Delivery Order FA853320D0003-FA853320F0052

Award Date 4/30/20
Potential Completion Date 4/30/23
Potential Value $3M
Federal Agency
AFLCMC Robins AFB
Awardee
Newvac LLC
Federal Contract Vehicle
Set-Aside Type
No Set-Aside Used
Extent Competed
Not Competed
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Chatsworth, CA 91311, USA
Solicitation Procedures
Only One Source
Number Of Offers Received
Not listed
Legislative Mandate
Walsh Healy Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
The Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base awarded a $47,000 firm fixed price delivery order contract to Newvac, LLC, an American Defense Interconnect Division, for an ENGINE WARNING TEST SET. Performance will occur in Chatsworth, California by July 30, 2021. No set aside designation was used. As a division of ADI American Distributors, LLC, Newvac will provide the requested test set to support the Air Force Materiel Command's aircraft...
The Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base awarded a $47,000 firm fixed price delivery order contract to Newvac, LLC, an American Defense Interconnect Division, for an ENGINE WARNING TEST SET. Performance will occur in Chatsworth, California by July 30, 2021. No set aside designation was used. As a division of ADI American Distributors, LLC, Newvac will provide the test set to support the Air Force Materiel Command's aircraft maintenance...
The Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base awarded a $47,000 firm fixed price delivery order contract to Newvac, LLC for an ENGINE WARNING TEST SET. As the American Defense Interconnect division of Newvac, the awardee will deliver the test set from its location in Chatsworth, California to support aviation systems and equipment at Robins Air Force Base. No set-aside designation was used for this award issued under one of seven existing...
This federal contract award is for the delivery of CONTROL TEST SETS to the U.S. Air Force Materiel Command (AFMC) through the Air Force Life Cycle Management Center (AFLCMC) at Robins Air Force Base. The $360,000.00 firm-fixed-price delivery order was awarded to Newvac LLC, operating as the American Defense Interconnect Division, on November 12, 2024. Newvac is a small business manufacturer of cable assemblies, wiring harnesses, and other interconnect components. This order is not a set-aside...
This is a firm-fixed-price delivery order awarded by the Air Force Life Cycle Management Center at Robins Air Force Base to Newvac LLC, operating as the American Defense Interconnect Division. The $425,000.00 contract is for the delivery of control test sets, with a period of performance ending on September 30, 2024. Newvac LLC is a subsidiary of ADI American Distributors, LLC, a small business manufacturer specializing in the production of cable assemblies, wiring harnesses, and other...
This is a delivery order awarded by the Defense Logistics Agency (DLA) Aviation to Newvac LLC, operating as American Defense Interconnect Division, for the supply of cable assemblies, wiring harnesses, and other interconnect components. The $100,000.00 firm-fixed-price contract does not have a set-aside designation. Newvac is a small business manufacturer based in Chatsworth, California, that specializes in producing high-reliability interconnect solutions for military and aerospace...
This is a $586,348.00 firm-fixed-price purchase order awarded by the Defense Logistics Agency (DLA) Aviation to Newvac LLC, operating as the American Defense Interconnect Division, a small business manufacturer based in Chatsworth, California. The contract is for the production of cable assemblies, wiring harnesses, and other specialized electronic components primarily for military and aerospace applications. This award is a set-aside for small businesses and is part of Newvac's portfolio of...
This is a delivery order contract awarded by the Defense Logistics Agency (DLA) Aviation to Newvac LLC, operating as the American Defense Interconnect Division. The $53,323.25 firm-fixed-price contract is for the production of cable assemblies to support military aircraft, such as the F-16 fighter jet. Newvac is a small business manufacturer based in Chatsworth, California, that specializes in high-reliability interconnect solutions for the Department of Defense. This contract is not a set-aside...
This is a firm fixed-price purchase order awarded by the Department of the Air Force Materiel Command Ogden Air Logistics Complex to Newvac, LLC, a small business manufacturer doing business as American Defense Interconnect Division, for the delivery of F16 STORES SYSTEM TESTER CABLE ASSEMBLIES. The contract has a potential value of $118,242.46 and a completion date of August 18, 2021. This award was a Total Small Business set-aside based on a pre-solicitation posted on June 19, 2018 with a...
This is a delivery order contract awarded by the Defense Logistics Agency (DLA) Aviation to Newvac LLC, operating as the American Defense Interconnect Division, a small business manufacturer based in Chatsworth, California. The contract is for the production of cable assemblies to the DLA under a firm fixed-price contract with a ceiling value of $58,800.00. The contract has a performance period extending to June 13, 2024. Newvac LLC is a subsidiary of ADI American Distributors, LLC, and has...
  • FA853320D0003
    Indefinite Delivery Contract
  • FA853320D0003-FA853320F0052
    Delivery Order

The Department of the Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base awarded a $3 million firm fixed price delivery order contract to Newvac, LLC American Defense Interconnect Division for the provision of engine warning test sets. As the prime contractor, American Defense Interconnect Division will deliver the requested test equipment from its production facilities in Chatsworth, California. The contract has a period of performance through April 2023. No subcontractors or set aside designations were indicated. This delivery order was issued against an unidentified multiple award contract vehicle held by the Air Force Lifecycle Management Center to support its aircraft maintenance and logistics programs.

Generated 12/25/23, 2:23 AM