Project Grant 01966
Award Date 1/1/25
Completion Date 12/31/26
Dollars Obligated $23M
Federal Agency
Federal Grant Program
Assistance Type
Project Grant
Place of Performance
Unalaska, AK 99685, USA
Similar Awards
- The Port of Delcambre received a $13.4 million Project Grant award dated July 14, 2025, from the Maritime Administration under the Port Infrastructure Development Program (CFDA 20.823) to restore docking facilities and establish an industrial fabrication facility at the port in Delcambre, Louisiana. The project encompasses comprehensive engineering, design, and construction management services, including preliminary through final engineering, bid document development, and construction...
- The Maritime Administration awarded Tampa Port Authority Inc. a $15.96 million Project Grant under the National Infrastructure Investments program (CFDA 20.933) on December 1, 2025, to construct Berth 301 at the Port Redwing facility in Tampa, Florida. The project will deliver a new approximately 1,025-foot dock connecting Berths 300 and 302, creating a 3,000-linear-foot berthing area capable of simultaneously accommodating three of the largest dry bulk multipurpose cargo vessels navigable...
- The U.S. Department of Transportation's Maritime Administration awarded the City of Hoonah a $15.51 million Project Grant under the Port Infrastructure Development Program (CFDA 20.823) on December 18, 2025, to enhance cargo dock infrastructure in Hoonah, Alaska. The project will construct approximately 330 linear feet of open cell sheet pile bulkhead, install approximately 542 sheet piles, and place 23,220 cubic yards of engineering fill material, armor rock, and concrete. Additional...
- The U.S. Department of Transportation Maritime Administration awarded $2,998,646 to the City of Seldovia, Alaska on April 20, 2026, under the Port Infrastructure Development Program (CFDA 20.823) to replace an existing 3,300-square-foot floating pier serving the remote, rural community. The project will be completed by July 31, 2028, and encompasses three primary components: (1) planning, permitting, and preliminary design work; (2) construction activities including contractor selection, final...
- The Maritime Administration awarded a $10 million Project Grant to the Crescent City Harbor District under the Port Infrastructure Development Program (CFDA 20.823) to rebuild and modernize port infrastructure at Crescent City, California. The award, issued on February 5, 2026, with a completion date of July 28, 2028, funds the construction of a new approximately 13,760 square-foot concrete-decked dock structure engineered to withstand 50-year tsunami events, tidal surges, and other natural...
- JAKOLOF BAY DOCK REPLACEMENT PROJECT The City of Seldovia, Alaska received a $2.997 million Project Grant from the Denali Commission (CFDA 90.100) awarded on May 1, 2025, for the Jakolof Bay Dock Replacement Project. This infrastructure initiative will deliver critical waterfront infrastructure improvements to support the community's maritime access and operations. The project is scheduled for completion by September 30, 2027, and will be performed in Seldovia, Alaska, a rural community where...
- The Maritime Administration awarded $2.82 million to the Chilkoot Indian Association under the National Infrastructure Investments program (CFDA 20.933) on June 26, 2026, to plan and design the reconstruction of the Portage Cove dock in Haines, Alaska. The project, with an expected completion date of April 30, 2029, will refine the conceptual T-shaped dock configuration to accommodate larger vessels and enable year-round use. Key deliverables include preliminary and advanced design and...
- Federal Grant Award Summary The U.S. Department of Transportation's Maritime Administration (MARAD) awarded the Ogdensburg Bridge and Port Authority a $6.6 million Project Grant under the Port Infrastructure Development Program (CFDA 20.823) on March 19, 2026, to expand and modernize the Port of Ogdensburg's main dock terminal. The award funds a comprehensive three-component project scheduled for completion by January 31, 2029, encompassing environmental reviews, permitting, engineering...
- Summary The U.S. Department of Transportation Maritime Administration (MARAD) awarded $29.9 million to the Muskogee City-County Port Authority on March 12, 2026, under the Port Infrastructure Development Program (CFDA 20.823) to fund comprehensive reconstruction and modernization of port facilities at the Port of Muskogee on the McClellan-Kerr Arkansas River Navigation System. The project encompasses four primary construction elements: reconstruction of the main dock at Oakley Terminal,...
- Summary The U.S. Department of Transportation's Maritime Administration awarded $12.5 million to the Puerto Rico Ports Authority on January 8, 2026, under the Port Infrastructure Development Program (CFDA 20.823) for reconstruction and rehabilitation of maritime facilities at Pier 15 in the Port of San Juan. The project encompasses three primary construction elements: rehabilitation of the 1,050-linear-foot Dock B through installation of a new sheet pile wall, anchoring system, fenders,...
DOCK EXPANSION PRE-CONSTRUCTION ACTIVITIES
Posted 7/21/25
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | $700.0k | 7/21/25 |