Delivery Order FA821415D0002-0002
- Not listed
- This is a $68,148,804.61 cost-plus-award-fee delivery order contract awarded by the Nuclear Weapons Center, an agency of the U.S. Department of Defense, to The Boeing Company for the repair of the guidance subsystem of the Minuteman III intercontinental ballistic missile. The contract has an ultimate completion date of September 27, 2020 and was awarded on September 28, 2019. This contract is part of a larger Indefinite Delivery Vehicle (IDV) worth $2.414 billion that Boeing holds with the Air...
- This contract was awarded by the Air Force Materiel Command, a defense agency, to The Boeing Company to repair the guidance subsystem of the Minuteman III intercontinental ballistic missile. The $54,442,160.94 cost-plus-award-fee contract has a completion date of September 27, 2019 and does not utilize a small business set-aside. Boeing, as the prime contractor, frequently collaborates with subcontractors like Northrop Grumman Systems Corporation and Lockheed Martin Corporation. This contract is...
- This firm-fixed-price delivery order, awarded by the Air Force Materiel Command, repairs the missile guidance set of the Minuteman III intercontinental ballistic missile (ICBM) for the U.S. Air Force. The $58,449,300.00 contract was awarded to The Boeing Company's Defense, Space & Security division on June 3, 2015, with a final completion date of September 27, 2016. This work is part of a larger Indefinite Delivery Vehicle (IDV) contract, valued at up to $2.4 billion, that covers the...
- The U.S. Air Force Materiel Command awarded a $58,284,021.41 cost-plus-award-fee delivery order contract to The Boeing Company for the purpose of providing repair services for the guidance system of the Minuteman III intercontinental ballistic missile. This order is not a set-aside contract. Boeing's Defense, Space & Security division will perform the work at its facility in Heath, Ohio. As a prime contractor, Boeing has significant experience supporting the Air Force's nuclear deterrence...
- The U.S. Air Force Materiel Command awarded Boeing Defense, Space & Security a delivery order valued at $128.6 million to repair the guidance subsystem of the Minuteman III intercontinental ballistic missile under a Fiscal Year 2025 missile guidance repair program. This cost-plus award fee contract, which carries no small business set-aside designation, is scheduled for completion by September 27, 2039, with primary work performed at Boeing's facility in Heath, Ohio. The delivery order is...
- The Department of the Air Force Materiel Command awarded a $60,076,503.64 cost-plus-award-fee delivery order contract to The Boeing Company to repair the guidance subsystem of the Minuteman III intercontinental ballistic missile. As the original equipment manufacturer, Boeing will leverage its technical expertise to conduct maintenance, repair, and upgrades on the missile's avionics and flight control components at its facility in Heath, Ohio. This delivery order is part of a larger...
- This is a federal contract award to The Boeing Company, doing business as Boeing, for the sustainment of the guidance system for the Minuteman III intercontinental ballistic missile. The $6,215,742.27 award is a delivery order under an indefinite-delivery/indefinite-quantity (IDIQ) contract with the Air Force Materiel Command. The IDIQ contract, valued at $1.615 billion, provides for sustainment engineering, maintenance, modification, and hardware and software support to ensure the operational...
- The Boeing Company's Defense, Space & Security Division received a delivery order valued at $118.5 million from Air Force Materiel Command to repair the guidance subsystem of the Minuteman III intercontinental ballistic missile. This cost-plus award fee contract, with an ultimate completion date of September 27, 2021, was awarded on September 28, 2020, with no small business set-aside designation. Work will be performed at Boeing's facility in Heath, Ohio, where the company specializes in...
- The Boeing Company's Defense, Space & Security Division received a delivery order valued at $221.9 million from the Air Force Materiel Command to repair the guidance subsystem of the Minuteman III intercontinental ballistic missile. Awarded on July 25, 2023, with an ultimate completion date of September 27, 2045, this contract carries a cost-plus award fee pricing structure and no small business set-aside designation. The work will be performed at Boeing's facility in Heath, Ohio, where...
- The Boeing Company's Defense, Space & Security Division received a delivery order valued at $124.1 million from Air Force Materiel Command to repair the guidance subsystem on Minuteman III intercontinental ballistic missiles. This delivery order is a child contract under Boeing's larger Indefinite Delivery Contract with the Air Force, which carries a total value of $2.414 billion for Minuteman III missile guidance subsystem sustainment through 2045. The contract utilizes a Cost Plus Award...
- FA821415D0002Indefinite Delivery Contract
- FA821415D0002-0002Delivery Order
This is a cost-plus-fixed-fee delivery order contract awarded by the U.S. Air Force Nuclear Weapons Center to The Boeing Company for the repair of the guidance system of the Minuteman III intercontinental ballistic missile (ICBM) weapon system. The contract has a ceiling value of $947,749.00 and a period of performance through December 31, 2018. The contract is not set aside for any small business designation. Boeing, the prime contractor, frequently collaborates with subcontractors Northrop Grumman Systems Corporation and Lockheed Martin Corporation on highly specialized defense contracts such as this one. The contract is part of the Air Force's broader Minuteman III ICBM sustainment program, which aims to maintain the operational readiness of this critical strategic deterrent system.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
Guided Missiles | FA8214-15-R-1234 | Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base | Award Notice 1/1 | 6/17/14, 10:20 AM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 1B | Other Administrative Action | $0 | 12/20/17 | |
| 1A | Other Administrative Action | $0 | 1/28/16 | |
| Not listed | Not listed | $947.7k | 9/29/15 |