Purchase Order FA822722P0012
Award Date 1/18/22
Potential Completion Date 1/17/23
Potential Value $460K
Funding Federal Agency
Contracting Federal Agency
Ultimate Awardee
Not listed PSC Category
Set-Aside Type
No Set-Aside Used
Federal Contract Vehicle
- Not listed
Extent Competed
Competed under SAP
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
West Haven, UT 84401, USA
Solicitation Procedures
Simplified Acquisition
Number Of Offers Received
5
Legislative Mandate
Not listed National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- The Department of the Air Force, acting through the Ogden Air Logistics Complex, awarded a purchase order to Energy Management Corp for $141,169.92 on March 31, 2017 for maintenance and repairs of emergency generators, controls, and supporting equipment in Building 238 at Hill Air Force Base, Utah. The order is firm fixed price and carries no set-aside designation. Work is performed at Hill AFB, Utah, with ultimate completion scheduled for April 2, 2022. The effort supports the 309th Maintenance...
- <p>Air Force Materiel Command issued a delivery order to Eaton Corporation on September 28, 2023, for a power conditioning and continuation interfacing equipment design survey at Hill Air Force Base, Building 100, UT, with a ceiling value of $5,000.</p> <p>The order is issued under the PCCIE MAC III vehicle. Place of performance is Hill AFB, UT 84056. The ultimate completion date is September 27, 2024. Pricing is firm fixed price with no set-aside.</p>
- This firm-fixed-price delivery order, awarded by the Air Force Sustainment Center, provides for the repair of the second floor of Building 847 at Hill Air Force Base. The contract was awarded on August 20, 2018, with a ceiling value of $2,942,669.60 and a completion date of September 30, 2020. It was issued under the Hill Air Force Base Multiple Award Construction Contract (MACC) 2016-2021. The prime contractor is E Corp, a for-profit Subchapter S corporation located in Layton, Utah, with...
- <p>The Air Force Materiel Command issued a $5,000 delivery order to Eaton Corporation on March 4, 2024, under the PCCIE MAC III vehicle for power conditioning and continuation interfacing equipment design survey at Hill Air Force Base, UT, Buildings 100 and 928.</p> <p>Place of performance is Hill Air Force Base, UT. The order carries a firm fixed price and an ultimate completion date of March 3, 2025. No set-aside was used.</p>
- This contract was awarded by the Department of the Air Force Materiel Command to Eaton Corporation for the purchase and installation of an uninterruptible power supply (UPS) system at Hill Air Force Base in Utah. The contract has a firm-fixed price of $459,092.83 and a completion date of November 11, 2021. It is a delivery order under the Power Conditioning Continuation and Interface Equipment II (PCCIE) multiple award contract vehicle, which Eaton holds with the Department of the Air Force to...
- <p>The Department of the Air Force Materiel Command, contracting through the Ogden Air Logistics Complex, awarded a $2.568 million definitive contract to Tope Technology, LLC on February 25, 2019, for engineering and program management support to the 309th Electronic Maintenance Group at Hill Air Force Base, Utah, under an 8(a) sole-source set-aside.</p> <p>The contract is firm fixed price with an ultimate completion date of February 24, 2024. Place of performance is Hill AFB, UT 84056.</p>
- Air Force Materiel Command issued a delivery order to Eaton Corporation on March 25, 2024, for an uninterruptible power supply package at Hill Air Force Base, UT, with a ceiling value of $129,999.99. The order is issued under the PCCIE MAC III vehicle, a multiple-award contract for power conditioning and continuation interfacing equipment across Air Force installations. Place of performance is Hill AFB, UT Building 100. The ultimate completion date is March 24, 2025. Pricing is firm fixed...
- Air Combat Command awarded a $457.5 million definitive contract to City Light & Power, Inc. for privatization of the electrical distribution system at Hill Air Force Base, Utah, on June 12, 2014, under fixed-price contracting with economic price adjustment provisions and no set-aside. Place of performance is Hill AFB, UT. The contract covers design, construction, and operation of power distribution infrastructure to modernize and enhance grid resilience at the installation. The ultimate...
- <p>Air Force Materiel Command issued a delivery order to Eaton Corporation on April 6, 2022, for an uninterruptible power supply system at Hill Air Force Base, Utah, with a ceiling value of $165,180.15 under the PCCIE MAC III vehicle.</p> <p>Place of performance is Hill AFB, UT 84056. The order is priced firm fixed price with an ultimate completion date of October 5, 2023. No set-aside applies to this order.</p>
- This delivery order for $38,396.40 was awarded by the Department of the Air Force Materiel Command Ogden Air Logistics Complex to Potomac Electric Corp. to repair 17 different assets managed by the 415th Supply Chain Management Squadron at Hill Air Force Base in Utah. Work will be performed in Boston, Massachusetts by April 9, 2021. No set-aside designation was applied to this firm fixed price contract to maintain various equipment for the 415th SCMS at Hill AFB, in support of the Ogden Air...
The purpose of the $460,389 Electrical Preventative Maintenance (EPM), Phase 2 effort is for Creative Times Dayschool, LLC doing business as CTI Construction to provide services to achieve National Fire Protection Association (NFPA) 70B and NFPA 70E compliance for Building 505 located on Hill Air Force Base (AFB), Utah. Funding is provided by the Department of the Air Force Materiel Command Ogden Air Logistics Complex. The firm fixed price contract runs from January 18, 2022 to January 17, 2023 and performance will take place in West Haven, Utah.
Generated 11/27/23, 5:48 PM
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00001 | Other Administrative Action | $0 | 6/14/22 | |
| Not listed | Not listed | $460.4k | 1/18/22 |