Definitive Contract W912ES24C0002

Award Date 2/16/24
Potential Completion Date 8/15/25
Potential Value $2.3M
Funding Federal Agency
US Army Corps of Engineers
Contracting Federal Agency
ENDIST St Paul
Ultimate Awardee
Not listed
Set-Aside Type
Total Small Business
Federal Contract Vehicle
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Eastman, WI, USA
Solicitation Procedures
Sealed Bid
Number Of Offers Received
4
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
The U.S. Army Corps of Engineers awarded a $2,920,595.00 firm-fixed-price contract to Togiak Management Services LLC, an Alaskan Native Corporation-owned small disadvantaged business, for the Lock and Dam 3 Auxiliary Lock Bulkhead Slot Construction project. This contract was set aside for small businesses and requires the contractor to create bulkhead recesses for the auxiliary lock bay closure of Lock and Dam 3 on the Mississippi River near Welch, Minnesota. The contract has an ultimate...
This is a $9,104,047.00 firm fixed price definitive contract awarded by the U.S. Army Corps of Engineers (USACE) to Togiak Management Services LLC, an Alaskan Native Corporation-owned small disadvantaged business certified under the Small Business Administration's 8(a) Business Development Program. The contract is for the construction of a mooring cell at Lock and Dam 14/15 and has a total small business set-aside designation. Togiak Management Services LLC has been awarded several other federal...
This contract, awarded by the U.S. Army Corps of Engineers (USACE) to Togiak Logistics Services, LLC, is for the LD4 ENDCELL REHABILITATION project. The $5,343,118.75 firm-fixed-price contract involves demolishing existing structures, performing concrete repairs, constructing a new 33-foot diameter sheet pile cell with tremie-filled concrete, and installing a precast structural wall panel at Lock and Dam No. 4 on the Mississippi River in Alma, Wisconsin. This contract was awarded as a total...
The U.S. Army Corps of Engineers awarded a $2,700,828.77 firm fixed-price contract to Togiak Management Services LLC, an Alaskan Native Corporation-owned small disadvantaged business, for the construction of a sheetpile mooring cell at Lock and Dam 14 on the Mississippi River in Hampton, Illinois. The contract, which has a total small business set-aside, was awarded through a competitive solicitation process and includes mechanical dredging, sheet piling installation, armor plating, painting...
The Department of the Army Corps of Engineers awarded a firm-fixed price contract to Togiak Management Services LLC, an 8(a) certified small business, for sheet pile construction at Locks and Dams 6 and 10 located in Iowa and Wisconsin. The total potential value of this contract is $6,859,779.62. The work involves installing sheet piles to create auxiliary lock bay closures, including securing the piles with tie-rods, filling with granular material, and applying permeation grouting for seepage...
This is a definitive contract awarded by the U.S. Army Corps of Engineers, St. Paul District (USACE-SPL) to Coastal Environmental Group Inc., a self-certified small disadvantaged business, for the Lock and Dam 3 Upper Embankments Project. The $5,279,899.59 firm-fixed-price contract includes reconstructing nine channel closures along approximately 2.25 miles of the Wisconsin embankment upstream of Lock & Dam 3 on the Mississippi River. The project is designated as a HUBZone set-aside and...
This federal contract was awarded by the U.S. Army Corps of Engineers (USACE) to Supplied Industrial Solutions, Inc., a veteran-owned, minority-owned small business, for the LOCK AND DAM 25 HORIZONTAL RESURFACING OF LOCK WALL project. The $4,013,681 firm-fixed-price contract has an ultimate completion date of March 11, 2026. The award was made under an 8(a) sole-source set-aside, leveraging Supplied Industrial Solutions' SBA 8(a) Program Participant certification. This contract supports the...
This is a $400,000.00 firm fixed price contract awarded by the U.S. Army Corps of Engineers (USACE) to Rig Masters Inc., a small business, for the construction of the Columbia Lock and Dam Remote Operations Building in Columbia, Louisiana. The contract was awarded on September 22, 2016 and has a completion date of June 29, 2018. The original solicitation was a small business set-aside, with a posted value of between $100,000 and $250,000. The work includes earthwork, concrete work, masonry,...
This is a $21,907,293.52 firm fixed-price definitive contract awarded by the U.S. Army Corps of Engineers to L S Marine Inc., a self-certified small disadvantaged business based in Cottage Grove, Minnesota. The contract is for the Upper Pool 4 Project near Lake Pepin in Wisconsin, which involves restoration, protection, and creation of aquatic and wetland habitats along the Mississippi River. The work includes access dredging, construction of water control structures, dikes, access roads, and...
This is a firm-fixed-price contract awarded by the U.S. Army Corps of Engineers (USACE), St. Paul District to PM Jenkins Group-Professional Management Services LLC, doing business as W4 Construction Group, for the installation of sheet pile at Lock and Dam 8 near Genoa, Wisconsin. The contract, valued at $4,824,146.28, is a 100% small business set-aside under NAICS code 237990 for other heavy and civil engineering construction. The project involves installing two parallel rows of sheet pile...

This firm-fixed-price contract was awarded by the U.S. Army Corps of Engineers (USACE) to Togiak Management Services LLC, an Alaskan Native Corporation-owned small disadvantaged business certified under the Small Business Administration's 8(a) Business Development Program. The contract, valued at $2,261,902.25, is for the construction of bulkhead recesses for the auxiliary lock bay closure of Lock and Dam 9 (LD9) on the Mississippi River near Lynxville, Wisconsin. The work involves the creation of structural steel and concrete bulkhead recesses in the auxiliary lock bay, which is located to the riverside of the main lock. This contract is a set-aside for small businesses and is expected to be completed by August 15, 2025.

Generated 11/15/24, 9:16 AM