This scope of work document outlines specifications for the fabrication and installation of 20 aluminum panel frames for a shuttle kiosk in Sequoia and Kings Canyon National Parks. The frames will hold interpretive panels measuring 35.875 inches wide by 47.875 inches high, with openings along the vertical edges to accommodate installation in a kiosk with limited overhead clearance. The frames must be powdercoated in a dark brown or charcoal color and include hardware to attach to existing horizontal wooden beams. The contractor will submit frame drawings for approval, fabricate the frames off-site to the extent possible, and provide shipping and installation support so the National Park Service can complete assembly and installation using standard tools. All work must follow National Park Service interpretive design standards and be delivered by October 31, 2023, with the contractor providing a one-year warranty on materials and workmanship.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 03_140P8623Q0036_Kiosk_Detail_Drawings.pdf | ||
| 04_140P8623Q0036_National_Park_Service_Wayside_Guide.pdf | ||
| 02_140P8623Q0036_Programmatic_Accessibility_Guidelines.pdf | ||
| 06_140P8623Q0036_52_212-3_Full_Text_.pdf | ||
| 05_140P8623Q0036_Exp_and_PP_Form.pdf | ||
| Sol_140P8623Q0036.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
1. BACKGROUND
Sequoia & Kings Canyon National Parks (SEKI) are in the southern Sierra Nevada in California. They protect groves of giant sequoias and the Kings Canyon as well as historic sites, vast tracts of Sierran foothills and high-Sierra wilderness, and diverse habitats ranging from 1300’ in elevation to 14,494’. The two parks were created separately but are now managed jointly as a single entity.
The work under this contract includes features to meet the requirements of Attachment 03
- Programmatic Accessibility Guidelines for National Park Service Interpretive Media (NPS Access Guide).
2. PURPOSE
The purpose of this contract is to provide for creation of 20 upright wall-mounted wayside frames, each with a space for one high-pressure laminate panels that is 35.875”w x 47.875”h. The frames shall be constructed of aluminum with a powdercoated finish. The exhibits will be exposed to climate extremes, including deep snow cover, full sun, high temperatures, and falling pine needles and small branches, and should be durable and resistant to weathering and vandalism. The panels to be installed in the frames will be provided by the NPS.
The frames will have two changes from traditional NPS wall-mount wayside frames:
• The frames will be installed in a kiosk with limited clearance above the tops of the frames, requiring the opening for the panels to be along the vertical edges, with 10 frames opening along the left side and 10 opening on the right side.
• The frames will be attached to two wooden beams that extend horizontally across the kiosk structure.
3. SCOPE OF WORK
Independently, and not as an agent of the government, the contractor shall provide all services including frame drawings, labor, materials, equipment, shipping or delivery, and installation instructions and support necessary to complete the project. All work performed under this contract shall be fully compatible with NPS interpretive design standards and production methods according to the standards and procedures in this contract, including the Harpers Ferry Center Wayside Guide and Architectural Barriers Act Accessibility Standards.
The park will provide additional specifications on request.
Summary of Specifications for Shuttle Kiosk Panel Frames
1. Frames shall be upright, mounted on existing kiosk horizontal 4” x 8” beams using hidden hardware. Design drawings for the kiosks that show the height and placement of the beams are included in this package as Attachment 03.
2. Each frame will hold one panel, 35.875”w x 47.875”h, with a maximum panel thickness of 0.090”.
3. Frames should be made of aluminum and powdercoated in a color similar to NPS
Dark Brown or GI Charcoal.
4. Openings to change panels should be along the vertical edge instead of the top of the frame, with 15 panels opening along the right frame edge and 15 panels opening along the left frame edge.
5. Hardware to attach the frames to the wooden 4”x8” beams shall be included.
6. Sign panels should be in a comfortable viewing area range between 30” and 80” above ground surface.
7. Frames shall be delivered to this address:
Sequoia and Kings Canyon National Parks Attn: Erika Williams 47050 Generals Hwy Three Rivers, CA 93271
(1) Specifications
All work under this contract shall be performed in accordance with the most recent version of the referenced attachments:
a. Attachment 04, National Park Service Wayside Guide
(2) Exhibit Fabrication Process
a. Review Phase – The contractor shall provide frame drawings to the COR before finalizing the design. Frame drawings must be approved by the COR before production begins.
b. Fabrication Phase - The contractor shall shop-fabricate all exhibit elements to the fullest extent possible prior to shipping. If final assembly must take place on-site and be done by the NPS, it must be possible to complete with standard tools and clear instructions must be provided.
c. Installation Phase - Installation will be performed by NPS personnel. The contractor shall provide shipping of all work under the contract and installation guidelines and support so that the exhibits are complete and ready for Installation.
d. Closeout/Warranty Phase - Upon completion of the installation, the contractor shall provide a one- year warranty for defects in materials and workmanship.
(3) Schedule
a. Frame drawings – The contractor shall provide frame drawings to the COR within one month of contract award date.
b. Delivery of frames – The contractor shall deliver frames no later than October
31, 2023.
| SCOPE OF WORK |
| 2. PURPOSE |
| 3. SCOPE OF WORK |
| a. Review Phase – The contractor shall provide frame drawings to the COR before finalizing the design. Frame drawings must be approved by the COR before production begins. |
| b. Fabrication Phase - The contractor shall shop-fabricate all exhibit elements to the fullest extent possible prior to shipping. If final assembly must take place on-site and be done by the NPS, it must be possible to complete with standard tools and... |
| c. Installation Phase - Installation will be performed by NPS personnel. The contractor shall provide shipping of all work under the contract and installation guidelines and support so that the exhibits are complete and ready for Installation. |
| d. Closeout/Warranty Phase - Upon completion of the installation, the contractor shall provide a one- year warranty for defects in materials and workmanship. |