Definitive Contract NNC17CA16C
- Not listed
- The Boeing Company has been awarded a definitive contract by the National Aeronautics and Space Administration (NASA) Armstrong Flight Research Center. Under the terms of the $6.1 million firm fixed price contract, Boeing will assist NASA in reducing risks associated with future ground and flight test efforts in support of the Electrified Powertrain Flight Demonstrator program. The work will be performed in St. Louis, Missouri through December 2021. As the prime contractor, Boeing will...
- General Electric Company's GE Aviation division received a $214.9 million firm fixed-price definitive contract from NASA's Armstrong Flight Research Center, awarded September 30, 2021, to support the development and certification of megawatt-class electrified aircraft propulsion systems for integration into future commercial aircraft. The contract, which extends through September 29, 2026, directly supports NASA's initiative to accelerate the introduction of electrified powertrain technologies...
- The National Aeronautics and Space Administration Langley Research Center awarded a $1.1 million cost-plus-fixed-fee delivery order contract to National Institute Of Aerospace Associates for system analysis of electrified propulsion systems for subsonic transports beyond 2030. The prime contractor will perform system and uncertainty analysis on relevant electrified propulsion technologies to identify options, establish performance metrics, and develop task plans for the Agency's Electrified...
- The U.S. Glenn Research Center has awarded a $1,870,220.00 cooperative agreement to The Boeing Company's Engineering, Test & Technology Division to develop an ultra-lightweight, highly efficient, megawatt-class, cryogenically-cooled inverter for future all-electric aircraft applications. The University of Tennessee-Knoxville will support the project by evaluating topologies, selecting semiconductor devices, and prototyping the inverter. The goal is to create an inverter technology capable of...
- NASA's Glenn Research Center awarded a $3.49M cost-plus-fixed-fee definitive contract to Electra.aero Inc., a small business specializing in advanced air mobility and electric aircraft technologies, on September 3, 2024. The contract, which extends through July 3, 2026, supports the Advanced Aircraft Concepts for Environmental Sustainability in 2050 (AACES 2050) study. Under this effort, Electra.aero will develop scenarios providing context for designing and assessing next-generation aviation...
- The Boeing Company's Engineering, Test & Technology Division received a $3.4 million cost-plus-fixed-fee delivery order from NASA's Langley Research Center under the Basic and Applied Aerospace Research and Technology (BAART) indefinite delivery vehicle to support the FUELEAP (Fostering Ultra-Efficient, Low-Emitting Aviation Power) program. Under this task order, Boeing will develop engineering data for the design and development of a heavy-fuel, hybrid-electric solid oxide fuel cell...
- NASA's Glenn Research Center awarded Georgia Tech Research Corporation a $1.37M cost-no-fee definitive contract on September 27, 2024, to develop future scenarios for mid-century sustainable aviation. Under this research effort, which is scheduled for completion by May 27, 2026, Georgia Tech will identify critical technologies, subsystems, and aircraft concepts aligned with the Advanced Aircraft Concepts for Environmental Sustainability in 2050 (AACES 2050) initiative. The contractor will...
- This $2,599,566 firm fixed-price definitive contract was awarded by the National Aeronautics and Space Administration's Glenn Research Center to The Boeing Company's Engineering, Test & Technology Division for a research and development effort focused on high-speed endoatmospheric commercial vehicle conceptual design study and technology roadmaps development. The contract has a completion date of November 29, 2024 and does not utilize a set-aside designation. The original pre-solicitation...
- The National Aeronautics and Space Administration Armstrong Flight Research Center awarded a $7.5 million firm fixed price contract to The Boeing Company Engineering, Test & Technology Division for future subsonic demonstrator risk reduction activities. The contract will assist NASA in reducing risk and cost for potential future flight demonstrations supporting sustainable aviation goals and the agency's subsonic transport objectives. Per the solicitation, Boeing will help achieve mid-term...
- This is a $1,871,264.00 firm fixed-price contract awarded by the National Aeronautics and Space Administration (NASA) Armstrong Flight Research Center to The Boeing Company's Engineering, Test & Technology Division. The contract is to assist NASA in defining the technical approach, schedule, and cost for potential procurement of X-plane aircraft that support NASA's goals for ultra-efficient subsonic transport. The contract does not have a small business set-aside designation. Boeing is the...
The Boeing Company was awarded a $1,013,111 firm-fixed-price contract by the National Aeronautics and Space Administration (NASA) Glenn Research Center to develop an advanced single-aisle class commercial transport concept with expected entry into service in the mid-term time frame (2035 or earlier) where a significant amount of electrical power is used to generate thrust. The contract requires modeling and performance analysis of the electrified propulsion concept against a similar-technology level aircraft using conventional propulsion, evaluating criteria such as mission energy, life-cycle carbon, NOx emissions, and noise. The results will be compared to quantify the potential benefits of electrified propulsion in a single-aisle aircraft. This contract does not have a set-aside designation. Georgia Tech Research Corporation is identified as a subcontractor providing research, engineering, and technical services in direct support of the prime contract.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 9 | Close Out | $0 | 12/4/18 | |
| 8 | Other Administrative Action | $0 | 10/19/18 | |
| 7 | Funding Only Action | $14.0k | 9/19/18 | |
| 6 | Other Administrative Action | $0 | 8/30/18 | |
| 5 | Other Administrative Action | $0 | 6/20/18 |