2 - THE PURPOSE OF THIS MODIFICATION #1 IS TO: 1)PURCHASE & INSTALLATION OF SUBMERSIBLE PUMP 2). PURCHASE & INSTALLATION OF SYNTHETIC MATERIAL FOR THE FLOORING OF THE CLUB HOUSE/CHALET 3). THE EXTENSION OF THE COVERING OVER THE GENERATOR AND DIESEL TANK. 4) INSTALLATION OF 4NOS ADDITIONAL AIR-CONDITIONERS UNITS. 5) PROCUREMENT AND INSTALLATION OF GYM EQUIPMENT. 6) PROCUREMENT AND INSTALLATION OF ROLLING BLINDS. Funding Only Action ($2k) 9/17/17 1 - THE PURPOSE OF THIS MODIFICATION #1 IS TO: 1)PURCHASE & INSTALLATION OF SUBMERSIBLE PUMP 2). PURCHASE & INSTALLATION OF SYNTHETIC MATERIAL FOR THE FLOORING OF THE CLUB HOUSE/CHALET 3). THE EXTENSION OF THE COVERING OVER THE GENERATOR AND DIESEL TANK. 4) INSTALLATION OF 4NOS ADDITIONAL AIR-CONDITIONERS UNITS. 5) PROCUREMENT AND INSTALLATION OF GYM EQUIPMENT. 6) PROCUREMENT AND INSTALLATION OF ROLLING BLINDS. Additional Work (new agreement, FAR part 6 applies) $23.2k 5/5/16 Not listed - PROCUREMENT OF A CONTRACTOR TO CARRY OUT COMPREHENSIVE MAKE READY WORK AT USAID NIGERIA GUEST HOUSE. SEE SCOPE OF WORK BELOW. STATEMENT OF WORK - INTERIOR MAKE READY FOR USAID GROUP HOUSING GENERAL INFORMATION THE UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMENT, ABUJA NIGERIA REQUESTS THE SERVICE OF A QUALIFIED CONTRACTOR TO CARRY OUT INTERIOR MAKE READY WORKS AT THE USAID GROUP HOUSING. GENERAL REQUIREMENT: THE CONTRACTOR WILL BE RESPONSIBLE FOR LABOR AND MATERIALS REQUIRED TO CARRY OUT NECESSARY WORK, UNLESS STATED OTHERWISE. THE CONTRACTOR IS TO PREPARE AND SUBMIT QUOTE FORMULATED FROM THE SCOPE OF WORK AND FROM THE WALKTHROUGH WITH ANY AND ALL MEASUREMENTS TAKEN DURING SITE VISITS. THE CONTRACTOR MUST PROVIDE A WORK SCHEDULE AS PART OF THE SUBMISSION REQUIREMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND APPROVALS FROM ALL RELEVANT AUTHORITIES. THE CONTRACTOR IS RESPONSIBLE FOR REPAIR/COST OF REPAIR OF ANY DAMAGE TO EXISTING BUILDING INTERIOR OR EXTERIOR IMPROVEMENTS OR ABOVEGROUND/UNDERGROUND UTILITIES/STRUCTURES. THE CONTRACTOR MUST ABIDE BY ALL NECESSARY SAFETY REQUIREMENTS AND STANDARDS DURING THE WORKS. THE U.S GOVERNMENT IS NOT LIABLE FOR INJURIES OR PROVISION OF REQUIRED SAFETY EQUIPMENT. THE CONTRACTOR MUST ENSURE THAT ALL MATERIALS TO BE USED ARE IN CONFORMANCE WITH THE MATERIALS PRESENTED IN THE SUBMITTAL AND THE APPROVED BILL OF QUANTITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INFORMING THE CONTRACTING OFFICER/AUTHORIZED REPRESENTATIVE TO INSPECT THE MATERIALS AND GIVE APPROVAL. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF ALL DEBRIS ARISING FROM THE CONSTRUCTION AND KEEPING THE WORK AREA CLEAN AND CLEAR OF ALL OBSTRUCTIONS ON A DAILY BASIS. FINAL CLEANING OF THE UNIT TO REMOVE ALL DUST, DEBRIS AND WASTE IS REQUIRED AT THE END OF THE PROJECT. ESTIMATED DURATION OF ALL WORKS MUST NOT EXCEED 45 DAYS FROM CONTRACT AWARD. REPAIRS OR OTHER CORRECTIVE ACTION IDENTIFIED BY THE CONTRACTING OFFICERS REPRESENTATIVE (COR) AND BROUGHT TO THE ATTENTION OF THE CONTRACTOR ARE TO BE COMPLETED BY THE CONTRACTOR DURING THIS WARRANTY PERIOD, EITHER DUE TO IMPROPER OR INADEQUATE INSTALLATION, AND/OR FAULTY WORKMANSHIP. ACCIDENT PREVENTION: (A) GENERAL. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN WORK ENVIRONMENTS AND PROCEDURES WHICH WILL SAFEGUARD THE PUBLIC AND GOVERNMENT PERSONNEL, PROPERTY, MATERIALS, SUPPLIES, AND EQUIPMENT EXPOSED TO CONTRACTOR OPERATIONS AND ACTIVITIES; AVOID INTERRUPTIONS OF GOVERNMENT OPERATIONS AND DELAYS IN PROJECT COMPLETION DATES; AND, CONTROL COSTS IN THE PERFORMANCE OF THIS CONTRACT. FOR THESE PURPOSES, THE CONTRACTOR SHALL: (1) PROVIDE APPROPRIATE SAFETY BARRICADES, SIGNS AND SIGNAL LIGHTS; (2) COMPLY WITH THE STANDARDS ISSUED BY ANY LOCAL GOVERNMENT AUTHORITY HAVING JURISDICTION OVER OCCUPATIONAL HEALTH AND SAFETY ISSUES; AND, (3) ENSURE THAT ANY ADDITIONAL MEASURES THE COR DETERMINES TO BE REASONABLY NECESSARY FOR THIS PURPOSE ARE TAKEN. (4) THE COR SHALL SPECIFY IN WRITING ADDITIONAL REQUIREMENTS REGARDING SAFETY, IF THE WORK INVOLVES: (I) WORK AT HEIGHTS ABOVE TWO (2) METERS; (II) TEMPORARY WIRING, USE OF PORTABLE ELECTRIC TOOLS, OR OTHER RECOGNIZED ELECTRICAL HAZARDS. TEMPORARY WIRING AND PORTABLE ELECTRIC TOOLS REQUIRE THE USE OF A GROUND FAULT CIRCUIT INTERRUPTER (GFCI) DEVICES IN THE AFFECTED CIRCUITS; OTHER ELECTRICAL HAZARDS MAY ALSO REQUIRE THE USE OF A GFCI; CE; CERTIFIED EXTENSION CORDS TO BE USED, NO HOMEMADE ELECTRICAL CORDS. (III) HAZARDOUS MATERIALS - A MATERIAL WITH A PHYSICAL OR HEALTH HAZARD INCLUDING BUT NOT LIMITED TO, FLAMMABLE, EXPLOSIVE, CORROSIVE, TOXIC, REACTIVE OR UNSTABLE, OR ANY OPERATIONS WHICH CREATES ANY KIND OF CONTAMINATION INSIDE AN OCCUPIED BUILDING SUCH AS DUST FROM DEMOLITION ACTIVITIES, PAINTS, SOLVENTS, ETC.; OR (IV) HAZARDOUS NOISE LEVELS. (B) RECORDS. THE CONTRACTOR SHALL MAINTAIN AN ACCURATE RECORD OF Not listed $54.1k 2/23/16