Formula Grant CT44X00400

Award Date 3/10/15
Completion Date Not listed
Dollars Obligated $54M
Federal Grant Program
20.527
Assistance Type
Formula Grant
Place of Performance
Hartford, CT 06131, USA
Similar Awards
This Project Grant award from the Federal Railroad Administration (FRA), under the Consolidated Rail Infrastructure and Safety Improvements (CRISI) program (CFDA 20.325), provides $460,000.00 to the City of Portsmouth, NH to perform environmental analysis, preliminary engineering, and safety improvements related to replacing a 135-year-old railroad bridge and upgrading four public grade crossings. The key products and services to be delivered include: a new 286k-capable undergrade (UG)...
This federal Project Grant award from the Department of Transportation's Federal Railroad Administration, under the Federal-State Partnership for Intercity Passenger Rail program (CFDA 20.326), provides $149,150,000 to fund the interim repairs necessary to keep the Devon Bridge in Connecticut operational for another 10-15 years until it can be fully replaced. The award supports the National Environmental Policy Act (NEPA) process, preliminary engineering, final design, and construction...
This federal Formula Grant award from the Federal Highway Administration (FHWA) under the Highway Planning and Construction program (CFDA 20.205) provides $1,403,080.00 in funding to the Connecticut Department of Transportation (CTDOT) for the replacement of Bridge #07031 which carries Depot Road over the Norwalk River in Ridgefield, Connecticut. This is a Federal Local Bridge Program (FLBP) state-administered design project. The funding will support the design and construction activities...
This $1,241,639.55 Formula Grant awarded by the Federal Highway Administration (CFDA 20.205 - Highway Planning and Construction) on November 6, 2024 will fund the rehabilitation of a "red list" bridge carrying New Hampshire Route 175 over the Pemigewasset River in Woodstock, New Hampshire. The project, titled "WOODSTOCK NH ROUTE 175 BRIDGE REHAB OF RED LIST BRIDGE CARRYING NH 175 OVER PEMIGEWASSET RIVER (177/148)", will address critical infrastructure needs and improve...
This $3,540,258.58 Formula Grant award from the Federal Highway Administration (FHWA) under the Highway Planning and Construction program (CFDA 20.205) will fund the removal of the superstructure of the existing General Sullivan Bridge in Newington-Dover, New Hampshire. The project, titled "NEWINGTON - DOVER, SPAULDING TURNPIKE / LITTLE BAY BRIDGES", is scheduled to be completed by June 16, 2025. The grant recipient is the New Hampshire Department of Transportation (NHDOT), which...
This $318,226 federal Formula Grant awarded on March 11, 2025 by the Federal Highway Administration (CFDA 20.205 Highway Planning and Construction) will fund the construction of a pedestrian bridge over the CSX railroad tracks in Kingsport, Tennessee. The bridge will connect downtown Kingsport to the Brickyard Park development, providing a safer route between these areas by eliminating the current at-grade railroad crossing. This project is part of the Federal Highway Administration's broader...
This $500,000 Project Grant award from the U.S. Department of Transportation's Federal Railroad Administration (CFDA 20.327 - Railroad Crossing Elimination) will fund the planning, environmental planning, and design process for closing an existing at-grade rail crossing located near the intersection of U.S. 5 and Toelles Road in Wallingford, CT. The project will study the feasibility of eliminating the grade crossing by constructing a new roadway bridge to carry Toelles Road over the rail...
This $476,697 Formula Grant awarded on December 20, 2024 by the Federal Highway Administration (CFDA 20.205 - Highway Planning and Construction) will fund the replacement of the Bridge Street (SR 125) bridge over the Merrimack River and the Bradford Rail Trail in Haverhill, Massachusetts. The project, titled "Haverhill - Bridge Replacement, H-12-007, Bridge Street (SR 125) over the Merrimack River and the Bradford Rail Trail", will involve constructing a new bridge structure to improve...
The New Hampshire Department of Transportation received a $5.2 million Formula Grant award from the Department of Transportation Federal Highway Administration on September 20, 2022. The funding will support the Highway Planning and Construction program to acquire approximately 9.6 miles of railroad corridor between Hampton and Portsmouth, New Hampshire, and improve the existing corridor surface for bicycle and pedestrian use. As part of the broader Federal-aid Highway Program, this project aims...
This $58,131,786.50 federal Formula Grant award from the U.S. Department of Transportation's Federal Highway Administration (CFDA 20.205 - Highway Planning and Construction) supports the replacement of the Bridge Street (SR 125) bridge over the Merrimack River and the Bradford Rail Trail in Haverhill, Massachusetts. The project, titled "Haverhill - Bridge Replacement, H-12-007, Bridge Street (SR 125) over the Merrimack River and the Bradford Rail Trail", will involve the construction...

WALK BRIDGE DESIGN & NH RAILYARD PO

Posted 3/10/15, 12:00 AM