STATEMENT OF WORK REPAIR DELUGE SYSTEM BUILDINGS 1207 & 1210 EDWARDS AFB, CA PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT NECESSARY TO REPAIR THE DELUGE SYSTEM AT HANGARS 1207 AND 1210 PER THE DESIGNED DRAWINGS AND AS FOLLOWS: A. REMOVE THE RATE OF RISE DELUGE VALVES AND REPLACE WITH WET PIPE ALARM VALVES. B. REMOVE THE DELUGE VALVES AND ALL RELATED COMPONENTS. C. REPLACE OPEN DELUGE FIRE SPRINKLER HEADS AND REPLACE WITH CLOSED FIRE SPRINKLER HEADS AT THE APPROPRIATE DETERMINED TEMPERATURE RANGE. D. PROVIDE MATERIAL AND INSTALLATION TO COMBINE THE EXISTING 10 DELUGE SYSTEMS IN HANGARS 1207 AND 1210 INTO TWO DELUGE SYSTEMS PER HANGAR BUILDING, PER ETL 02-15 AND NFPA 409. E. REMOVE ALL OLD GROOVED END PIPE COUPLINGS AND REPLACE WITH NEW GROOVED END PIPE COUPLINGS THROUGHOUT THE ENTIRE PIPING SYSTEM. F. TEST AND REPAIR ANY LEAKS THAT MAY BE IN THE FIRE SPRINKLER PIPING, APPROXIMATELY 3% PIPING. G. REMOVE AND REPLACE (AS REQUIRED) ALL EXISTING POST INDICATOR VALVES (PIV S) LOCATED ON THE PERIMETER OF THE FACILITIES. CUT AND CAP PIV S NOT REQUIRED. H. INSTALL NEW O, S & Y VALVES AT EACH RISER, RECONNECT ALL WET-PIPE SYSTEMS ATTACHED TO ANY EXISTING DELUGE RISERS. I. PAINT ALL NEW SYSTEM COMPONENTS TO MATCH EXISTING COLOR SCHEMES. J. INSTALL A HIGH EXPANSION FOAM SYSTEM TO INCLUDE NEW DELUGE VALVES AND PIPING THROUGHOUT THE HANGAR, FOAM TANKS, FOAM GENERATORS, PIPE INSULATION, AND APPLICABLE PIPING TRIM TO PROVIDE A FULLY FUNCTIONAL OPERATING SYSTEM. USE EXISTING PIPING TO MAXIMUM EXTENT POSSIBLE. K. INSTALL SMALL BUILDING WITH HEAT AND LIGHTING FOR ALL HI-EX STORAGE TANKS LOCATED OUTSIDE THE CONFINES OF THE HANGAR. L. THE SYSTEM WILL ACTIVATE ON MANUAL PULL STATION DEVICES INSTALLED DURING CONSTRUCTION AS WELL AS ANY OTHER DEVICES REQUIRED BY THE AIR FORCE. M. ALL NEW RISERS AND ALARM DEVICES, TAMPER SWITCHES ON PIV S AND O,S & Y VALVES WILL BE TIED INTO THE EXISTING FIRE ALARM CONTROL PANEL. IF THE EXISTING FIRE ALARM SYSTEMS CAPACITY IS NOT ADEQUATE OR IS OBSOLETE AND CANNOT BE UPGRADED, THE SYSTEM IS TO BE REPLACED WITH A CLASS A FIRE ALARM SYSTEM. N. PERFORM A COMPLETE FUNCTIONAL TEST AND CERTIFICATION OF THE HIGH-EXPANSION FOAM SYSTEM PRIOR TO FINAL ACCEPTANCE. O. IDENTIFY FOR REPLACEMENT ALL LEAKING WELL SEALS, ELECTRICAL DISTRIBUTION, PUMPS, MOTORS, CONTROL VALVES, GAUGES AND METERS, BOWL ASSEMBLY, OIL TUBE, AND DRIVE SHAFT. P. CONTRACTOR SHALL UPON COMPLETION OF INSPECTION REASSEMBLE ALL COMPONENTS, SANITIZE, RESTART, AND TEST PERFORMANCE OF VALVES AND PIPING. Q. PROVIDE MATERIAL AND INSTALLATION OF NEW FIRE DEPARTMENT CONNECTIONS ( FDC S) FOR BOTH 1207 AND 1210 HANGARS. R. PROVIDE MATERIAL AND INSTALLATION OF A NEW FIRE HYDRANT FOR BOTH 1207 AND 1210 HANGARS. HANGAR 1207 CONNECT TO EXISTING 10 DOMESTIC LINE ON NORTH SIDE OF HANGAR. HANGAR 1210 CONNECT TO EXISTING 8 DOMESTIC LINE ON EAST SIDE OF HANGAR. S. PROVIDE MATERIAL AND INSTALLATION OF SEISMIC CONSTRAINTS ON EXISTING PIPE SYSTEM IN HANGARS 1207 AND 1210. T. PROVIDE MATERIAL AND INSTALLATION OF DRAFT CURTAINS FOR HANGARS 1207 AND 1210 TO MEET CURRENT CODE. U. PROVIDE MATERIAL AND INSTALLATION AND/OR REPLACEMENT OF FIRE PUMP CONTROLLER PANELS. EDWARDS AIR FORCE BASE AND CORPS OF ENGINEERS POCA SPECIFICATION STANDARD REQUIREMENTS PERFORMANCE PERIOD IS THREE HUNDRED SIXTY-FIVE (365) CALENDAR DAYS FROM THE TIME THE CONTRACTOR RECEIVES THE FORMAL NOTICE TO PROCEED FROM THE CONTRACTING OFFICER S REPRESENTATIVE. DAVIS BACON WAGE DETERMINATION IS CA120031 FOR KERN COUNTY EFFECTIVE AT TIME OF AWARD. LIQUIDATED DAMAGES ARE CALCULATED AT $1,060.00 PER DAY.
Mod # | Description | Reason For Modification | Federal Obligation (Click to sort descending) | Date (Click to sort ascending) |
|---|---|---|---|---|
| Not listed | Not listed | $3.4m | 9/22/12 |