Delivery Order AG4146C120016-AG4146D150029
Award Date 5/27/15
Potential Completion Date 10/15/15
Potential Value $16K
Federal Agency
Ultimate Awardee
Not listed NAICS Category
PSC Category
Federal Contract Vehicle
- Not listed
Set-Aside Type
Total Small Business
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Heflin, AL 36264, USA
Solicitation Procedures
Multiple Award, Fair Opportunity
Number Of Offers Received
3
Legislative Mandate
Service Contract Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- This is a firm-fixed price contract awarded by the Department of Agriculture Forest Service R8-Southern Region to GC Works Inc., an 8(a) and HUBZone certified small disadvantaged business, for the NFSR 601 Culvert Replacement project on the Talladega National Forest in Alabama. The $691,903.97 contract requires the removal of the existing low water crossing structure and the design and construction of a new 35-foot span by 13.5-foot rise aluminum box culvert, along with associated guardrails,...
- This contract, awarded by the U.S. Department of Agriculture Forest Service to Patton Excavation, a for-profit Subchapter S corporation, replaces two Civilian Conservation Corps (CCC)-era culverts and constructs two temporary bypass roads with temporary bridges on Mulky Gap Road in Gainesville, Georgia. The contract, which has a firm-fixed-price of $494,564.34, does not have a set-aside designation. The work was originally solicited as a competitive, unrestricted contract opportunity. The...
- This definitive contract was awarded by the Department of Transportation Federal Highway Administration to Meridian Engineering Co for $860,324.40 to complete aquatic organism passage improvements on Stone Creek in Alpine, Arizona. The solicitation sought a contractor to replace two deteriorated culverts with a larger 14'2" x 9'10" structural plate pipe arch culvert approximately 48 feet in length, including concrete headwalls and wingwalls as well as a 100-foot-long low water...
- This is a delivery order awarded by the U.S. Army Corps of Engineers (USACE) to Steep Creek LLC, a small business based in Salesville, Arkansas. The order is for road closure services as part of the Mountain Home Project Office, under an Indefinite Delivery, Indefinite Quantity (IDIQ) contract. The order has a firm fixed price of $40,011.60 and a performance period ending on December 31, 2025. Steep Creek LLC has multiple IDIQ contracts with USACE and other federal agencies, with potential...
- <p>This is a $64,705.54 firm-fixed-price definitive contract awarded by the Operations Center East, a civilian U.S. government agency, to Stibbe Excavating And Grading, Inc. for the COLDWATER CREEK CULVERT REPLACEMENT project under the COLDWATER CREEK AT FR2404 CULVERT REPLACEMENT major program. The contract has an ultimate completion date of January 3, 2011 and was awarded on May 25, 2010. This contract does not have a set-aside designation.</p>
- This is a firm-fixed-price construction contract awarded by the Federal Highway Administration (FHWA), a civilian agency, to Stormwater Plans LLC, a HUBZone certified Alaska Native Corporation (ANC), for the ASH CANYON CROSSING project under the Arizona Federal Lands Access Program (FLAP). The contract has a ceiling value of $438,429.00 and was awarded on a sole-source 8(a) basis. Stormwater Plans LLC specializes in paving, earthwork, drainage, and civil site work, and has previously supported...
- The Federal Highway Administration has issued a delivery order modification under the South Atlantic Regional Construction Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) to Central Southern Construction Corp., an SBA-certified HUBZone firm headquartered in Jacksonville, Florida. This modification extends the period of performance for Project NC ERFO NP BLRI 2024-1(7) through May 31, 2027, with a ceiling value of $477,370. The work encompasses slide...
- The Federal Highway Administration (FHWA) awarded a delivery order valued at $6.8 million to Central Southern Construction Corp., an SBA-certified HUBZone firm based in Jacksonville, Florida, for emergency repairs to the Blue Ridge Parkway in Black Mountain, North Carolina. The project scope includes slide repair utilizing reinforced soil slope techniques, minimal tree removal for access, and ditch reconditioning to address damage caused by Hurricane Helene. This delivery order was issued...
- This contract represents a no-cost administrative modification that financially and contractually closes a delivery order issued to Bryant's Land and Development Industries, Inc. for $1.96 million. The project involved resurfacing work on the Cades Cove Loop Road and Cades Cove Campground Entrance Road within Great Smoky Mountains National Park, including parking areas and pull-offs with asphalt pavement installation. The work was performed in Allgood, Alabama, under a firm fixed-price...
- The Federal Highway Administration awarded a $6,084,629.50 definitive contract to JAL Construction, Inc. (doing business as 1859 Infrastructure) for construction of the Historic Columbia River Highway State Trail segment from Perham Creek to Mitchell Point on November 4, 2025, under a total small business set-aside. The originating solicitation encompasses clearing, excavation, grading, wall construction, bridge installation, drainage systems, and asphalt paving across a 1.03-mile segment...
- AG4146C120016Indefinite Delivery Contract
- AG4146C120016-AG4146D150029Delivery Order
FOR OTHER FUNCTIONS: MID-STORY REMOVAL SHOAL CREEK RD, FY 2015
Posted 5/27/15
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 1 | Supplemental Agreement for work within scope | $2.5k | 8/6/15 | |
| Not listed | Not listed | $13.3k | 5/27/15 |