02_Exclosure_Removal_01009_general_JJC_06_16_21_Revised.pdf
PDF 555 KB Posted
- Attached to
- FENCE REMOVAL Federal contract opportunity
- Solicitation number
- 140L6221R0045
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140L6221R0045_AMD_0001_QUESTION_AND_ANSWER_0001.docx | DOCX document | |
| Sol_140L6221R0045_Amd_0001.pdf | ||
| 01_Exclosure_Removal_SOW_JJC_06_16_21_Priority_Revised.pdf | ||
| 03_Exclosure_Removal_02827_fence_removal_JJC_06_16_21_Revised.pdf | ||
| 06_Exclosure_Fence_Removal_Bid_Schedule_JJC_06_16_21__Revised.pdf | ||
| 04_Exclosure_Removal_Work_Data_Sheet_JJC_06_16_21.pdf | ||
| Sol_140L6221R0045.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01009
GENERAL INFORMATION AND REQUIREMENTS
Exclosure Removal GENERAL INFORMATION AND REQUIREMENTS
01009 - 1
PART 1: GENERAL
1.1 SUMMARY:
A. Description of Work: Furnishing labor, and equipment to remove approximately 38,263 linear feet of existing fence exclosures.
B. Location: Work under this Contract is located in Sublette and
Sweetwater Counties, Wyoming. Work locations are shown on the maps.
C. Work Data Sheet: Designates the quantity of work required at the project location.
D. Debris: Debris consisting of wood posts, poles, steel posts, and wire shall become the property of the Contractor and shall be removed from the work site. The Contractor shall be responsible for disposal of construction debris in a legal manner, and for payment of any fees required. Burning of debris is not permitted on the work site.
1.2 REFERENCES
A. Referenced Specifications/Standards with Abbreviations and/or Acronyms: Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/ standards referred to herein may be procured by the Contractor, from the following:
ALSC American Lumber Standards Committee
PO Box 210 Germantown, MD 20875
ANSI American National Standards Institute 11 W 42nd St.
New York, NY 10036
01009 - 2
AWPA American Wood Preservers' Association P.O. Box 286 Woodstock MD 21163
AWPA C 1-95 All Timber Products, Pressure Treatment AWPA C 5-95 Fence Posts, Pressure Treatment AWPA M 4-95 Care of Pressure Treated Wood Products AWPA P 5-95 Waterborne Preservatives AWPA P 8-95 Oil-Borne Preservatives AWPA P 9-92 Solvents for Organic Preservative Systems
CFR Code of Federal Regulations (Available from the
Government Printing Office) N. Capitol St. between G and H St., NW Washington, DC 20402
FS Federal Standard General Services Administration
Specifications Branch Room 6039, GSA Building 7th and D Streets, S.W.
Washington, DC 20407
GSA General Services Administration
F St. and 18th St., NW Washington, DC 20405
OSHA Occupational Safety and Health Administration
US Department of Labor 200 Constitution Ave., NW Washington DC 20210
OSHA 2207-91 Construction Industry
WWPA Western Wood Products Association 522 SW 5th Avenue, Yeon Bldg.
01009 - 3
Portland, OR 97204-2122
1.3 SUBMITTALS
(There are no applicable requirements)
1.4 DELIVERY, STORAGE, AND HANDLING:
(There are no applicable requirements)
1.5 QUALITY ASSURANCE:
A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference with the same force and effect as when they were given in full text.
B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.
1.6 PROJECT/SITE CONDITIONS:
A. Access to the Work:
1. The work locations are shown on the drawings.
2. Access to the work shall be provided by and at the Contractors expense. No roads shall be constructed by the Contractor or off-road driving permitted without prior written permission from the Contracting Officer.
3. Contractor shall exercise care to prevent unnecessary surface disturbance to existing grass, vegetation, and to existing roads and two-tracks.
4. Public, State, or private access roads damaged by the
Contractor shall be restored, at the Contractor’s expense, to the same condition they were in at the commencement of
01009 - 4 work.
B. Environmental Considerations:
1. No blading will be allowed.
1.7 SEQUENCING AND SCHEDULING:
A. Work Schedule: The schedule shall be submitted at the pre-work conference. When requested, the Contractor shall submit an updated schedule within three calendar days. As a minimum, the estimated start and completion dates shall be shown in the schedule.
PART 2: PRODUCTS
(There are no applicable requirements)
PART 3: EXECUTION
3.1 PROJECT MEETINGS:
A. Pre-Work Conference:
1. A pre-work conference will be held prior to the start of work.
The Contractor will be notified in advance of meeting time, date and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.
2. The Contractor, subcontractors and the persons responsible for coordination of the work shall be present at the meeting.
3. The Contractor shall be prepared to summarize and explain procedures planned for the project.
B. Progress Meetings:
01009 - 5
1. Meetings shall be held at the project site, or as determined by the Contracting Officer.
2. Meetings may be called by either the Contracting Officer or the
Contractor. Request shall state who should attend and include an agenda.
C. Final Inspection:
1. Meeting shall be held at the project site, or as determined by the Contracting Officer.
2. The Contractor shall notify the Contracting Officer in writing at least 3 working days before the completion date so the Government can schedule final inspection.
3. The Contractor shall require the superintendent to be present during this inspection.
3.2 PREPARATION
A. Work Limits and Control Points: Will be established by the Contracting Officer.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT:
A. Units: Work described in this section will not be measured for payment.
4.2 BASIS OF PAYMENT:
A. Payment: No direct payment for the work described under this section will be made. The Contractor shall include consideration for
01009 - 6 this item in the bid price for other items of the Contract.
END OF SECTION 01009