Definitive Contract INPC3450090464

Award Date 4/27/10
Potential Completion Date 11/19/11
Potential Value $98K
Federal Agency
National Office
Ultimate Awardee
Not listed
PSC Category
Not listed
Federal Contract Vehicle
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Washington, DC 20008, USA
Solicitation Procedures
Negotiated Proposal / Quote
Number Of Offers Received
11
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This is a $219,500.00 firm fixed-price definitive contract awarded by the U.S. Army Corps of Engineers, New England District to Rockwood Corporation for the repair and painting of a service bridge at Littleville Lake in Huntington, Massachusetts. The contract does not have a set-aside designation. The work is scheduled for completion by November 13, 2010. This contract appears to be part of the agency's Recovery Act projects, which aim to stimulate the economy through infrastructure...
The United States Department of Agriculture Forest Service, Eastern Region awarded RB Construction Company a $382,523.11 delivery order against the Great American Outdoors Act Multiple Award Task Order Contract for the rehabilitation of the Morgan Creek Bridge on Forest Route 199-4.8 located in Marengo, Wisconsin. The firm fixed price order has a period of performance starting on September 23, 2022 through September 29, 2023 for the specified bridge rehabilitation work. No applicable...
This is a $161,583.50 firm fixed-price definitive contract awarded by the U.S. Department of Agriculture's Operations Center East to R C Construction Co And Son Inc., a woman-owned small business. The contract is for the demolition of reinforced concrete and corrugated metal pipe located within the Monday Creek streambed, as well as the construction of a reinforced concrete abutment, installation of a prefabricated steel bridge, excavation and fill placement, guardrail construction, rock...
This is a $856,242.99 firm fixed-price delivery order awarded by the U.S. Army to Russell Construction Co., Inc. to repair the Railroad Bridge - Structure 228 on the Rock Island Arsenal. The project involves designing a new deck, removing the existing ballast and timber deck, inspecting the floor beams, and constructing a new deck on the west half of the bridge. It also includes walkway and handrail improvements. The award was made under the Recovery Act (ARRA) and does not have a set-aside...
<p>This is a firm fixed-price delivery order awarded by the U.S. Department of Defense's Southwest Region to Rocky Mountain Materials and Asphalt, Inc. under Contract No. W911RZ06D0020. The order, valued at $471,403.84, is for the removal and replacement of Bridge No. T85115. The work is to be completed by August 1, 2011. This order was not set aside for any specific business type.</p>
This is a $594,299.81 firm fixed-price contract awarded by the U.S. Department of Agriculture's Intermountain Operations Center to Engleman Steel Erection, Inc. to perform the TAS Recovery Clearwater NF Forest-Wide Trail Bridge Repair Project. The project involves deferred maintenance on a trail suspension bridge in the Lochsa Corridor. The contract was awarded under the American Recovery and Reinvestment Act (ARRA) Major Program Code for Forest Service Capital Improvement and Maintenance,...
This firm fixed-price delivery order was awarded by the U.S. Army Corps of Engineers' New England District to Pioppi Construction, Inc., a total small business contractor, on July 6, 2009. The $9,000 contract is to provide repairs to the Pond Bridge Road in Fiskdale, Massachusetts, with an ultimate completion date of September 30, 2009. This contract is funded through the American Recovery and Reinvestment Act (ARRA). Pioppi Construction has previously performed infrastructure maintenance,...
This federal contract award, DTFH7116C00003, was issued by the Federal Highway Administration, a civilian agency, to Workman Industrial Services, Inc., a for-profit organization. The contract, valued at $345,266.70, is for the rehabilitation of the Hillside Pedestrian Bridge within Cuyahoga National Park, including replacing the timber decking with a fiber-reinforced polymer system, replacing the structural steel flooring, and other miscellaneous work. The contract is a definitive,...
This contract was awarded by the U.S. Forest Service (FS) to Erickson Builders &amp; CO. Inc. for the &quot;AQUATIC ORGANISM PASSAGE STRUCTURES - HEARTBREAK CREEK BRIDGE&quot; project. The contract has a ceiling value of $246,993.89 and is funded through the American Recovery and Reinvestment Act (ARRA) under the FS Capital Improvement and Maintenance program. The work involves furnishing and installing a bridge over Heartbreak Creek. The contract is a definitive, firm-fixed-price contract and...
This is a delivery order contract awarded by the USDA Forest Service Alaska Region to Rock-N-Road Construction, Inc., a self-certified small disadvantaged business and woman-owned small business based in Alaska. The $412,600 firm-fixed-price contract is for the GAOA (Great American Outdoors Act) Central Prince of Wales Road Improvements project, which involves removing an existing 15'5&quot; span x 105&quot; rise structural plate bridge and replacing it with a 60-foot long 4-girder steel bridge,...

RECOVERY, ROLLING MEADOW BRIDGE REPAIR, ROCR, PMIS #131011 THE WORK OF THIS CONTRACT INCLUDES PROVIDING ALL PARTS, MATERIALS, LABOR, AND SUPERVISION NECESSARY FOR REPAIRING THE EAST ABUTMENT OF ROLLING MEADOW BRIDGE, REBUILDING THE ADJACENT STREAM BANK AND SLOPE PROTECTION. MAJOR WORK ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION, CONCRETE FOOTINGS, FOUNDATION, AND SLAB, CONSTRUCTION OF TEMPORARY DEWATERING MEASURES, PLACEMENT OF FILL, AND INSTALLING RIP RAP. ALL WORK SHALL BE PERFORMED IN FULL ACCORDANCE WITH THE ATTACHED DRAWINGS, SPECIFICATIONS, CLAUSES AND PROVISIONS.

Posted 4/27/10, 12:00 AM