The U.S. Department of Agriculture Forest Service awarded a $219,160 firm fixed price delivery order to Ketchikan Ready-Mix & Quarry, Inc. to remove and dispose of an existing corrugated metal pipe on Road 3036 at milepost 0.27 in Coffman Cove, Alaska and replace it with a 55-foot structural plate arch culvert composed of a corrugated metal arch and concrete footings. The contractor will also restore the streambed upstream and downstream. There was no set-aside designation for this award...
The Department of Agriculture Forest Service awarded a $274,427 firm fixed price definitive contract to Cp&G Construction LLC, doing business as Cp&G, to complete construction of Forest Service Road 404 Cane Creek Culvert Replacement in Georgetown, South Carolina. The solicitation sought replacement of an existing 10'9" x 6'7" x 47' culvert with a new 19' x 8'2" x 46' structural plate aluminum arch culvert. With a period of performance of 180 calendar days, the...
This $872,000 firm fixed price contract was awarded by the Department of the Air Force Reserve Command to Seawolf Construction Corp, doing business as Imperial Construction & Electric, to construct and repair Outfall 9 Culvert at Poorhouse Creek located at Dobbins Air Reserve Base in Georgia. The work involves eliminating accumulation of heavy debris at the Anti-Terrorism structure upstream of the culvert by completing site preparation, drainage work, retaining walls, culvert features and...
This is a $139,000.00 firm fixed price contract awarded by the Southeast Region office of the National Park Service to Mahto Construction, Inc., an 8(a) sole source awardee. The contract is for the replacement of culverts along the Chattahoochee River National Recreation Area in Sandy Springs, Georgia. Mahto Construction, Inc. is a minority-owned, small disadvantaged business that is also veteran-owned and DOT certified as a Disadvantaged Business Enterprise (DBE). The contract has a performance...
The Department of the Army Corps of Engineers awarded a $443,930 firm fixed price contract to Tag Contracting, Inc. to complete the Warrior Creek Park Roadway Repair project in Wilkesboro, North Carolina. The solicitation sought a contractor to remove a collapsed 24-inch corrugated metal pipe culvert approximately 25 feet below a roadway that is 130 linear feet in length, and replace it with a similarly sized reinforced concrete pipe. The contractor will also perform associated work including...
This firm-fixed-price delivery order, awarded to Snow Country Contracting Inc., a certified HUBZone small business, is for the replacement of culverts on two forest routes in Wisconsin to improve aquatic organism passage. The $301,345.75 contract was issued by the U.S. Forest Service's Eastern Region under a multiple-award IDIQ vehicle for roads and general construction services. The work involves replacing undersized culverts with concrete box structures on Forest Routes 2174 and 2452A to...
This federal contract award is for the CA EROSION CONTROL CULVERTS project, which aims to reduce erosion and provide stability near the missile haul route at Kings Bay Base in Georgia. The $1,935,110.00 firm-fixed-price delivery order was awarded to U-Smc / Demaria Jv1, LLC, a service-disabled veteran-owned small business joint venture. The contract involves replacing mitered end sections with winged headwalls and adding channel lining. This delivery order is part of a larger $258 million...
This is a firm fixed-price federal contract awarded by the U.S. Department of Agriculture Forest Service to M R Construction, a small disadvantaged and HUBZone certified business, to replace a culvert on Forest Service road 40N39 that crosses Kelly Gulch in the Klamath National Forest near Etna, California. The contract, valued at $475,417.50, involves installing a 15-foot span by 6-foot 7-inch rise multi-plate arch culvert with a simulated streambed to allow for aquatic organism passage. This...
This is a firm-fixed price contract awarded by the Department of Agriculture Forest Service R8-Southern Region to GC Works Inc., an 8(a) and HUBZone certified small disadvantaged business, for the NFSR 601 Culvert Replacement project on the Talladega National Forest in Alabama. The $691,903.97 contract requires the removal of the existing low water crossing structure and the design and construction of a new 35-foot span by 13.5-foot rise aluminum box culvert, along with associated guardrails,...
The U.S. Department of Agriculture Forest Service awarded a $98,117.80 firm fixed price delivery order contract to Jack Bowen Excavating of Mt Tabor, Vermont. The contract calls for the replacement of an existing five-foot diameter culvert with a new seven-foot, three-inch wide by five-foot, three-inch high by seventy-eight-foot long aluminized steel pipe arch culvert. Additional work includes removal of an existing temporary bridge and its relocation. The contract was awarded on April 26,...