Delivery Order GS06P14GXD0011-47PG0320F0088

Award Date 9/29/20
Potential Completion Date 3/8/21
Potential Value $39K
Federal Agency
Region 6
Awardee
I & L FMS
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
St. Louis, MO 63102, USA
Solicitation Procedures
Negotiated Proposal / Quote
Number Of Offers Received
Not listed
Legislative Mandate
Service Contract Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This is a $131,059.19 firm fixed-price delivery order contract awarded by the General Services Administration's (GSA) Public Buildings Service Region 6 to I & L FMS, a minority-owned, small disadvantaged, veteran-owned, and Asian-Pacific American owned business based in St. Louis, Missouri. The contract is for the repair of the duct bus at the Thomas F. Eagleton U.S. Courthouse in St. Louis, Missouri. The contract was set aside for competitive 8(a) small businesses and has a period of...
The General Services Administration's Public Buildings Service Region 6 awarded a $40,564.60 firm fixed price delivery order to I & L FMS to perform repairs to the east main lobby entrance rotating door at the Thomas F. Eagleton U.S. Courthouse in St. Louis, Missouri. Work will be conducted at the specified courthouse location between August 9, 2023 and December 7, 2023. As the designated prime contractor, I & L FMS will furnish all necessary labor, materials, equipment, and...
The General Services Administration Public Buildings Service Region 6 awarded a $38,538 fixed-price delivery order to I & L FMS to perform facility maintenance and repair services at the Thomas F. Eagleton U.S. Courthouse in St. Louis, Missouri. Under the contract, I & L FMS will repack seals on Fire Pump 3, replace the backflow preventer, repair damaged fencing, and repair a leaking heat exchanger at the courthouse facility. The period of performance is from July 31, 2023 through...
This federal contract award to HOF Construction Inc., a general contracting firm based in St. Louis, Missouri, provides for the release, remodeling, and renovation of restrooms, chambers, offices, and courtrooms on the 23rd and 26th floors of the Thomas F. Eagleton U.S. Courthouse in St. Louis. The $1,322,076.00 fixed-price delivery order was issued by the Administrative Office of the U.S. Courts and has a completion date of March 29, 2019. This work is not set aside for any particular...
The General Services Administration's Public Buildings Service Region 6 awarded a $33,216 firm fixed price delivery order to J.E. Novack Construction Company, doing business as J.E. Novack, to repair and reroute the makeup line for the glycol cooling tower that froze at the Thomas F. Eagleton U.S. Courthouse in St. Louis, Missouri. The delivery order was issued against the agency's previously awarded PBS Region 6 Construction Services 2019 indefinite-delivery/indefinite-quantity multiple award...
HOF Construction Inc. was awarded a firm fixed price delivery order against an unspecified contract vehicle to renovate pretrial offices at the Eagleton Courthouse located at 111 S. 10th St. in St. Louis, Missouri. The $12,164.19 potential value contract was awarded by the Administrative Office of the U.S. Courts on October 6, 2021, with an anticipated completion date of April 4, 2022. No set-aside designation was applied to this procurement. Work will be performed onsite at the specified St....
The Department of Justice United States Marshals Service awarded HOF Construction Inc. a $210,843.60 firm fixed price delivery order for renovations at the Thomas F. Eagleton United States Courthouse located at 111 South 10th Street in St. Louis, Missouri. The renovations are to be completed by March 28, 2021 at the specified courthouse location. No set-aside designation was applied to this contract action. HOF Construction Inc. will serve as the prime contractor to deliver the renovations for...
The General Services Administration's Public Buildings Service Region 6 awarded a firm fixed price delivery order valued at three thousand eight hundred two dollars and three cents ($3,802.03) to I&L FMS as the prime contractor. The order is to replace two duct detectors and one fire alarm system relay at the Thomas F. Eagleton U.S. Courthouse in St. Louis, Missouri by January 19, 2024. No subcontractors or set aside designations were indicated. The delivery order was issued against an...
This firm-fixed-price delivery order was awarded by the General Services Administration (GSA) Heartland Region 6 to HOF Construction Inc., a small business construction services provider based in St. Louis, Missouri. The $220,815 contract is for repairs to the Thomas F. Eagleton United States Courthouse in St. Louis, Missouri, to return the En Banc Courtroom to its original condition following a pipe freeze incident. The contract was issued under the GSA Heartland Region 6 Design Build...
HOF Construction Inc. was awarded a firm fixed price delivery order for $141,725.32 to replace sally port doors at the Thomas F. Eagleton United States Courthouse in St. Louis, Missouri. The contract has a completion date of July 10, 2022 and was awarded on November 12, 2021 by the Department of Justice United States Marshals Service Management Support Division. No set-aside designation was used for this solicitation. The contract will deliver replacement of the secure entry doors at the...
  • GS06P14GXD0011
    Indefinite Delivery Contract
  • GS06P14GXD0011-47PG0320F0088
    Delivery Order

DUCT WORK REPAIR AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102.

Posted 9/29/20, 12:00 AM