DESIGN-BUILD. Breakwater & Ammunition Pier Repair located at the Kuwait Naval Base (KNB), Kuwait (known locally as Mohammed Al Ahmed Naval Base).
Added: Apr 23, 2015 11:40 am This Source Sought notice does not obligate the Government to award a contract or otherwise pay for the information provided in response. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's qualifications to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or provide feedback to respondents with respect to any information submitted. After a review of the responses received, a pre-solicitation synopsis and solicitation may be published in Federal Business Opportunities. However, responses to this notice will not be considered adequate responses to a solicitation. This requirement is assigned a code of 237990 in the North American Industry Classification System (NAICS), and the size standard for such requirements is $36.5M per annum. Statements should also include the eligible business concern's name, point of contact, address, and DUNS number. 1. CONTRACT INFORMATION: The U.S. Army Corps of Engineers (USACE), tough its Transatlantic Division (TAD), Middle East District (TAM), is evaluating the ability of businesses to perform the Breakwater & Ammunition Pier Repair located at the Kuwait Naval Base (KNB), Kuwait (known locally as Mohammed Al Ahmed Naval Base). The Government is performing market research in order to specifically determine the capability of potential offerors to perform the work specified below. It is anticipated that a solicitation announcement will be published on the Federal Business Opportunities website (https://www.fbo.gov/) in the near future. The solicitation will consist of multiple Contract Line Item Numbers (CLINS), which are Firm Fixed Price. The estimated magnitude of this Construction project is between $25,000,000 and $100,000,000 with an anticipated period of performance of 640 days after issuance of the Notice to Proceed. 2. PROJECT INFORMATION: The United States Army Corps of Engineers has the requirement to repair the south breakwater and ammunition pier at Kuwait Naval Base. KNB was originally constructed in the late 1970's and over the last 40 years the superstructure of the south breakwater and the ammunition pier (which is accessed from the breakwater) has fallen into disrepair. There is significant cracking and various types of damage to the concrete superstructure of the breakwater. The breakwater is approximately 1.2 kilometers in length and creates an artificial harbor for the portside operations of KNB. The breakwater supports a roadway allowing two-way traffic to the head of the breakwater, as well as various utilities (including fuel, water, sanitary sewer, and electrical service). The scope of this project includes the replacement of the ocean side parapet wall, repair of various instances of concrete spalling and cracking on the harbor side of the breakwater, various aesthetic improvements to all parts of the breakwater, resurfacing and pothole repair of existing roadways, replacement of harbor side sidewalks, repair and/or replacement of an indicated number of harbor side foundation blocks, and the replacement of all utilities lines. The scope also includes the replacement of access ladders, moorings, water filling stations, sewage offload stations, fueling points, electrical connections for moored vessels, fire suppression connections points, light poles, and navigational lighting. The ammunition pier is approximately 1875 square meters in size, with two access bridges to the roadway on the breakwater, and is used for ammunition loading and off-loading operations. The scope of the project includes the removal and replacement of the concrete decking and all other features of the ammunition pier with the exception of the existing support piles, including the two bridges connecting the ammunition pier to the breakwater. Prior to construction beginning on the ammunition pier, an alternative ammunition pier must be constructed so that periodic ammunition off-load operations can continue during construction. Capability Statement/Information Sought: In addition to the abilities to perform the work identified in this sources sought, interested parties must provide information regarding their ability to be licensed to perform work in Kuwait and must provide evidence of their ability to obtain Corporate or individual sureties as described in the Federal Acquisition Regulations, Subpart 28.2. Corporate sureties offered for Performance and Payment bonds must appear on the list contained in the Department of Treasury Circular 570, quote mark Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and Acceptable Reinsuring Companies. quote mark . The Department of the Treasury Circular 570 may be obtained via the internet at http://www.fms.treas.gov/c570/ . Page Limitations: Interested qualified organizations should submit a capability statement, not to exceed 15 total single-spaced pages using a 12-point font size at a minimum, that clearly details the ability to perform and that addresses the specific requirements described above. All proprietary information should be marked as such. Responses will be reviewed only by US Army Corps of Engineers personnel and will be held in a confidential manner. Delivery Point and Common Cut-Off Date and Time: All capability statements sent in response to this Sources Sought notice must be submitted electronically (via email) to Kenneth Baker, Contract Specialist at kenneth.g.baker@usace.army.mil in MS Word or Adobe Portable Document Format (PDF) no later than May 10, 2015, 3:00PM EST. The subject line must specify quote mark BREAKWATER & AMMUNITION PIER REPAIR - CAPABILITY STATEMENT quote mark . Facsimile responses will not be accepted. All responses must be received by the specified due date and time in order to be considered. ANY RESPONSES RECEIVED AFTER THAT DATE AND TIME WILL NOT BE CONSIDERED. Place of Performance: Kuwait Naval Base (KNB), Kuwait Contracting Office Address: USACE Middle East District, P.O. Box 2250, Winchester, VA 22604-1450 Point of Contact(s): Kenneth G. Baker, 540-665-3783 W912ER-15-R-0027 Department of the Army Corps of Engineers Engineering District Middle East
