The Department of the Interior National Park Service Southeast Region awarded a definitive, firm-fixed-price contract to Makko Construction L.L.C., an 8(a) certified small disadvantaged business, to replace lift stations and controls at 5 Calle La Puntilla, San Juan, Puerto Rico. The $190,834.84 contract has an August 28, 2023 completion date and was awarded on August 25, 2022. This 8(a) sole-source contract is part of the National Park Service's efforts to maintain and upgrade infrastructure at...
The National Park Service Pacific West Region awarded a $4.46 million firm-fixed price contract to JMG Constructors LLC to rehabilitate the wastewater system at Log Cabin Resort in Olympic National Park, Washington. The scope of work involves replacing the extended aeration treatment system with a recirculating textile filter system, constructing a new subsurface drip disposal drain field, and rehabilitating the existing gravity sewage collection and conveyance system, as outlined in the...
This is a firm-fixed-price definitive contract awarded by the National Park Service (NPS), a civilian federal agency, to Saybr Contractors, Inc., a woman-owned small business. The $450,783 contract is for the construction of an 8-inch potable water distribution line, fire hydrants, water meters, and associated infrastructure to connect the Elwha Heights area to the Dry Creek Water Association's water system within Olympic National Park. The project includes clearing, installation, cleanup, and...
The Department of the Interior National Park Service Pacific West Region awarded a $3.4 million firm-fixed-price definitive contract to RJS Construction Inc. to rehabilitate the public water system at Heart O' the Hills Campground in Olympic National Park near Port Angeles, Washington. The work includes replacing the well pump, controls, electrical systems, water treatment building, chlorine storage and feed systems, water storage tank components, distribution piping, backflow prevention, and...
This is a firm-fixed-price federal contract awarded by the U.S. Department of the Interior, National Park Service (NPS) to Allison-Sierra, Inc., a Small Business Administration (SBA) certified HUBZone firm, for the installation of potable water and wastewater connections to a fire office trailer in Yosemite National Park, California. The contract has a ceiling value of $54,410.00 and a completion date of October 14, 2024. The work includes trenching, installing new water and sewer lines, and...
This is a firm fixed-price purchase order awarded by the Department of the Interior's Bureau of Land Management (BLM) California Region to Apex Global Construction Inc., a minority-owned small disadvantaged business, for $68,350.00 to perform waterline repairs at three campgrounds in Inyo County, California. The contract, which is set aside for small businesses, was awarded under the Great American Outdoors Act (GAOA) and involves installing approximately 580-840 linear feet of 4-inch buried...
This contract was awarded by the Department of the Interior's National Park Service Intermountain Region to Advanced Solutions Group, LLC, a small disadvantaged business, to replace deteriorated water lines at three campgrounds within the Chickasaw National Recreation Area in Oklahoma. The $630,650.04 firm-fixed-price delivery order includes construction of new water distribution mains, service lines, meters, and associated infrastructure, as well as removal and abandonment of existing water...
This is a Firm Fixed Price Purchase Order awarded by the Bureau of Prisons (agency ID 1500|1540|15B306-A) to the Puerto Rico Aqueduct and Sewer Authority (PRASA), also known as Autoridad De Acueductos Y Alcantarillados De PR (AAA), for an estimated $1,435,627.46 in water and sewer utility services for the Metropolitan Detention Center Guaynabo from October 2015 through September 2016. The contract does not have a set-aside designation. PRASA is the main provider of drinking water and...
This is a Definitive Contract awarded by the U.S. Southeast Region (1400|1443|VPNPSSE-A) for the replacement of an existing water line at a facility in St. Augustine, Florida. The contract was set aside for competitive 8(a) companies and was awarded to Trainingcore, Inc. on December 22, 2009, with a Firm Fixed Price of $45,597.00 and an ultimate completion date of April 30, 2010. The contract is for the replacement of the water line from the main backflow preventer pipe at the south gate area,...
This is a $1,573,210.53 firm fixed price definitive contract awarded by the Naval Facilities Engineering Command (NAVFAC) to Aloha Construction Services, Inc., an 8(a) certified economically disadvantaged women-owned small business (EDWOSB). The contract is for the replacement of potable water tanks at locations in San Diego, California, with a completion date of February 3, 2025. This award was made as an 8(a) sole source set-aside, allowing NAVFAC to directly contract with this small...