This is a $371,582.65 firm fixed price contract awarded by the Department of the Interior Fish and Wildlife Service Region 1 to Pipkin Inc., a small business construction company, to replace the well piping and power at the Entiat National Fish Hatchery located in Entiat, Washington. The contract was competitively awarded under a total small business set-aside and was issued in response to a pre-solicitation posted on December 20, 2018. Pipkin Construction Division, the prime contractor,...
This is a $671,687 firm fixed-price contract awarded by the Bureau of Reclamation (an agency of the U.S. Department of the Interior) to TEK Construction, Inc., a self-certified small disadvantaged business, for the Leavenworth National Fish Hatchery Surface Water Intake Fish Screens and Fish Passage Phase II Pipe Rehabilitation project in Leavenworth, Washington. The contract is for replacing deteriorated pipe segments, constructing manhole access points, and replacing a control valve system...
This is a $1,985,111.72 firm-fixed-price contract awarded by the U.S. Department of the Interior (DOI) Fish and Wildlife Service Region 6 to RJS Construction Inc., a Native American woman-owned small business, to rehabilitate the water treatment system at the Saratoga National Fish Hatchery in Wyoming. The contract was set aside for total small business and has a completion date of June 27, 2025. The work includes repairs and replacements to concrete masonry, piping systems, drum filters, and...
This is a firm fixed-price delivery order awarded by the U.S. Department of the Interior (DOI) Fish and Wildlife Service Region 1 to Cherokee General Corp, an Alaskan Native Corporation-owned small disadvantaged business. The $89,592.59 contract is for the rehabilitation of valves and a water pipeline at the Makah National Fish Hatchery in Neah Bay, Washington. The contract does not have a set-aside designation and was awarded on March 24, 2010, with a final completion date of July 30, 2010.
This is a firm-fixed-price purchase order awarded by the U.S. Army Corps of Engineers (USACE) to RJS Construction Inc., a Native American woman-owned small business. The $494,761.95 contract is for the LOWER GRANITE LOCK AND DAM ADULT FISHWAY CONTROL project, which involves construction and upgrades at the Lower Granite Lock and Dam in Pomeroy, Washington. The contract was awarded on a sole-source 8(a) basis, leveraging RJS Construction's small business and socioeconomic certifications. RJS...
This is a $69,500.00 firm-fixed-price delivery order awarded by the Department of the Interior Fish and Wildlife Service to National Native American Construction, Inc., a construction company certified as an Economically Disadvantaged Women-Owned Small Business, Indian Economic Enterprise, and Woman-Owned Small Business. The contract is to perform remodeling work on Quarters #1 at the Quilcene National Fish Hatchery in Washington state. The work is being conducted under the Great American...
This is a $643,756.96 firm fixed-price delivery order awarded by the Bureau of Reclamation, a civilian federal agency, to National Native American Construction, Inc. (NNAC), a certified Economically Disadvantaged Women-Owned Small Business (EDWOSB) and Indian Economic Enterprise. The contract is for materials to support the Ouray National Fish Hatchery and has an ultimate completion date of August 30, 2025. This award is part of a larger $250 million Great American Outdoors Act Multiple Award...
This is a $196,774.25 firm fixed price definitive contract awarded by the U.S. Army Corps of Engineers to RJS Construction Inc., a Native American woman-owned small business, to perform concrete repair work on a fish ladder in Seattle, Washington. The contract was awarded under an 8(a) sole source set aside. RJS Construction Inc. will be performing the work with a subcontractor, Leewens Corp., a woman-owned small business. This contract appears to be part of a larger indefinite delivery,...
The Department of the Interior Bureau of Reclamation awarded a $7,841,397.76 firm-fixed-price contract to RJS Construction Inc., a Native American woman-owned small business, for the Grand Coulee Third Power Plant Roof Replacement project. The work involves removing and replacing the existing roof assembly, repairing concrete damage, and installing new roof components. RJS Construction is managing the project as the prime contractor, with subcontractors providing specialized services like flex...
The Bureau of Reclamation awarded a $16,787,120.33 firm-fixed-price contract to Pipkin Inc., a small business construction firm, to conduct the Leavenworth National Fish Hatchery Surface Water Intake Fish Screen and Fish Passage Project Phase I. The work, which is set aside for small businesses, involves demolition, earthwork, concrete structures, mechanical and electrical systems, and other infrastructure upgrades at the hatchery located near Leavenworth, Washington. This contract is part of...