WPAFB - Architect and Engineering (Multi-Discipline) Services
Added: Jan 07, 2010 7:31 am PRESOLICITATION NOTICEARCHITECT & ENGINEERING SERVICES: Projects 10-1005, and 10-1006 Indefinite Delivery Contract for FY 10-15 Multidiscipline Projects at Wright-Patterson Air Force Base, Ohio. The scope of the projects will include site visits and investigations, design and economic analysis, construction drawings and specifications, survey of facilities for asbestos containing materials and lead coatings including sampling, testing and abatement design, detailed cost estimates and a bidding schedule for each project. The Architect-Engineer (A-E) shall be required to produce design documents in both electronic and hard copy format; drawings shall be in Microstation (dgn and pdf) formats, construction specifications shall be in conformance with the Unified Facility Guide Specifications (UFGS) using SpecsIntact (in both Word and pdf formats). Use of 3D applications may be required. Multiple awards may be made. Awards will be considered for firms with multi-discipline capabilities (i.e., alteration and repair of buildings and structures, HVAC systems and renovation and repair of miscellaneous utilities and infrastructure systems).The significant evaluation factors to be used in the selection process are as follows: (1) Specialized Experience in designing projects of a multidiscipline effort i.e., alteration and repair of buildings and structures, HVAC systems and renovation and repair of miscellaneous utilities; (2) Professional Qualifications of the staff to be assigned to this project in the architectural, electrical, civil/structural, environmental and mechanical disciplines; (3) Professional Capacity of the A-E firm to accomplish the work within the anticipated schedule; (4) Past Performance of the A-E firm with respect to the execution of DOD and other contracts; (5) Location of the A-E firm in the general geographic area as site visits and Government - A/E firm interaction will be required; (6) Volume of work previously awarded to the A-E firm by DOD with the object of effecting an equitable distribution of DOD contracts among qualified A-E firms; and (7) Project Manager's qualification and experience in the assigned projects under this contract.Performance period will be 365 days from contract award date, with four one-year options. Depending on Government needs and the number of contracts awarded, depending on the selected firms' capabilities, individual delivery orders will not exceed $1,500,000.00 and the cumulative amounts for all delivery orders in a year will not exceed $2,500,000.00, with a five-year maximum of $12,000,000.00. A minimum of $10,000 in fees will be guaranteed to the A-E firm over the life of the contract including any exercised options.If acceptable packages are received from 8(a) or HUBZONE firms, the government reserves the right to do an 8(a) Set Aside or placement with a HUBZONE contractor.A-E firms desiring consideration should submit two (2) copies of Standard Form (SF) 330, Architect-Engineer Qualifications, Parts I and II. Limit your SF 330 along with supporting data to a total package of not more than 45 pages (including cover page and section dividers). Pages in excess of this maximum limit will not be evaluated by the selection board. Responses received by 9 February 2010, 1400 (Eastern) will be considered. Multiple contracts may be awarded from this advertisement. This is not a request for proposal.Mark all delivery envelopes/boxes with the Project Numbers 10-1005/10-1006Submittals shall be addressed to the attention of Mr. Pete Regan, 88 CONS/PKJ, Building 1, Suite 3, 1940 Allbrook Drive, Wright-Patterson AFB, OH 45433-5309, Telephone: (937) 522-4563.POSTED 7 January 2010 FA8601-10-R-0002 Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base
Award Notice 1/1 1/7/10, 7:31 AM