Definitive Contract N4008515C6104
- Not listed
- This is a firm-fixed-price contract awarded by the Naval Sea Systems Command (NAVSEA) to Methuen Construction Co Inc. (MC), a for-profit construction company, for the DD#2 PROPULSOR ENCLOSURE project. The contract has a ceiling value of $5,936,265.00 and an ultimate completion date of January 5, 2018. This contract is not associated with a larger contract vehicle and does not have a set-aside designation. MC, a general contractor specializing in industrial and commercial construction, has a...
- This is a $42,963,360.19 firm-fixed-price contract awarded by the Naval Facilities Engineering Command (NAVFAC) to Methuen Construction Co Inc. (MC) for the P-266 Structural Shops Consolidation project in Kittery, Maine. The contract involves general construction services, including design, construction, and modifications to facilities at the Portsmouth Naval Shipyard. MC is a for-profit construction firm that has previously received multiple large contracts from the U.S. Navy for construction...
- This is a $93,336,533.10 firm-fixed-price contract awarded by the Naval Sea Systems Command (NAVSEA) to Methuen Construction Co Inc. (MC) for the design-bid-build of the Dry Dock 2 Complex at the Portsmouth Naval Shipyard in Kittery, Maine. The project involves the fabrication and installation of approximately 23,100 square feet of multiple enclosures, including a 21,500 square foot permanently installed enclosure and a 1,600 square foot modular relocatable enclosure, as well as associated...
- This is a firm-fixed-price definitive contract awarded by the U.S. Navy's Naval Installations Command to Methuen Construction Co Inc., a general contractor, for portal crane rail repairs at the Kittery, Maine facility. The $20,785,970.00 contract has a completion date of February 26, 2024 and does not utilize any set-aside designations. Methuen Construction Co Inc. specializes in heavy industrial and commercial construction, including design-build and project management services for the U.S....
- This is a firm-fixed price contract awarded by the Naval Facilities Engineering Command (NAVFAC), a Defense agency, to Methuen Construction Co. Inc. (doing business as Supreme Metal Fabricators) for the Phase 4 Descope of the P-293 Paint, Blast and Rubber Consolidation Facility project at the Portsmouth Naval Shipyard in Kittery, Maine. The contract, which has a ceiling value of $113,114,946.93 and a completion date of February 23, 2025, does not have a set-aside designation. The project...
- The Department of the Navy Installations Command awarded a firm-fixed-price definitive contract valued at $18,519,741.97 to Methuen Construction Co Inc. to replace the main dewatering pumps and perform facility repairs at Dry Dock 2 at the Portsmouth Naval Shipyard in Kittery, Maine. The project aims to restore reliability and reduce risk for docking and undocking of submarines undergoing maintenance, overhaul, and reactor servicing by replacing the original direct current-powered pumps...
- The Naval Sea Systems Command awarded a $99.8 million firm fixed-price definitive contract to Cianbro Corporation on December 6, 2024, for pre-construction services related to the Dry Dock 2 Complex at Portsmouth Naval Shipyard in Kittery, Maine. The contract, which carries an ultimate completion date of June 26, 2026, was awarded without set-aside designation, reflecting Cianbro's competitive positioning as a large-scale federal contractor. These pre-construction services represent critical...
- This is a $16,720,790 firm fixed price definitive contract awarded by the Department of the Navy Installations Command to The Nutmeg Companies, Inc. for the DBB (Design-Build-Bid) Reactor Servicing Ship Support, Building 2 renovations project at the Portsmouth Naval Shipyard in Kittery, Maine. The contract was not set aside for any specific business size or socioeconomic category. The project involves a complete interior and exterior renovation of the historic four-story, 23,670 square foot...
- The U.S. Navy Installations Command awarded a $1,045,117.01 firm-fixed-price delivery order contract to Cambridge Marine Construction, Inc., a minority-owned, small disadvantaged business, to provide tank inspection and repair services at the Portsmouth Naval Shipyard in Kittery, Maine. The contract has an ultimate completion date of December 14, 2021 and was not set aside for any special designation. The contract is associated with a broader Navy procurement vehicle, but no additional details...
- Cianbro Corporation, an employee-owned construction and engineering firm headquartered in Pittsfield, Maine, was awarded a $65.9 million firm fixed-price definitive contract by the Naval Sea Systems Command on June 27, 2017, for the Portsmouth Naval Shipyard (PNSY) Dry Dock 1 Defueling Complex in Kittery, Maine. This no-set-aside contract, with an ultimate completion date of November 16, 2021, supported critical infrastructure modernization at the naval shipyard, one of the Navy's primary...
This is a $2,616,915.66 firm-fixed-price contract awarded by the Naval Sea Systems Command to Methuen Construction Co Inc., a general contractor based in Plaistow, New Hampshire. The contract is for the DD#3 PROPULSOR ENCLOSURE, which involves construction services at the Kittery, Maine facility to support Navy cargo handling operations. The contract has no set-aside designation and was awarded on April 23, 2015 with a target completion date of September 29, 2016. Methuen Construction Co Inc., also known as MC, is an experienced provider of construction services to the U.S. Department of the Navy, having completed several large projects at the Portsmouth Naval Shipyard, including a $93.3 million contract for the Dry Dock 2 Complex and a $99.6 million contract for the P-293 Paint, Blast and Rubber Consolidation Facility.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
Dry Dock 3 Propulsor Enclosure Pre-Solicitation | N4008515B6104 | Department of the Navy Naval Facilities Engineering Command | Award Notice 2/3 | 1/26/15, 11:23 AM | |
Dry Dock 3 Propulsor Enclosure | N4008515B6104 | Department of the Navy Naval Facilities Engineering Command | Award Notice 1/3 | 12/29/14, 9:44 AM | |
The work provides for new components and the modification of existing components to make a complete and usable Propulsor Enclosure. | N4008515B6104 | Department of the Navy Naval Facilities Engineering Command | Award Notice 3/3 | 4/24/15, 7:53 AM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00002 | Supplemental Agreement for work within scope | $47.2k | 9/15/16 | |
| P00001 | Supplemental Agreement for work within scope | $88.0k | 1/15/16 | |
| Not listed | Not listed | $2.5m | 4/23/15 |