007_APNDX-B_CD-REPORT_4Jul2020.pdf
PDF 95 KB Posted
- Attached to
- Barracks Restoration Project #9 - Bid Abstract Added Federal contract opportunity
- Solicitation number
- W912L9-20-B-0002
- Issued by
- Department of the Army National Guard
About this file
This solicitation notice is for a firm fixed-price construction contract to renovate two barracks buildings at a military base. The renovation scope includes selective demolition, installation of a new geothermal well system, fire suppression system, and building envelope improvements. The contract value is between $1 million to $5 million, with a performance period of 240 days. The solicitation is set aside exclusively for small businesses with a NAICS code of 236220 and size standard of $39.5 million. Interested contractors must register in SAM and with beta.SAM to access solicitation documents including plans and specifications. The pre-bid conference and site visit dates are in August 2020, with a bid submission deadline of September 9, 2020. The award will be issued by the U.S. Property and Fiscal Office for Indiana.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract Signed Project 9.pdf | ||
| Questions and Answers UPDATED 9-2-2020.pdf | ||
| Solicitation Amendment 3 W912L920B00020003.pdf | ||
| Solicitation Amendment 2 W912L920B00020002.pdf | ||
| Questions and Answers.pdf | ||
| Barracks Statement of Work 05-21-2020 BP-9.pdf | ||
| Phase 2 Addendum No 01 BP9.pdf | ||
| 20200819 SITE VISIT PREPROPOSAL CONFERENCE MEETING MINUTES COMBINED.pdf | ||
| CAMP ATTERBURY BARRACKS AND BOQ RENOVATION -BP9 - 2020.0820.pdf | ||
| Sign In Sheet Site Visit.pdf | ||
| 102113.19 FL - Plastic Toilet Compartments (1).pdf | ||
| AF-66 Submittals_BP9.pdf | ||
| Solicitation Amend W912L920B0002.pdf | ||
| DRAWINGS BP3 20200519.pdf | ||
| Barracks Statement of Work 05-21-2020 BP-3.pdf | ||
| Solicitation W912L9-20-B-0002 PROJECT 9.pdf | ||
| 004_Phase 2_Project Manual Vol 2 of 2_19May20.pdf | ||
| AF-66 Submittals_BP3.pdf | ||
| 003_Phase 2_Project Manual Vol 1of 2_19May20.pdf | ||
| eCMRAMemo.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NAME and NUMBER
PAY APP NUMBER
LOCATION
DATE
DEBRIS
DIVERTED DIVERTED
FROM FROM
QUANTITY TONS LBS YARDS LANDFILL QUANTITY TONS LBS YARDS LANDFILL
(#) () () () (Y or N) (#) () () () (Y or N)
ABC‐Asphalt OD/I/M ‐ Insulation
ABC‐Brick OD/I/M ‐ OTHER (C&D Other)
ABC‐Concrete OD/I/M ‐ Paper
ABC‐OTHER (C&D Masonry/Asphalt) OD/I/M ‐ Plastic
ABC‐Stone OD/I/M ‐ Siding
Land‐Crushed Stone/Base Recycled C&D Debris
Land‐OTHER (C&D Land Clearing) Wood ‐ Finished
Land‐Soil, Lead‐Tainted, Non‐Hazardous Wood ‐ OTHER (C&D Wood)
Land‐Soil, Petroleum‐Tainted Wood ‐ Structural
Land‐Soil, Subsoil Wood ‐ Treated
Land‐Soil, Top
Land‐Vegetation/Timber (Tree Trunks & Limbs)
Metal‐Aluminum
Metal‐Copper
Metal‐Mixed Metal
Metal‐OTHER (C&D Metal) OTHER:
Metal ‐ Steel OTHER:
OD/I/M ‐ Ceiling Tile OTHER:
OD/I/M ‐ Composition Roof OTHER:
OD/I/M ‐ Doors/Windows/Stairs/Cabinets OTHER:
OD/I/M ‐ Glass OTHER:
OD/I/M ‐ Gypsum/Plaster OTHER:
Project Manager
Construction & Demolition Debris Report PROJECT: 2020‐008, Barracks Phase 2 APPENDIX B
File details come from the government source that posted it. Updated .