02 - Specifications (Items).pdf

PDF 182 KB Posted

Attached to
On-Wafer Probes Federal contract opportunity
Solicitation number
NB6720302200363
Issued by
Department of Commerce National Institute of Standards and Technology

View the file

Other files for this federal contract opportunity

Other files attached to On-Wafer Probes, newest first.
File Type Posted
NB6720302200363 - QAs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements / Specification Document

TITLE: On-Wafer THz Probes

Requesting Laboratory / Division / Group:

Communications Technology Laboratory Radio Frequency Technology Division High-Speed Measurements Group (672.03)

General Statement of Need:

The National Institute of Standards and Technology (NIST)/Communications Technology Laboratory (CTL) need to test nonlinear on-wafer devices to 1 THz. As such, CTL needs on-wafer probes for probing devices from 500 GHz to 1100 GHz. These WR1.5 and WR1.0 probes will be used on custom on-wafer probe station for on-wafer THz electronics. The probe station uses VDI extender heads with a vertical E-field orientation. The station can only control the height of the probe to within about 10 µm, so the probe must be able to tolerate 20 µm of overtravel. The probe should have a bias tee, standard 25 µm pitch, no more than 10 dB of insertion loss and a return loss no greater than -15 dB.

Items and Ancillary Services:

Item 1: WR1.5 On-Wafer Probes Quantity: 4 EACH Specifications: 1.1 Operate between 500 – 750 GHz

1.2 Capable of 20 µm of overtravel

1.3 Have a bias tee

1.4 Standard 25 µm pitch

1.5 No more than 10 dB of insertion loss

1.6 No greater than -15 dB a return loss

Item 2: WR1.5 On-Wafer Probes Quantity: 4 EACH Specifications: 1.1 Operate between 750 – 1100 GHz

1.2 Capable of 20 µm of overtravel

1.3 Have a bias tee

1.4 Standard 25 µm pitch

1.5 No more than 10 dB of insertion loss

1.6 No greater than -15 dB a return loss

Service Requirements / Item Specifications:

Section Requirements/Specifications Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)

☐ Vendor Representative On-Site more than three (3) days.

☐ Other Considerations:

[List other considerations to ensure an accurate quote.] Shipping & Delivery ☐ N/A

Shipping Address:

☒ NIST-Boulder

ATTN: Rich Chamberlin Mail Stop 672.03 325 Broadway Boulder, CO 80305

☐ [Alternate Shipping Address] Shipping Criteria:

☐ Partial Delivery Acceptable

☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to Building Required [Explain Need for Requirement]

☐ Building has Loading Dock Containerization Preference: [Enter Container Type] Other Requirements:

[List Any Other Requirement] Delivery Date Criteria:

☒ Delivery of Goods, Installation, and Training shall be competed no later than: 10 Weeks After Release of Order (ARO) ☐ Delivery No Earlier Than: Click or tap to enter a date.

☐ Other: [List other shipping, delivery or special requirements.] [List Other Shipping, Delivery or Special Requirements.] Electronic Media ☐ N/A

[Enter Electronic Media Requirements by Item.]

☐ Software ☐ Electronic Manuals ☐ License Key ☐ Other:

[List Any Other Electronic Media Requirements] ☐ Email address for Software Delivery:

[Enter Address] Installation ☒ N/A

[Enter Installation Requirements by Item]

☐ Vendor Technician on Site

☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation ☐ Other:

[Enter Details]

NOTE:

When installation is required, TPOC shall be the coordination point.

Facility / Utility Considerations ☐ N/A

[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers

[List Work Order Numbers] ☐ Power Available Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:

[List Any Other Power Considerations.] ☐ Utility Connections:

[List Relevant Available Utilities, Pressure(s) and Flowrate(s).] ☐ Other Considerations:

[List Other Considerations to Ensure an Accurate Quote.] Warranty ☐ N/A

Base Manufacturer Warranty is acceptable

[If you require an Extended Manufacturer Warranty, describe the warranty requirements per item.]

What is included?

☐ Labor ☐ Parts ☐ Travel ☐ Cost and Liability for Returns ☐ Other [Enter Other Requirements] ☐ Warranty Length: [i.e. 3 - Years] Training ☒ N/A

[Training Requirements (Who, When, What, Where)] ☐ On-Site

Is Travel Required: [Choose Answer]

☐ Off-Site Location: [Enter Location(s)] ☐ Number of Trainees: [Enter Number of Trainees] Scope of Training ☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other [Enter Other Scope Requirements] ☐ Training materials to be provided:

[Describe Requirements] ☐ Other [Enter Other Training Requirements] NOTE: When training is required, TPOC shall be coordinator.

Inspection and Acceptance ☐ N/A

[Inspection Requirements Per Item (Who, When, What, Where)] ☐ On-Site

[Inspection Requirements Per Item] ☒ Government Acceptance Expected to Not to Exceed 7 Business Days ☐ Government Acceptance Expected to Exceed 7 Business Days [Duration] ☐ Inspection and Acceptance Plan:

[Explanation] ☐ Other:

[Enter Other Requirements] Maintenance ☒ N/A

[Describe Maintenance Requirements Per Item] Service Plan Length: [i.e. 3 - Years]

What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables ☐ Travel

☐ Cost and Liability for Returns ☐ Software Updates ☐ Manuals l

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)

Government Furnished Material / Equipment

[List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing

☐ Government Equipment which will leave Government Site (TPOC must coordinate with Division Property Custodian)

☒ N/A Description: [Enter Description]

Serial Number: [Enter Serial Number] NIST Property Number: [Enter NIST Property Number] ☐ Other:

[Enter Other Details] Travel ☒ N/A

[Describe any Travel Requirements Per Item] ☐ Explain:

[Enter Justification / Requirement] ☐ Other:

[Enter Other Requirements] NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.

File details come from the government source that posted it. Updated .