Purchase Order 6923G520P0095
- Not listed
- The Department of Transportation Saint Lawrence Seaway Development Corporation awarded a $17,217.93 firm fixed price purchase order to Re:build Optimation Technology, LLC of Massena, New York for module replacement assessment services. The award, which has no set-aside designation and must be completed by December 31, 2023, will support the agency's efforts to assess and replace modules along the Saint Lawrence Seaway to ensure continued safe and reliable operations. Re:build Optimation...
- The Department of Transportation's Saint Lawrence Seaway Development Corporation (SLSDC) awarded a $234,050 firm-fixed-price purchase order to Cavotec USA Inc., a for-profit organization, to provide hands-free mooring (HFM) system service and maintenance for the Eisenhower and Snell locks along the Great Lakes St. Lawrence Seaway. This 5-year contract, which does not have a set-aside designation, supports the SLSDC's mission to facilitate the safe and efficient passage of commercial vessels...
- This is a definitive contract awarded by the Saint Lawrence Seaway Development Corporation, a civilian agency, to Quality Control Services LLC, a minority-owned small disadvantaged business, for $269,761.03. The contract is for inspection and testing services related to the Hands Free Mooring Slot Installation Project at Eisenhower Lock. The contract is a Time and Materials contract with an ultimate completion date of April 30, 2017. The award was a sole source contract under the 8(a) set...
- This $269,820.52 delivery order was awarded to WSP USA Inc. by the Department of Transportation's Saint Lawrence Seaway Development Corporation (DOT SLSDC). The contract is for hydrographic surveying and technical services to support dredging at a Marine Base and the Eisenhower Lock spare gate areas. This work is being performed under the DOT SLSDC's Architect and Engineering Services IDIQ contract, which has a total potential value of $500 million and runs from September 2021 through...
- <p>The Department of Transportation's Saint Lawrence Seaway Development Corporation awarded a $275,490.00 Firm Fixed Price Definitive Contract to Continental Construction LLC, a for-profit small business, to replace old and install new steel grating covers at the Eisenhower Snell Lock. The contract has a completion date of December 20, 2019 and was awarded on July 31, 2019. This contract award is part of the agency's work to maintain and improve infrastructure along the St. Lawrence Seaway.</p>
- <p>This is a $293,026.31 definitive time-and-materials contract awarded by the Saint Lawrence Seaway Development Corporation, a civilian agency, to Quality Control Services LLC, an 8(a) certified small disadvantaged business. The contract is for construction inspection and testing services to install hand-free mooring slots in the north wall of the Eisenhower Lock. The contract has an ultimate completion date of September 21, 2016.</p>
- The Department of Transportation Saint Lawrence Seaway Development Corporation awarded a $4,657.50 firm fixed price call against a blanket purchase agreement to Hunt Underwater Specialties, LLC for diving services at Eisenhower Lock in Massena, New York. The contract has a total small business set aside designation and is to be completed by April 20, 2021. As the operator of the Saint Lawrence Seaway, the agency relies on contractors like Hunt Underwater Specialties to perform essential...
- The Department of Transportation Saint Lawrence Seaway Development Corporation awarded a Definitive Contract to Shotcrete Montana LLC, a Self Certified Small Disadvantaged Business, for Firm Fixed Price services to rehabilitate concrete surfaces for the culvert valve recesses at Eisenhower Lock in Massena, New York. The contract has a potential value of $233,759.49 and a completion date of March 4, 2019. This contract award replaces a previous award due to an error encountered in the Oracle...
- This is a definitive contract awarded by the Department of Transportation's Saint Lawrence Seaway Development Corporation to Dow Electric, Inc., a small business prime contractor. The $580,429.41 firm fixed price contract is for the installation of HFM (Hydraulic Fill Material) equipment at the Snell Lock facility located in Massena, New York. The Saint Lawrence Seaway Development Corporation operates the strategic binational shipping corridor, and this contract supports the maintenance and...
- The Department of Transportation Saint Lawrence Seaway Development Corporation awarded a Definitive, Firm Fixed Price contract to Tioga Construction Co Inc., a self-certified Small Disadvantaged Business, to construct three (3) hands-free mooring slots in the north wall of Snell Lock per the specified requirements and drawings. The contract has a potential value of $6,275,182.51 and a completion date of September 30, 2019. This contract was not set aside for any specific business...
The Department of Transportation's Saint Lawrence Seaway Development Corporation awarded a $153,058.00 firm fixed price purchase order to Optimation Technology, Inc. (doing business as Optimation) for the development and programming of ice flushing controls at the Snell Lock. This sole source award was made under the authority of FAR 13.106-1(b)(1)(i) due to Optimation being determined to provide the best value to the government. The current ice flushing control system at the Snell Lock needs to be upgraded to integrate fifteen additional Limitorque valves, with Optimation responsible for building, testing, and commissioning the new control system. This work is critical to the robust and reliable operation of the two American Locks that are part of the Saint Lawrence Seaway.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
Development and Assembly of Snell Ice Flushing Controls | 2020-N-P-0804 | Department of Transportation Saint Lawrence Seaway Development Corporation | Limited / Sole Source Justification 3/3 | 8/10/20, 10:24 AM | |
Development and Assembly of Snell Ice Flushing Controls | 2020-N-P-0804 | Department of Transportation Saint Lawrence Seaway Development Corporation | Special Notice 1/3 | 5/4/20, 2:37 PM | |
Development and Assembly of Snell Ice Flushing Controls | 2020-N-P-0804 | Department of Transportation Saint Lawrence Seaway Development Corporation | Award Notice 2/3 | 8/10/20, 10:17 AM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00003 | Close Out | ($26k) | 4/1/22 | |
| P00002 | Supplemental Agreement for work within scope | $25.9k | 12/8/20 | |
| Not listed | Not listed | $138.5k | 8/7/20 | |
| P00001 | Supplemental Agreement for work within scope | $15.0k | 8/7/20 |