This is a delivery order contract awarded by the Department of the Air Force Materiel Command Oklahoma City Air Logistics Complex to Northrop Grumman Systems Corp, a subsidiary of Northrop Grumman Corporation, for $6,208,229.28. The contract is for the repair and refurbishment of the aft deck on B-2 Spirit stealth bombers at Northrop Grumman's facility in Palmdale, California. The contract is a cost-plus-incentive type and was not set-aside. As the prime contractor, Northrop Grumman Systems Corp...
The Department of the Air Force Materiel Command Oklahoma City Air Logistics Complex awarded a $22.7 million firm fixed price delivery order contract to Northrop Grumman Systems Corp for B-2 laboratory support services. As the prime contractor, Northrop Grumman Aeronautics Systems Division will perform the contract utilizing its facilities in Palmdale, California to provide technical support for the B-2 stealth bomber weapon system through December 2020. No subcontractors or set aside...
This is a delivery order awarded by the Ogden Air Logistics Complex, part of the U.S. Air Force Materiel Command, to Northrop Grumman Systems Corporation's Aeronautics Systems Division. The $1,402,783.00 contract is for B-2 Spirit stealth bomber composite drop-in and unscheduled structural repair work. It is a cost-plus-fixed-fee contract that runs through April 29, 2025. Northrop Grumman has a long history of supporting the B-2 fleet through various sustainment, modernization, and upgrade...
The Department of the Air Force Materiel Command Oklahoma City Air Logistics Complex awarded a $601,826.12 firm-fixed-price delivery order to Northrop Grumman Systems Corp, a subsidiary of Northrop Grumman Corporation, for the B-2 AFT DECK PROGRAM at Whiteman Air Force Base. The contract, which does not have a set-aside designation, was awarded on September 27, 2019 with a completion date of September 29, 2020. As the prime contractor, Northrop Grumman Systems Corp has previously delivered...
This federal contract award is for B-2 Contractor Logistics Support efforts with the Oklahoma City Air Logistics Complex, which is part of the U.S. Air Force. The $7,397,580.00 firm fixed-price delivery order contract with Northrop Grumman Systems Corporation (Northrop Grumman) covers additional repair work, including the installation and removal of engine adapters and radar antenna lift fixtures for the B-2 Spirit stealth bomber fleet. The contract has no set-aside designation. Northrop Grumman...
The Department of the Air Force Materiel Command Oklahoma City Air Logistics Complex awarded a $7.5 million delivery order to Northrop Grumman Systems Corp for B-2 aircraft deck removal and replacement work. Northrop Grumman Aeronautics Systems Division, doing business as Western Region, will serve as the prime contractor. Major subcontractors include GKN Aerospace ST. Louis LLC for technical services, United Rentals (North America), Inc. for industrial materials and equipment, and PB&J...
This federal contract award, valued at $1,828,608.32, was issued by the Oklahoma City Air Logistics Complex to Northrop Grumman Systems Corporation for additional B-2 Contractor Logistics Support efforts, including power static inverter, radar antenna lift fixtures, and hoist motor assembly. The contract is a cost-plus-fixed-fee delivery order and is not designated as a set-aside. Northrop Grumman, as the prime contractor, has previously received numerous delivery order contracts from agencies...
The Department of the Air Force Materiel Command Oklahoma City Air Logistics Complex awarded Northrop Grumman Systems Corporation a $13.5 million delivery order contract to perform 2018 B-2 AFT DECK REMOVAL AND REPLACEMENT work. Northrop Grumman Aeronautics Systems Division will serve as the prime contractor. Major subcontractors include Coast Aerospace Manufacturing, Inc., Eta Global, Inc., and U.S. Tool Grinding, Inc. doing business as US Tool Group. The contract is a cost-plus-incentive-fee...
This federal contract award (FA861614D6060|FA811016F0003) was issued by the Oklahoma City Air Logistics Complex, a U.S. Air Force organization, to Northrop Grumman Systems Corporation for B-2 Spirit stealth bomber deck removal and replacement services. The $16,960,004.53 cost-plus-incentive contract has a period of performance through March 31, 2018. The contract is not designated as a set-aside. Northrop Grumman, the prime contractor, is a major aerospace and defense company that specializes in...
This federal contract award, with an ID of FA861614D6060|FA811016F0004, was issued by the Oklahoma City Air Logistics Complex, a defense agency, to Northrop Grumman Systems Corporation. The $2,957,132.00 delivery order contract is for the requalification of B-2 material and reconstitution of the production for the B-2 sensing element. The contract is a cost-plus-fixed-fee type and does not have a set-aside designation. Northrop Grumman, the prime contractor, has subcontracted work to Kidde...