US-34 where is then it carried via open channel flow ±650' south to the Big Thompson River.
2. Names of immediate receiving water(s) on site: N/A.
3. Ultimate receiving water(s): Big Thompson River
4. Description of all stream crossings located within the Construction Site Boundary:
I. ALLOWABLE NON-STORMWATER DISCHARGES:
#Concrete washout water associated with the washing of concrete tools and concrete mixer chutes can be discharged to the ground if site is managed accordingly to prevent the water from leaving the site as surface runoff or reaching receiving waters.
J. DESCRIPTION OF DRAINAGE PATTERNS FROM THE SITE: The site is located in a small valley which funnels runoff from the north, east and west to a low point where flows enter a culvert to pass beneath US-34 and continue south to the the Big Thompson River.
K. ALTERNATIVE DIVERSION CRITERIA: N/A
L. ALTERNATIVE TEMPORARY STABILIZATION SCHEDULE:
2. SITE MAP COMPONENTS
Pre-construction
A. PROJECT CONSTRUCTION POTENTIAL SITE BOUNDARIES: See SWMP site maps.
B. FLOW ARROWS THAT DEPICT STORMWATER FLOW DIRECTIONS ON-SITE, RUN-ON AND RUNOFF DIRECTION: See SWMP site maps.
C. ALL AREAS OF GROUND SURFACE DISTURBANCE: See SWMP site maps.
D. AREAS OF CUT AND FILL: See grading sheet C-009.
E. AREAS USED FOR STORING AND STOCKPILING OF MATERIALS, STAGING AREAS (field trailer, fueling, etc.) and LOCATIONS OF ALL WASTE ACCUMULATION AND BATCH PLANTS INCLUDING MASONRY MIXING STATIONS: See SWMP site maps.
F. LOCATION OF ALL STRUCTURAL CONTROL MEASURES IDENTIFIED IN THE SWMP: See SWMP site maps.
G. LOCATION OF NON-STRUCTURAL CONTROL MEASURES AS APPLICABLE IN THE SWMP: See SWMP site maps.
H. SPRINGS, STREAMS, WETLANDS, DIVERSIONS, AND OTHER STATE WATERS, INCLUDING AREAS THAT REQUIRE PRE-EXISTING VEGETATION BE MAINTAINED WITHIN 50 FEET OF A RECEIVING WATER: See SWMP site maps.
I. LOCATIONS OF ALL STREAM CROSSINGS LOCATED WITHIN THE CONSTRUCTION SITE BOUNDARY: See SWMP site maps.
J. PROTECTION OF TREES, SHRUBS, SENSITIVE HABITAT, AND CULTURAL RESOURCES: See SWMP site maps.
K. LOCATIONS WHERE ALTERNATIVE TEMPORARY STABILIZATION SCHEDULES APPLY: If applicable, see SWMP site maps.
3. QUALIFIED STORMWATER MANAGERS:
A. SWMP ADMINISTRATOR FOR DESIGN: CDOT Certified individual responsible for developing SWMP Plan Sheets and SWMP Site Maps during the design phase.
B. SWMP ADMINISTRATOR FOR CONSTRUCTION: (As defined in Subsection 208) The Contractor shall designate a SWMP Administrator for Construction upon accepting co-permittee of the permit. The SWMP Administrator for Construction shall become the operator for the SWMP and assume responsibility for all design changes to the SWMP implementation and maintenance in accordance to 208.03, the SWMP shall remain the property of CDOT. The SWMP Administrator for Construction shall be responsible for implementing, maintaining and revising SWMP, including the title and contact information. The activities and responsibilities of the SWMP Administrator for Construction shall address all aspects of the project's SWMP. (Update the information below for each new SWMP Administrator for Construction) (A copy of TECS Certification must be included in the SWMP.)
C. EROSION CONTROL INSPECTOR: (As defined in Subsection 208) The Contractor may designate an Erosion Control Inspector. The Erosion Control Inspector shall complete duties in accordance with subsection 208.03 (c) (Copy of TECS Certification must also be included in the SWMP Notebook.)
4. STORMWATER MANAGEMENT CONTROLS FIRST CONSTRUCTION ACTIVITIES
THE CONTRACTOR SHALL PERFORM THE FOLLOWING:
A. POTENTIAL POLLUTANT SOURCES:
Evaluate, identify, locate and describe all potential sources of pollutants at the site in accordance with subsection 107.25, CDPS-SCP and place in the SWMP notebook. All Control Measures related to potential pollutants shall be shown on the SWMP site map by the Contractor’s SWMP Administrator for Construction.
B. OFFSITE DRAINAGE (RUN ON WATER):
Describe and record Control Measures on the SWMP Site Map that have been implemented to address off site run-on water in accordance with subsection 208.03.
Location Stream Name Description Of Any Disturbed Upland Areas
Name/Certification Contact Information
KYLE RITCHIE, #14FA892B 970-377-3602
Name/Title Contact Information Certification # Start Date…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .