Definitive Contract W9124A09C0044
Award Date 9/29/09
Potential Completion Date 2/26/10
Potential Value $49K
Funding Federal Agency
Contracting Federal Agency
Ultimate Awardee
Not listed PSC Category
Set-Aside Type
HUBZone
Federal Contract Vehicle
- Not listed
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Fort Huachuca, Sierra Vista, AZ, USA
Solicitation Procedures
Sealed Bid
Number Of Offers Received
4
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- This is a $479,508.81 firm fixed-price definitive contract awarded by the U.S. Army Installation Management Command Southwest Region to Marsh Development, Inc., a woman-owned small disadvantaged business based in Arizona. The contract is for a construction project at Fort Huachuca in Arizona to modify the reservoir fill and drain piping, ensure accurate flow measurement, and connect the reservoir overflow and drain to the sewer system. The project is funded through the American Recovery and...
- This is a definitive contract awarded by the Department of the Army Installation Management Command Southwest Region to Marsh Development, Inc., a woman-owned small disadvantaged business, for $732,200.00. The contract is for the repair of the waste water treatment plant drying beds at Fort Huachuca in Arizona, which was funded through the American Recovery and Reinvestment Act (ARRA). The contract has a firm fixed price pricing type and a completion date of February 26, 2010. Marsh Development,...
- This is a firm fixed-price delivery order contract awarded by the U.S. Department of the Army's Installation Management Command Southwest Region to Marsh Development, Inc., a woman-owned small disadvantaged business based in Arizona. The $313,814.00 contract is to perform construction, engineering, and facility services at Fort Huachuca in Sierra Vista, Arizona. The work includes building repairs, mechanical and HVAC upgrades, roof replacements, interior renovations, fire alarm installations,...
- This is a definitive contract awarded by the U.S. Army Installation Management Command Southwest Region to Marsh Development, Inc., a woman-owned small disadvantaged business located in Tucson, Arizona. The $441,564.16 firm fixed-price contract is to install five new flow meters at various locations throughout Wastewater Treatment Plant No. 2 at Fort Huachuca in Arizona. The project is funded through the American Recovery and Reinvestment Act (ARRA). The contract was awarded as an 8(a) sole...
- This is a federal contract award to Marsh Development, Inc., a woman-owned small disadvantaged business based in Tucson, Arizona. The contract, worth $700,244.00, is for roof repair work on Building 90201 at Fort Huachuca in Sierra Vista, Arizona. The contract was awarded by the Department of the Army's Installation Management Command Southwest Region, and is a firm-fixed-price delivery order contract. The contract has no set-aside designation. Marsh Development, Inc. has a strong track record...
- This federal contract award with ID W9124A16C0005 was made by the Department of the Army Installation Management Command Southwest Region to Marsh Development, Inc., a woman-owned small disadvantaged business based in Arizona. The $132,078.00 firm fixed-price definitive contract is for the "RAIL RESTORATION BLDG 41416" project, which involves construction and facility services at Fort Huachuca in Sierra Vista, Arizona. This contract was awarded on a sole-source basis under the 8(a)...
- This federal contract award, valued at $1,763,683.03, was issued by the U.S. Army Corps of Engineers (USACE) to Marsh Development, Inc., a woman-owned small disadvantaged business based in Arizona. The contract requires Marsh Development to replace the roof on Building 33, repair pavement base-wide, and perform roof/window repairs on Buildings 14601 and 14603, as well as pavement repairs, at Fort Huachuca in Arizona. The contract was awarded as a firm fixed-price delivery order under an 8(a)...
- The U.S. Department of the Army Installation Management Command Southwest Region awarded a $182,751.00 Firm Fixed Price Delivery Order contract to Marsh Development, Inc., a woman-owned small disadvantaged business, for site uniform FTX containment services at Fort Huachuca in Sierra Vista, Arizona. This contract was not set aside for a specific business type. Marsh Development, Inc. is a certified minority-owned and woman-owned small business that provides construction, engineering, and...
- This is a firm fixed-price delivery order contract awarded by the U.S. Army Installation Management Command Southwest Region to Marsh Development, Inc., a woman-owned small business based in Arizona. The $113,049.00 contract is for the repair of the courtyard and entryway at Fort Huachuca in Sierra Vista, Arizona. The contract has a total small business set aside designation. Marsh Development, Inc. is a construction, engineering, and facility services provider that has been awarded over 30...
- This firm fixed-price delivery order contract was awarded by the Department of the Army Installation Management Command Southwest Region to Marsh Development, Inc., a woman-owned small disadvantaged business based in Arizona. The $98,808.00 contract is for the repair of the interior of Building 31043 at Fort Huachuca in Sierra Vista, Arizona. The contract was set aside for small businesses. Marsh Development has been awarded over 30 federal contracts as a prime contractor since 2019, primarily...
This federal contract award, with ID W9124A09C0044, was issued by the Southwest Region of the U.S. Department of the Army's Installation Management Command (IMCOM) to Marsh Development, Inc., a woman-owned small disadvantaged business based in Arizona. The $49,416.00 firm fixed-price contract requires Marsh Development to repair a damaged sewer main between two manholes at Fort Huachuca in Sierra Vista, Arizona. The work includes surveying, excavation, pipe placement, and testing, and is funded through the American Recovery and Reinvestment Act (ARRA). This contract was set aside for HUBZone small businesses and has a completion date of February 26, 2010.
Generated 4/2/25, 10:09 AM
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
RECOVERY--Z--RECOVERY--PROJECT NUMBER FEE09349J, REPAIR SEWER LINE FROM MAN HOLE 8-70 THRU 7-125, FORT HUACHUCA, ARIZONA | W9124A09B0006 | Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground | Award Notice 1/1 | 7/22/09, 4:34 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00001 | Change Order | $0 | 11/25/09 | |
| Not listed | Not listed | $49.4k | 9/29/09 |