The U.S. Environmental Protection Agency (EPA) has provided a $1,199,690 Cooperative Agreement award under the Congressionally Mandated Projects program (CFDA 66.202) to the City of Cleveland, Ohio. This funding will support a project to replace approximately 1,200 linear feet of sewer pipe on East 115th Street, including the replacement of the main sewer pipe, manholes, catch basin connections, sewer connections, and roadway pavement restoration. The expected outcomes of this project include an...
The U.S. Environmental Protection Agency (EPA) awarded a $2,670,449 Cooperative Agreement (CFDA 66.202 - Congressionally Mandated Projects) to the Northeast Ohio Regional Sewer District on October 24, 2024. The funding will support the implementation of a project to separate the existing combined sewer overflow system in Garfield Heights, Ohio, as directed in the 2023 Consolidated Appropriations Act. The key activities to be performed include conveyance system improvements, stormwater...
This Cooperative Agreement award from the U.S. Environmental Protection Agency (EPA) under the Congressionally Mandated Projects program (CFDA 66.202) provides $1,250,000 in funding to the City of Garfield Heights, Ohio to implement a wastewater and stormwater infrastructure improvement project. The key activities include constructing a new storm sewer and converting the existing combined sewer to a sanitary sewer system in the MLK Boulevard area. The expected deliverables are the completion...
This $3,150,002 Cooperative Agreement, awarded by the U.S. Environmental Protection Agency (EPA) under the Congressionally Mandated Projects program (CFDA 66.202), provides funding to the City of Rocky River, Ohio to implement a project to replace sewer lines along Buckingham Road, Argyle Oval, and Arundel Road. The key activities to be performed include removal and replacement of existing water main, storm sewer, sanitary sewer, and associated infrastructure, as well as pavement, driveway...
This Cooperative Agreement award from the U.S. Environmental Protection Agency (EPA) under the Congressionally Mandated Projects program (CFDA 66.202) provides $1,059,407.00 in funding to the Lake County Board of Commissioners to implement Phase 2 of the Old Town Sanitary Sewer Improvement Project. The project activities include the purchase of materials and equipment rentals to install 5,785 linear feet of 8-inch PVC SDR26 sanitary sewer, 21 sanitary sewer manholes, and 98 6-inch service...
This $4,375,000 Cooperative Agreement awarded by the U.S. Environmental Protection Agency (EPA) Region 5 under the Congressionally Mandated Projects program (CFDA 66.202) provides funding to the Village of Chagrin Falls, Ohio to implement a wastewater treatment plant infrastructure rehabilitation project. The project involves replacing aged headworks infrastructure including influent pumping, screening and grit removal systems. It also includes upgrading unit processes such as changing the...
This federal Cooperative Agreement award, with a total funding amount of $2,532,832.00, was granted by the U.S. Environmental Protection Agency (EPA) under the Congressionally Mandated Projects program (CFDA 66.202). The award provides funding to Lucas County, Ohio to implement a project to design and install a functional sanitary sewer system within the unsewered areas of Curtice-Williston. Key activities include planning, design, and construction costs for the sewer installation project,...
The U.S. Environmental Protection Agency (EPA) awarded a $1,000,000 Cooperative Agreement under the Congressionally Mandated Projects program (CFDA 66.202) to the Belmont County Sanitary Sewer District in Ohio. The award funds infrastructure improvements to the county's sanitary sewer system, including the construction of approximately 6,820 linear feet of 12-inch PVC gravity force main and the refurbishment of 25 existing manholes. These upgrades are expected to increase sewage capacity and...
This Cooperative Agreement award, funded by the U.S. Environmental Protection Agency (EPA) under the Congressionally Mandated Projects program (CFDA 66.202), provides $2,500,000 to the Northeast Ohio Regional Sewer District to implement a stormwater management project. The key activities involve the execution and implementation of a stormwater infrastructure construction project, including the development of a new regional stormwater management basin. The anticipated deliverable is the...
The City of Parma was awarded a $2,460,000 Cooperative Agreement from the U.S. Environmental Protection Agency (EPA) under the Congressionally Mandated Projects program (CFDA 66.202) to implement a project to install approximately 2,300 linear feet of 8-inch diameter sanitary sewer main and 680 linear feet of 6-inch diameter sanitary service laterals at 4 separate project sites within the city. The project also includes the installation of 16 sanitary sewer manholes, sewer trench backfilling,...

The U.S. Environmental Protection Agency (EPA) awarded a $2,000,000 Cooperative Agreement to the City of Shaker Heights, Ohio under the Congressionally Mandated Projects program (CFDA 66.202) on April 1, 2024. The funding supports the city's project to mitigate sanitary sewer overflow through capacity improvements along Lynnfield Road, Lomond Boulevard, Sherrington Road, and Palmerston Road. Key project components include:

  • Eliminating an existing overflow connection and installing 1,377 feet of 18-inch replacement sewer on Lynnfield Road.
  • Installing 747 feet of 30-inch parallel relief sewer, three cross-connections, and 701 feet of cured in-place pipe (CIPP) sewer lining along Lomond Boulevard.
  • Installing 458 feet of 30-inch parallel relief sewer and 1,196 feet of 36-inch replacement sewer, including water main replacement, along Sherrington Road.
  • Replacing 191 feet of 36-inch sewer along Palmerston Road.

The anticipated deliverables are the replacement and installation of these sewer lines, which are expected to improve the sanitary sewer overflow issue for the City of Shaker Heights. The project is scheduled for completion by December 1, 2025.