Project Grant R24AP00206
- The U.S. Bureau of Reclamation awarded a $300,214.26 Project Grant on January 23, 2024 to the El Paso County Water Improvement District No 1 in Texas under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507). The grant funds will be used to line 3,465 linear feet of the earthen Montoya Main Lateral canal with reinforced shotcrete. This upgrade will reduce water loss due to evaporation and seepage, as well as decrease sediment loading in the canal, improving...
- The U.S. Bureau of Reclamation awarded a $5,918,760 Project Grant under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507) to the Hidalgo County Irrigation District No. 2 in Texas. The funding will be used to construct infrastructure and efficiency improvements to a feeder canal, discharge pipes, and a pumping plant. Key project activities include building reinforced isolation bays on the headwall and feeder canal, as well as replacing the pump discharge...
- The United Irrigation District, located in Hidalgo County, Texas, was awarded a $1,700,000 Project Grant from the U.S. Department of the Interior's Bureau of Reclamation under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) federal grant program (CFDA 15.507). The funding will be used to install seven flow control and metering gates and four flow control gates on the Bryan Canal, which provides water to the cities of Mission and McAllen, Texas, and the Sharyland Water...
- The U.S. Fish and Wildlife Service awarded a $1,382,321 Project Grant under the National Fish Passage Program (CFDA 15.685) to the San Antonio River Authority (SARA) to remove or modify the Otilla Dam on the San Antonio River. The primary goal is to restore fish passage and connectivity for aquatic species, including several Texas conservation priority species, that have been cut off by the obsolete dam structure. The project will span 5 years, starting in FY 2025, and includes design,...
- The Texas Fish and Wildlife Conservation Office and ABK State Natural Area will receive $130,000 through a cooperative agreement awarded by the U.S. Department of the Interior Fish and Wildlife Service Region 2 under the Fish and Wildlife Management Assistance program (CFDA 15.608). The funding will support efforts to remove an earthen dam and pond on Bessie's Creek in Boerne, Texas to restore the spring and surrounding areas to a more natural state. Specifically, the dam will be taken out under...
- This Project Grant awarded by the U.S. Department of the Interior Fish and Wildlife Service (CFDA 15.664 - Fish and Wildlife Coordination and Assistance) provides $400,000 to the Siskiyou County Farm Bureau to design and obtain permits for a pipeline that would allow water from the Montague Water Conservation District to be delivered to the Big Springs Irrigation District. This project aims to reduce groundwater and surface water pumping near Big Springs Creek, thereby increasing flows in the...
- The El Paso County Water Improvement District No. 1 received a $4,031,382 Project Grant award from the U.S. Department of the Interior's Bureau of Reclamation under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) program (CFDA 15.507). The grant will fund the lining of 11,000 feet of the Riverside Canal with steel-panel reinforced concrete, which is expected to result in annual water savings of 1,637 acre-feet by reducing seepage losses. This project aims to improve water...
- The U.S. Fish and Wildlife Service awarded a $480,000 Project Grant under the National Fish Passage Program (CFDA 15.685) to the Texas Department of Transportation (TxDOT) to improve a road stream crossing and provide reliable transportation to a community. The project aims to benefit the threatened Devils River Minnow by upgrading the 2804 Pinto Creek Crossing, which is located within 9 miles of critical habitat for this species. The existing crossing has a high gradient and inadequately...
- The U.S. Department of the Interior's Bureau of Reclamation awarded a $5,149,141 WaterSMART (CFDA 15.507) project grant to the Malheur Watershed Council, in partnership with the Vale Oregon Irrigation District, to convert 10.4 miles of open-earthen irrigation canals to plastic irrigation pipe in eastern Oregon. This project is expected to result in annual water savings of 4,888 acre-feet, which will benefit the federally listed bull trout by helping to achieve a carryover pool in Beulah...
- The U.S. Department of the Interior's Bureau of Reclamation awarded a $894,676 Project Grant to the Cameron County Irrigation District #2 in Texas under the WaterSMART (Sustain and Manage America's Resources for Tomorrow) federal grant program (CFDA 15.507). The funding will be used to convert 4,713 linear feet of unlined open canal in a segment of Lateral C-2 to a buried polyvinyl chloride pipeline. This project is expected to result in annual water savings of 280 acre-feet that is currently...
MENARD COUNTY CONTROL AND IMPROVEMENTS DISTRICT #1, IN CENTRAL TEXAS, WILL UPGRADE THE MENARD CANAL IRRIGATION WATER CONVEYANCE SYSTEM TO REDUCE LOSSES SO THAT MORE WATER IS KEPT IN THE SAN SABA RIVER FOR FISH AND WILDLIFE BENEFIT. A WATER LOSS STUDY CONDUCTED BY U.S. GEOLOGICAL SURVEY IN THE SUMMER OF 2014 SHOWED THAT THE 6-MILE LONG CANAL EXPERIENCES AN APPROXIMATELY 50% LOSS OVER THE FIRST 2.5 MILES. THE PROJECT INVOLVES REPLACING THE FIRST 4,000 FEET OF THE UNLINED MENARD CANAL WITH PIPE, AND RE-SLOPING, RE-SHAPING AND PARTIALLY FILLING THE NEXT MILE OF UNLINED CANAL TO CREATE A NARROWER CHANNEL PROFILE. FOLLOWING THAT NARROWED SPAN OF CANAL, THE DISTRICT WILL PIPE AN ADDITIONAL 2,000 FEET OF THE CANAL AND INSTALL GATES TO CONTROL FLOW. THE DISTRICT HAS COMMITTED TO LEAVING THE MAJORITY OF THE CONSERVED WATER, 1,100 ACRE-FEET PER YEAR INSTREAM FOR A 30 YEAR TERM. THE ADDITIONAL INSTREAM FLOWS WILL CONTRIBUTE SIGNIFICANTLY TO BASEFLOW OF THE SAN SABA RIVER AND CREATE A MORE RELIABLE SUPPLY OF WATER FOR DOWNSTREAM AQUATIC HABITAT. SECTIONS OF THE SAN SABA RIVER DOWNSTREAM FROM THE PROJECT THAT WILL BENEFIT FROM THE INCREASED FLOWS INCLUDE CRITICAL HABITAT FOR THE TEXAS FATMUCKET AND TEXAS PIMPLEBACK MUSSEL SPECIES. THE PROJECT IS A RESULT OF CLOSE COLLABORATION BETWEEN THE DISTRICT AND THE NATURE CONSERVANCY WITH COORDINATION AND PARTNERSHIP FROM TEXAS PARKS AND WILDLIFE, U.S. FISH AND WILDLIFE SERVICE, AND TEXAS A M NATURAL RESOURCES INSTITUTE.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $0 | 12/30/25 | ||
| Not listed | $1.9m | 6/4/24 |