The Department of the Army Corps of Engineers Engineering District Sacramento awarded a Firm Fixed Price contract to James Fisher, a for-profit organization, for the Hamilton City Phase 2A Construction Project. The contract, which was set aside for HUBZone small businesses, has a potential value of $8,778,863.13 and a completion date of March 24, 2019. The project involves the construction of approximately two miles of setback levee embankment, including features such as a seepage berm,...
<p>This $2,364,874.39 firm fixed-price federal contract was awarded by the U.S. Army Corps of Engineers to RDA Contracting, Inc., an 8(a) sole source, minority-owned, small disadvantaged business, for the Sacramento River Mile 16.8L Erosion Control Stabilization project. The contract has a completion date of November 29, 2016 and was awarded on July 21, 2016. The place of performance is Isleton, California.</p>
This is a definitive contract awarded by the U.S. Army Corps of Engineers, Sacramento District to James Fisher Jr. Excavating, a for-profit organization. The $38,547,809.63 firm-fixed-price contract is for the Hamilton City Phase 2B Levee Improvement Construction Project, which involves the construction of seepage berms, the degrading of an existing J-levee, the relocation of a drainage pump structure, and the construction of drainage culverts and access ramps. The contract was awarded on a...
The U.S. Army Corps of Engineers Engineering District Sacramento awarded a $3.7 million firm fixed price contract to Camenzind Dutra JV LLC to address erosion along 1,150 feet of the Sacramento River. The contract was awarded under Solicitation Sacramento River Erosion Contract 1 to install erosion protection including clearing, quarry stone placement, soil installation, in-stream wood placement, grass seeding, fencing and signage. The work will be performed in North Highlands, California from...
This is a $1,305,887 firm fixed price delivery order contract awarded by the U.S. Army Corps of Engineers, Sacramento District (ENDIST Sacramento) to HDR Fugro WLA, a for-profit Subchapter S Corporation. The contract is for the 60% plans and specifications, design documentation report, cost estimate, environmental compliance, and real estate mapping for the American River Common Features, Natomas Basin Reach I Phase 2 project in Sacramento County, California. The contract does not have a...
This is a firm fixed-price delivery order contract awarded by the U.S. Army Corps of Engineers (USACE), Sacramento District, to HDR Fugro WLA. The contract is for $1,236,708.78 and is related to the American River Watershed Common Features project, a flood risk management initiative authorized under the Water Resources Development Act of 1996 (WRDA96). The contract includes the Final Remediation Methods Report, 30% and 60% design plans, a Draft Design Documentation Report, rights-of-way and...
This is a firm fixed-price definitive contract awarded by the U.S. Army Corps of Engineers (USACE) to PRS Newland JV, a minority-owned small disadvantaged business. The contract, valued at $8,601,475.06, is for the PROJECT: SOUTH SAC STREAMS in Sacramento, CA. The contract has a competitive 8(a) set-aside designation and an ultimate completion date of July 2, 2017. As this is a definitive contract, the full scope of the project can be reasonably inferred to involve construction or engineering...
The U.S. Army Corps of Engineers, Engineering District Sacramento awarded a $70.3 million firm fixed price contract to Maloney-Odin JV on February 14, 2020. The contract is for improvements to approximately three miles of the Sacramento River East Levee in Sacramento, California under the American River Common Features, Sacramento River East Levee, Contract 1 project. Work will involve degrading and reconstructing over two miles of levee, constructing cutoff walls and berms totaling around...
<p>The U.S. Department of the Army Corps of Engineers Engineering District Sacramento awarded a Firm Fixed Price Definitive Contract to Steelhead Constructors, Inc., a for-profit small business organization, to perform PL84-99 Levee Repairs at Site 1151-17 in Redding, California. The potential value of the contract is $1,430,343.90, with a completion date of July 30, 2020. This contract was set aside for small business participation.</p>
This is a firm fixed-price delivery order awarded by the U.S. Army Corps of Engineers (USACE) Sacramento District to HDR Fugro WLA, a for-profit subchapter S corporation, for $449,668.71. The contract is for geotechnical investigations and development of final plans and specifications for construction related to the American River Common Features (ARCF) - Reach I, Natomas Basin, Sacramento, CA project, which is an ARRA (American Recovery and Reinvestment Act) recovery project. The contract...