Definitive Contract FA813720C0029

Award Date 8/10/20
Potential Completion Date 6/20/21
Potential Value $1.5M
Funding Federal Agency
Air Force Materiel Command
Contracting Federal Agency
Air Force
Ultimate Awardee
Not listed
Set-Aside Type
No Set-Aside Used
Federal Contract Vehicle
Extent Competed
Not Competed
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Oklahoma City, OK 73145, USA
Solicitation Procedures
Only One Source
Number Of Offers Received
1
Legislative Mandate
Not listed
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This is a firm-fixed-price delivery order awarded by the Air Force Materiel Command (AFMC) to Cherokee Nation Environmental Solutions, L.L.C., a tribally-owned, small disadvantaged business certified as both an 8(a) and HUBZone firm. The contract, valued at $234,442.41, is for the replacement of a cooling tower fill, support tubes, louvers, and drift eliminators at a facility in Oklahoma City, OK. The work includes installing shut-off valves, pipe insulation, and providing as-built drawings....
This is a definitive contract awarded by the Air Force Materiel Command, a defense agency, to Native Star Group, Inc., an SBA-certified 8(a), HUBZone, and economically disadvantaged woman-owned small business. The contract, valued at $183,208.54, is for replacing the cooling tower fill at building B3708 at Tinker Air Force Base in Oklahoma City, Oklahoma. The contract has a firm fixed price and was awarded on September 16, 2019, with a completion date of December 8, 2020. This contract is not...
This is a $1,423,316.75 firm fixed-price definitive contract awarded by the U.S. Air Force Materiel Command to Native Star Group, Inc., an SBA-certified 8(a), HUBZone, and economically disadvantaged woman-owned small business, to replace cooling tower cells at Tinker Air Force Base in Oklahoma City, Oklahoma. The contract was awarded on June 3, 2021 as an 8(a) sole source set-aside, with a completion date of September 22, 2022. Native Star Group holds several large indefinite delivery vehicles...
This federal contract award from the Department of the Air Force Materiel Command Oklahoma City Air Logistics Complex is for $1,798,960.49 to Cherokee Nation Environmental Solutions, L.L.C. for repair of the HVAC system at Building B3113 in Oklahoma City, Oklahoma. The firm fixed price contract runs from September 2020 through September 2021. Cherokee Nation Environmental Solutions will serve as the prime contractor and will utilize two major subcontractors for portions of the work. Trade...
This is a firm fixed-price delivery order awarded by the Air Force Materiel Command (AFMC) to Tehama-Llc & HDR Joint Venture LP, a tribally owned small business joint venture, for preliminary 35% design work to replace the cooling tower fill at Tinker Air Force Base in Oklahoma. The contract has a ceiling value of $20,959.79 and a completion date of July 12, 2019. This work is likely part of the AFMC's broader efforts to maintain and upgrade the infrastructure and facilities at Tinker AFB....
This federal contract award, valued at $1,654,969.00, was issued by the Oklahoma City Air Logistics Complex, a unit of the U.S. Air Force Materiel Command. The contract was awarded to HGL Construction Inc., a minority-owned, self-certified small disadvantaged business, veteran-owned, and service-disabled veteran-owned business. The contract is for the replacement of a cooling tower at a facility, with a period of performance ending on July 8, 2025. HGL Construction Inc. is an experienced...
The Environmental Protection Agency's Office of Research and Development awarded Tower Engineering, Inc., doing business as T E I Cooling Towers, a $206,700 firm fixed price purchase order to repair and upgrade a cooling tower located in Ada, Oklahoma. Per the sole source notice of intent, T E I Cooling Towers will perform repairs to address needs at the cooling tower. As the prime contractor, T E I Cooling Towers will leverage specialized expertise in cooling tower maintenance and repair to...
This delivery order from the Department of the Air Force Materiel Command (DOD-USAF) is valued at $825,101.25 for replacement of an air handling unit at the Joint Oil Analysis Program Laboratory at Tinker Air Force Base in Oklahoma City, Oklahoma. The prime contractor is Cherokee Nation Environmental Solutions, L.L.C., with Matherly Mechanical Contractors, LLC as a major subcontractor. The firm fixed price order has a period of performance from June 2020 through February 2021. The work...
This is a $1,359,621.60 firm fixed price delivery order awarded by the Air Force Materiel Command to Doyon Management Services, LLC, an Alaskan Native Corporation-owned small disadvantaged business, for a project to repair the cooling tower at Wright-Patterson Air Force Base. The contract was issued under the Wright-Patterson AFB Construction Multiple Award Contract, a $95 million IDIQ vehicle that provides general construction services for the Air Force. The project involves repairs and...
Chiefs Construction Inc. was awarded a $428,437.80 firm fixed price definitive contract by the Department of the Air Force Air Education and Training Command to replace two cooling tower cells and associated components at Building 1002, Keesler Air Force Base, Mississippi. The contract is set aside for Service-Disabled Veteran-Owned Small Businesses. Chiefs Construction will replace the existing cooling tower cells and piping, valves, and controls to meet specifications for new cross-flow...

This definitive contract was awarded by the Department of the Air Force Materiel Command (DOD-USAF) to Cherokee Nation Environmental Solutions, L.L.C. for $1.5 million to replace the cooling tower at B3220 in Oklahoma City, Oklahoma. Oklahoma Electrical Supply Co. will provide electrical power replacement as a subcontractor, while Mid-Continent Group, LLC is responsible for the cooling tower and pump demolition and new construction under a separate subcontract. The project scope includes removing the existing tower and infrastructure and installing a new cooling tower, pumps, piping, and associated equipment. The contract has a period of performance from August 2020 through June 2021 and utilizes a firm fixed price contract type. No set aside designation was indicated.