Purchase Order W911PT24P0142

Award Date 8/15/24
Potential Completion Date 10/17/25
Potential Value $1.1M
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
No Set-Aside Used
Extent Competed
Competed under SAP
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Montpelier, VT 05602, USA
Solicitation Procedures
Simplified Acquisition
Number Of Offers Received
4
Legislative Mandate
Not listed
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This is a definitive contract awarded by the Department of the Army Materiel Command TACOM Life Cycle Management Command to Burlington Engineering Corporation, a for-profit manufacturer of goods. The $1,092,000.00 firm fixed price contract is for the delivery of surface grinding equipment and related tooling to the Watervliet Arsenal in New York. The equipment provided under this award likely supports manufacturing and production operations at the Army facility. The contract has no set-aside...
The Department of the Army Materiel Command Research Development and Engineering Command awarded a $617,000 firm fixed price contract to Burlington Engineering Corporation for the delivery of one 48-inch vertical rotary surface grinder. The contract is in response to a solicitation from the Department of the Army Materiel Command Contracting Command Detroit Arsenal seeking a grinder per Watervliet Arsenal Manufacturing Engineering Work Group Specification 01-21-3415. The grinder must meet over...
This contract award, identified as W911PT20C0004, was made by the U.S. Army TACOM Life Cycle Management Command (TACOM) to Burlington Engineering Corporation, a for-profit manufacturer of specialized precision metalworking equipment and tooling based in Montpelier, Vermont. The $2,848,940.00 firm-fixed-price contract is for the delivery of an external cylindrical grinder to the Watervliet Arsenal in New York. This contract does not utilize any set-aside designation. Burlington Engineering...
Burlington Engineering Corporation, doing business as Burlington Engineering Corp., has been awarded a $2.2 million firm fixed-price contract by the Department of the Army Materiel Command for the delivery of an external cylindrical grinder to Watervliet Arsenal. The grinder must meet specification number 12-22-3415 for a center to center grinding capability of seven meters and wheel-head cross-slide travel of fifteen inches, with all motions and wheel truing cycles controlled numerically. There...
The Department of the Army Materiel Command TACOM Life Cycle Management Command awarded a $3,583,411.25 Firm Fixed Price definitive contract to Burlington Engineering Corporation, doing business as Burlington Engineering Corp., for the delivery of an Inside Diameter (I.D.) Grinder. The machine is required to grind the interior of 4340 alloy steel cannon tubes up to 13.5 inches in diameter and 40 feet in length for Watervliet Arsenal. The contract has no set-aside designation. Burlington...
The Department of the Army Materiel Command Life Cycle Management Command awarded a $2.1 million firm-fixed-price definitive contract to Burlington Engineering Corporation for an external cylindrical grinder to be delivered to and installed at the Watervliet Arsenal in Watervliet, New York. The solicitation sought proposals for a programmable, horizontal, traveling head cylindrical grinder with a center to center grinding capability of 7 meters and minimum wheelhead cross slide travel of 15...
The U.S. Army Contracting Command - Watervliet Arsenal (ACC-WVA) awarded a $147,000.00 firm-fixed price purchase order to Burlington Engineering Corporation, doing business as Burlington Engineering Corp, for the delivery of one new rotary grinder. This award is not associated with a larger contract vehicle and does not have a set-aside designation. The rotary grinder must meet specific technical requirements outlined in the original market survey, including a 2-axis automatic horizontal...
Burlington Engineering Corporation was awarded a definitive contract by the Department of the Army's Tank-Automotive and Armaments Command Life Cycle Management Command to procure one new six-axis computer numerical control broach grinding machine for Watervliet Arsenal in New York. Valued at $1,187,574, this firm fixed price contract has a period of performance through July 2023 to deliver the specialized precision metalworking equipment requested in the original solicitation. No set-aside...
This is a $2,330,700 firm-fixed-price definitive contract awarded by the U.S. Army TACOM Life Cycle Management Command (TACOM) to Burlington Engineering Corporation, a for-profit manufacturer of specialized precision metalworking equipment and tooling based in Montpelier, Vermont. The contract is for the procurement of a "CREEP FEED GRINDING MACHINE" and does not have a set-aside designation. Burlington Engineering Corporation has been actively receiving federal contract awards since...
The U.S. Army TACOM Life Cycle Management Command awarded a $315,440.00 firm fixed-price purchase order to Burlington Engineering Corporation, doing business as Burlington Engineering Corp, for the procurement of 1 EACH - ROTARY GRINDER PER WVA SPEC 12-24-3415. This contract was awarded under a Total Small Business set-aside, indicating that only small businesses were eligible to compete. Burlington Engineering Corp is a for-profit manufacturer of specialized precision metalworking equipment and...

This federal contract award, valued at $1,135,250.00, was granted by the U.S. Army TACOM Life Cycle Management Command to Burlington Engineering Corporation, doing business as Burlington Engineering Corp, for the delivery of one large surface grinder per specification #15-23-34. The contract has a firm fixed price pricing type and an ultimate completion date of October 17, 2025.

The original solicitation was a market survey conducted by the U.S. Army Contracting Command - Watervliet Arsenal to identify potential manufacturers for the large surface grinder, which will be used at the Watervliet Arsenal in New York to manufacture cannon components. The grinder must be capable of machining hardened steel alloys to precise tolerances. There was no set-aside designation used for this contract award.

Generated 11/14/24, 9:28 AM