Project Grant 693JF72140006

Award Date 8/1/24
Completion Date 9/30/29
Dollars Obligated $3.2M
Federal Grant Program
20.823
Assistance Type
Project Grant
Place of Performance
Augusta, ME 04333, USA
Similar Awards
This federal Project Grant award from the U.S. Department of Transportation's Maritime Administration (MARAD) under the Port Infrastructure Development Program (CFDA 20.823) provides $17,800,000 to the Maine Department of Transportation (MaineDOT) to modernize the refrigerated cargo yard at the Portland International Marine Terminal. The project will construct 12 refrigerated container racks that can store approximately 420 containers, install electrical infrastructure to power the reefer units,...
This $545,112.50 federal Project Grant award from the U.S. Department of Transportation's Federal Highway Administration (CFDA 20.205 - Highway Planning and Construction) provides funding to the Maine Department of Transportation (MaineDOT) for rehabilitation and improvement projects on state-owned ferry terminal assets serving Chebeague, Great Diamond, Cliff Island, and Peak's Island in Casco Bay, Maine. The scope of work includes replacing aging piles, fenders, and cross-bracing, as well as...
This Project Grant award from the U.S. Department of Transportation's Maritime Administration (CFDA 20.823 Port Infrastructure Development Program) provides $141,000,000 to redevelop a vacant industrial facility in Salem, MA into a heavy lift marine terminal. The key products and services to be delivered include: Construction of a 700-foot long wharf and bulkhead capable of handling oversized and heavy cargoes, as well as improvements to 23 acres of adjacent uplands to create a laydown area....
This Project Grant award in the amount of $371,575.00 was provided by the Federal Highway Administration (FHWA) under the Highway Planning and Construction federal grant program (CFDA 20.205) on May 1, 2025. The funding will be used by the Maine Department of Transportation (MaineDOT) to rehabilitate and improve state-owned ferry terminal assets serving Chebeague, Great Diamond, Cliff Island, and Peak's Island in the Casco Bay area. The scope of work includes pile replacement, fender...
The Paducah-McCracken County Riverport Authority received a $3,820,000 Project Grant from the U.S. Department of Transportation Maritime Administration's Port Infrastructure Development Program (CFDA 20.823) on August 18, 2023. The grant funds several related infrastructure improvements at the port, including: Modernizing the port's material handling equipment by replacing three cable mast radial stackers, a 90-foot conveyor and reclaim hopper, and procuring three ground conveyors and one...
This $5,250,000 federal Project Grant award from the U.S. Department of Transportation Maritime Administration under the United States Marine Highway Grants program (CFDA 20.816) will fund equipment and infrastructure improvements for the Port of Harlingen Authority in Texas. The key products and services to be delivered include: Purchase of 10 chassis, spreader bars, a lift truck, yard hostler, and bomb cart to support container handling and terminal operations. Engineering, design,...
This $1,250,000 federal Project Grant award from the U.S. Department of Transportation's Maritime Administration (CFDA 20.823 Port Infrastructure Development Program) is for the planning and design of the revitalization of the North Jetty Berth and the future construction of the South Boston Marine Multiport in the Port of Boston. The key activities include reviewing historic data, conducting non-invasive surveys and investigations, advancing the design to the 30% level, developing cost...
This $556,840 Project Grant, awarded by the Federal Highway Administration (FHWA) under the Highway Planning and Construction program (CFDA 20.205), will fund the rehabilitation and improvement of state-owned ferry infrastructure serving the Chebeague, Great Diamond, Peak's, and Cliff Island communities in Maine. The project scope includes replacing piles, fenders, and cross bracing, as well as conducting concrete repairs and deck replacements at the ferry terminals on these islands. The...
This federal Project Grant award, funded by the U.S. Department of Transportation's Maritime Administration (MARAD) under the Port Infrastructure Development Program (CFDA 20.823), provides $98,536,931.00 to the Port of Houston Authority to develop approximately 50 acres of container yard at the Bayport Container Terminal. Key components of the project include purchasing a 1,000 kVA electrical unit substation, constructing the container yard with utilities, roller compacted concrete and other...
The U.S. Department of Transportation's Maritime Administration (MARAD) awarded a $5,835,370 Port Infrastructure Development Program (CFDA 20.823) grant to Tidewater Barge Lines Inc. The grant will fund the purchase and installation of an electric dock crane at the recipient's terminal in Vancouver, WA, as well as a low-emissions mobile crawler crane at the recipient's terminal in Boardman, OR. The project will also include engineering and permitting for the dock crane installation. The award...

This $3,200,000 Project Grant award, provided by the U.S. Department of Transportation's Maritime Administration (MARAD) under the Port Infrastructure Development Program (CFDA 20.823), funds the renovation of a yard for the storage of refrigerated containers and gate access system modifications and improvements at the International Marine Terminal (IMT) in Augusta, Maine.

The key components of the project include: 1) engineering and construction management for pre-construction design and the construction phase, 2) renovation of the IMT freezer container area through excavation, new pavement installation, catch basin renewal, and fencing/electrical work, and 3) replacement of the IMT's sliding chain link gates with two bi-fold speed gates to provide enhanced access control. The grant also requires the collection and reporting of performance metrics related to freight movements, economic competitiveness, and cargo storage within the project study area over a 3-year period following substantial completion of construction, which is expected by September 30, 2029.