Purchase Order W912EF09V7002
Award Date 5/18/09
Potential Completion Date 5/18/09
Potential Value $2.8K
Federal Agency
Ultimate Awardee
Not listed NAICS Category
PSC Category
Federal Contract Vehicle
- Not listed
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Pomeroy, WA 99347, USA
Solicitation Procedures
Negotiated Proposal / Quote
Number Of Offers Received
Not listed
Legislative Mandate
Not listed National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- The U.S. Army Corps of Engineers awarded a $24,632.14 firm fixed-price purchase order to Structural Hardware And Supply, Inc., a small business manufacturer, to deliver a minimum of 500 tons of construction materials such as gravel and aggregate to a federal site in Tacoma, Washington. This contract is a small business set-aside and supports infrastructure projects across military bases, national parks, wildlife refuges, and other federal sites. Structural Hardware And Supply, Inc. has a history...
- <p>This is a firm fixed-price purchase order awarded by the U.S. Army Corps of Engineers (USACE) to Specialty Excavating, LLC, a small business, for $150,153.50. The contract is for the emergency restoration of levees in North Idaho/Colville, with an ultimate completion date of April 14, 2017. The contract was set aside for total small business participation.</p>
- This is a firm fixed-price purchase order contract awarded by the U.S. Army Corps of Engineers (USACE) to Civil Built LLC, a small, self-certified disadvantaged business, for the fabrication and delivery of gate and gantry frame weldments. The $235,639.94 contract supports the USACE's fish ladder turn pool gate replacement project in Pomeroy, Washington. The contract has no set-aside designation and requires the delivery of 304/304L stainless steel gate and gantry frame assemblies, including...
- This is a firm fixed-price purchase order awarded by the U.S. Army Corps of Engineers, Walla Walla District, to Atlas Sand & Rock, Inc., a small business manufacturer, for the delivery of bags of concrete. The $1,010.00 contract has a period of performance through July 22, 2009. This award appears to be part of the Corps of Engineers' recovery and construction efforts, as indicated by the "TAS RECOVERY--BAGS OF CONCRETE" description. The contract was set aside for small...
- This is a firm fixed-price purchase order contract awarded by the U.S. Army Corps of Engineers (USACE) to Gulf Construction & Supply LLC, a Service-Disabled Veteran-Owned Small Business (SDVOSB). The contract, valued at $625,063.20, is for the Mississippi River Levees Surfacing Material project, identified as TAS Recovery Project #011440, RP# B4R0000. The contract has an ultimate completion date of October 30, 2009. This purchase order contract is not part of a larger contract vehicle.
- The Department of the Army Corps of Engineers awarded a $21,705.75 firm fixed price blanket purchase agreement (BPA) call contract to B & P Consort, Inc. of Ahsahka, Idaho for fencing materials. The contract is set aside for total small businesses and requires completion of the fencing material delivery by September 30, 2022. As a provider of construction materials for Army Corps projects, B & P Consort will supply the fencing products to support the agency's infrastructure development...
- <p>This is a $19,797.94 firm fixed-price purchase order awarded to Border Construction Specialties, LLC, a small business, by the U.S. Army Corps of Engineers for the replacement of rip rap to control erosion around a water control tower bridge pier at Black Butte Lake in California. The work is necessary for dam safety maintenance. This contract award is associated with the Army Corps of Engineers' RECOVERY project program.</p>
- This is a firm fixed-price delivery order awarded by the U.S. Army Corps of Engineers (USACE) to Northbank Civil and Marine, Inc., a small business contractor, for barge moorage wharf improvements. The award is valued at $485,641.00 and falls under the USACE Walla Walla Construction Multiple Award Task Order Contract (MATOC) 2016-2021, a larger indefinite delivery/indefinite quantity (IDIQ) contract vehicle. The work is to be performed in Pomeroy, Washington, and the ultimate completion date...
- <p>This is a firm fixed-price purchase order awarded by the U.S. Army Corps of Engineers, Walla Walla District (ENDIST Walla Walla), to Waite Specialty Machine Work, Inc., a small business contractor, for the procurement of Lucky Peak Dam intake gate roller chain assemblies in Boise, Idaho. The contract has a ceiling value of $167,700.00 and a completion date of April 21, 2016. The contract is set aside for total small business participation.</p>
- This is a $516,605.58 firm-fixed-price purchase order contract awarded by the U.S. Army Corps of Engineers (USACE) to Renewable Resources & Management, LLC, a certified HUBZone small business. The contract is for the recovery, repair, and installation of gate seals as well as the fabrication of a temporary frame and painting of gates for the TAS (Task Accounting Symbol) Recovery Repair project. The contract has a completion date of September 30, 2010 and was awarded on September 22, 2009. As...
This is a firm fixed-price purchase order contract awarded by the U.S. Army Corps of Engineers (USACE) to Gateway Materials, Inc., a small business located in Lewiston, Idaho. The contract, valued at $2,757.57, is for the provision of various construction materials and equipment to support the Army Corps' operations, including TAS twisters, loopties, plastic chairs, rebar, wood stakes, string line, aluminum pipe, level, spud wrench, and safety fencing. The contract is not associated with a larger vehicle and does not have a set-aside designation. The award was made under the American Recovery and Reinvestment Act (ARRA) and is intended to support the Corps' operations in the Walla Walla region of Washington.
Generated 4/2/25, 9:54 AM
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $2.8k | 5/18/09 |