Award Notice 1/2 4/23/15, 11:40 AM Breakwater and Cargo Pier Repair at Kuwait Naval Base (KNB)
Added: Jun 15, 2015 2:41 pm The U.S. Army Corps of Engineer (USACE) Middle East District intends to solicit names of construction firms experienced in working in the Middle East region who are interested in submitting a firm-fixed price offer for this project. Note: The Project name Breakwater and Ammunition Pier Repair has changed to Breakwater and Cargo Pier Repair. PROJECT SCOPE: This project scope includes the following elements: Repair of the south breakwater and cargo pier at Kuwait Naval Base (KNB). KNB was originally constructed in the late 1970's and over the last 35 years the superstructure of the south breakwater and the cargo pier, which is accessed from the breakwater has fallen into disrepair. There is significant cracking and various types of damage to the concrete superstructure of the breakwater. The breakwater is approximately 1.0 kilometers in length and creates an artificial harbor for the portside operations of KNB. The breakwater supports a roadway allowing traffic to the head of the breakwater, as well as various utilities (including fuel, water, fire water, communications, and electrical service). The scope of this project includes the replacement of the ocean side vertical wall for the length of the breakwater, the replacement of the harbor side walls along the raised head sections, replacement of the road pavement sections on the raised head sections of the breakwater, the repair and resurfacing of the concrete deck along trunk sections of the breakwater, repair/resurfacing of the harbor side wall on the trunk sections, roadway resurfacing for the length of the breakwater, various aesthetic improvements to all parts of the breakwater, replacement of ocean side sidewalks, repair of an indicated number of ocean side foundation blocks, and the replacement of all utility lines. The scope also includes the repair or replacement of safety railings, access ladders, anchor bollards, mooring cleats, water filling stations, fueling points, fire suppression connections points, light poles, flag poles, guard rails, an 110kV transformer, electrical distribution panels, shelters, and navigational lighting. The cargo pier is approximately 1875 square meters in size, with two access bridges to the roadway on the breakwater, and is used for cargo loading and off-loading operations. The scope of the project includes the removal and replacement of the entire pier concrete decking, the access bridges, the concrete pile caps supporting the bridges, and all features of the cargo pier located on top of the bridge and deck. The existing support piles are sound, and may remain. The fender system is structurally independent of the pier deck, and may also remain with the exception of the northern end (which has been irreparably damaged) and the wooden bumpers bolted to the vessel side of the fender. Prior to construction beginning on the cargo pier, an alternative cargo pier must be constructed so that periodic cargo off-load operations can continue during construction. This pier should be considered a permanent feature which will remain after completion of construction. The anticipated period of performance is 640 calendar days for the Project. A firm fixed price contract will be awarded to a prime construction contractor. The magnitude of the project is between $25,000,000.00 and $100,000,000.00. LOCATION: This project is located at the Kuwait Naval Base (KNB), Kuwait. PROPOSAL PERIOD: Two-Phase Design-Build Solicitation is scheduled for release on or about 01 July 2015. The Phase One proposals will be due on or about 30 July 2015. The Phase Two will be issued on or about 15 September 2015 and proposals will be due on or about 04 November 2015.Contract award is scheduled on or about 18 January 2016. SET ASIDES and CODES: As the work will be performed outside of the continental United States, no set asides to small business or socioeconomic preference for this solicitation. This effort is classified tough the North American Industry Classification System Code: 237990 quote mark Other Heavy and Civil Engineering Construction quote mark . PROPOSAL PROCEDURES: This is a Two Phase Design-Build (D/B) solicitation process. In accordance with (IAW) FAR Part 36.303-1, Phase One of the Two-Phase Design-Build selection procedure, offerors will be required to submit Construction Experience (Factor 1), Past Performance (Factor 2) information on relevant projects, and Technical Approach (Factor 3) to be described in the Request for Qualification (RFQ). Price proposals are not to be submitted under Phase One. No more than the top five (5) proposals will be selected to proceed to Phase Two of the evaluation process. For Phase Two of the Two-Phase Design-Build selection procedure, offerors will be required to submit their Design Experience (Factor 1), Project Design and Construction (Factor 2), and Price (Factor 3). Evaluation criteria will be stated in the Request for Proposal. The Government may include options in the Solicitation. This acquisition will result in a single fixed price construction contract. W912ER-15-R-0027 Department of the Army Corps of Engineers Engineering District Middle East
Award Notice 2/2 6/15/15, 2:41 PM